Santa Clarita Valley to Simi ValleyRetainingWalls
Reinforced block and segmental retaining walls with a proper footing and a drain behind them, built with our wet winters and hillside lots in mind.
Retaining Walls at a glance
- Service
- Retaining Walls
- Service area
- Santa Clarita Valley, San Fernando Valley, north Los Angeles County, Ventura County, Antelope Valley
- Estimate
- Free, on site
- Typical start
- About two weeks after you approve the estimate
- Hours
- Monday to Saturday, 6 AM to 7 PM
- Phone
- (818) 464-5763
- License
- California 770901, C-8 Concrete and B General Building
- Company
- Ikon Concrete Design, family owned since 1999
Last updated November 2026
Retaining Wall Contractor in Santa Clarita and the San Fernando Valley
Retaining walls that hold the soil and let water out
We build retaining walls for homes and commercial properties across the Santa Clarita Valley, the San Fernando Valley and the hillside neighborhoods of Los Angeles and Ventura counties. Most are reinforced concrete block on a poured footing, and some are segmental block, the interlocking units that stack without mortar.
A retaining wall has two jobs: hold back the weight of the soil, and get rid of the water that soaks in behind it. Walls that lean or blow out have usually failed at the second job, so the walls we build get gravel and a drain line or weep holes, tied into a full drainage system when the yard needs one.
Building departments measure a retaining wall from the bottom of the footing to the top of the wall, not from the dirt you can see. A wall that shows 3 feet of block can be a 4 foot wall on paper.
Get a Free Estimate
What Goes Into Our Retaining Walls Work
Click any box to read more
Concrete block (CMU) walls on a footing
This is the standard retaining wall in our area: concrete block, vertical rebar that starts in the footing and runs up through the hollow cells, and grout around the steel. Block size and steel come from the plans or the city's standard plan. The City of Santa Clarita's standard plan grouts every cell solid and uses 12 inch block at the base of walls that retain more than 3 feet 4 inches.
Interlocking block for terraces and planters
Segmental walls use heavy interlocking units on a compacted gravel pad, with no mortar or rebar, and suit low terraces and planters. The National Concrete Masonry Association's guide covers the gravel zone behind the units and backfill compacted in thin lifts. In the City of Los Angeles, stacked block systems need a current LADBS research report or an approved evaluation report.
Gravel, pipe and weep holes
Behind the wall go clean gravel, a perforated pipe at the base with the holes facing down, and an outlet that carries the water to daylight at an approved spot. On short walls, open joints or weep holes in the bottom course can do that work, but not where the water would run across a walkway or onto the neighbor's lot.
Slopes, driveways and other loads above the wall
Engineers call any extra load above a wall a surcharge: a rising slope, a driveway, a pool, another wall or a building footing. Surcharge changes the footing, the steel and the permit rules. If your wall has anything but level ground behind it, plan on engineered drawings, and we build from your engineer's stamped plans.
In A Rush? Let's Talk Now!


Why hire a concrete crew for a retaining wall
The part of a retaining wall that does the holding is underground: an excavated key, a reinforced concrete footing, and steel set in the right cells before the grout goes in. That is concrete work, like the foundations we pour, and Ikon has done it under California contractor license 770901 (C-8 Concrete and B General Building) since 1999.
We are a family owned company with a crew of eight. Gilbert Rico, the owner, looks at the slope, the access and where the water goes before he prices anything. The estimate is free, and most walls start about two weeks after you say yes, or when the permit is issued on engineered walls.
Get a Free EstimateSigns a retaining wall is failing
- The wall leans out at the top or has a visible belly in the middle
- Stair step gaps open along the mortar joints, or one long split runs along a single course
- White mineral streaks or damp patches stay on the face long after rain
- Weep holes are buried, plugged or were never there
- Soil has sunk or opened a gap behind the top of the wall
What drives the cost of a retaining wall
Height is the biggest factor, and not in a straight line: doubling the height more than doubles the footing, the steel and the excavation. Length, access, engineering and permits come next, and any wall carrying a surcharge costs more than one holding level ground.
Sloped and tight access sites, which describes a lot of hillside lots here, take more time, and the drainage behind the wall is part of the price. Every wall is different, so our number comes from a free estimate at your property.
How we build a block retaining wall
- Site check. We measure the height from where the bottom of the footing will be and tell you whether the wall falls under the permit rules where you live.
- Footing trench. Utilities are marked through 811 and the trench is cut into undisturbed soil. Los Angeles requires footings at least 12 inches into natural ground, and Santa Clarita's standard plan adds a 12 inch wide key underneath to resist sliding.
- Steel and pour. Horizontal bars and vertical dowels are tied up off the soil and inspected where a permit applies. The footing is poured with concrete at the strength the plans or the standard plan call for.
- Block and grout. Block goes up in running bond with rebar in the cells. On Santa Clarita's standard plan the inspector sees the wall at mid height and again at the top before each grout pour.
- Drain and backfill. The back of the wall is waterproofed and the pipe and gravel go in. Santa Clarita's standard calls for waiting at least 7 days after the last grout pour, then we backfill with soil that drains, compact it in thin layers and cut a swale so surface water runs to a drain.
Related services. People who ask about retaining walls often need these too.
5.0 on Google
Read what a homeowner says about meeting Gilbert and talking through decorative concrete options.

Retaining Walls in Santa Clarita and the San Fernando Valley
Family OwnedSince 1999
California contractor license 770901. C-8 Concrete and B General Building. Free estimates.
Retaining Walls Near You
We bring retaining walls to the cities below. Pick yours for local details.
Retaining Walls In Three Easy Steps
Send A Message
Call, text or send the form with a few details, and photos if you have them. We reply the day we get it.
Step 1Free Estimate
We walk the site with you, measure, talk through finishes and drainage, and give you a price. No charge.
Step 2We Build It
Most jobs start about two weeks after you approve the estimate. We demo, form, pour, finish and haul off the mess.
Step 3
Retaining Walls Questions, Answered
In the City of Los Angeles, no building permit is needed for a retaining wall up to 4 feet tall, measured from the bottom of the footing to the top of the wall, when the ground behind it is level and the slope below is no steeper than 20 percent. A wall holding sloped backfill needs a permit even when it is short, per LADBS Information Bulletin P/BC 2026-002.
Santa Clarita exempts retaining walls up to 4 feet, measured from the bottom of the footing to the top of the wall, or 30 inches if the wall supports a slope or a surcharge. Dry stacked interlocking walls get 36 inches above the lowest grade, or 18 inches under a slope or surcharge. No exemption applies on a slope steeper than 3 to 1 or in a floodplain.
Santa Clarita's standard block wall plan covers retained heights up to 5 feet 4 inches when its slope and setback limits are met. Taller walls, walls holding up a driveway or a building, and most hillside walls need plans stamped by an engineer.
Water, most of the time. Wet soil pushes much harder than dry soil, and a wall with no gravel, no pipe and no weep holes has to hold all of it.
It depends on why it moved. A sound wall with plugged drains can sometimes be saved by digging behind it and rebuilding the drainage. A wall that has rotated on its footing or broken through has to come out, and we handle the demolition and hauling too.
A retaining wall holds soil that is higher on one side than the other. A garden wall or property line wall stands free with level ground on both sides. Many walls are both: retaining at the bottom with a freestanding block wall above.

Ready To Talk About Retaining Walls?
Family owned since 1999. California license 770901. Free estimates.