(818) 464-5763
Free EstimateClick To Call

Concrete Contractor InPorter Ranch

Master-planned hillside tracts under the Santa Susana Mountains, where HOA review, slopes and Santa Ana wind shape the work.

Concrete Contractor in Porter Ranch, CA

Porter Ranch concrete for hillside lots and HOA communities

We do concrete work in Porter Ranch, about 13 miles west of our Sylmar yard. The route is the 210 to the 118, then off at Reseda Boulevard or Porter Ranch Drive, and it takes about 20 minutes outside rush hour.

Porter Ranch is the newest of the Valley neighborhoods we work in. The first tracts went up around 1960 as part of Northridge, the city annexed the area in 1965, and building has kept moving up the slopes of the Santa Susana Mountains since, much of it in gated communities with homeowner associations. Graded pads, design review and wind decide what gets built: retaining walls, pool decks, stamped concrete patios and the drainage that moves water away from a cut slope.

Get a Free Estimate

A neighborhood still being built, one tract at a time

Census figures for ZIP code 91326 show how long the building has run. The median home dates from 1982, but the spread is wide: about 17 percent of homes are from the 1960s, 23 percent from the 1970s, 17 percent from the 2000s and 15 percent from 2010 on. Developer Nathan Shapell drove much of it, the city adopted the Porter Ranch specific plan in 1989, and Toll Brothers has been building the newest collections at Westcliffe.

An older tract house and a 2021 house near the top of the hill need different things. The older one may have flatwork as old as the house. The new one often comes with a builder's yard: a graded pad, a slope and a property line wall, waiting for a patio, walks, a pool surround and steps. We do both, and we would rather see a new yard before the pool is dug, so drains and footings go in ahead of the slabs that cover them.

HOA design review comes before the permit

The Council District 12 office describes Porter Ranch as mostly gated communities of single-family homes. Renaissance, Sorrento, Westcliffe, The Canyons and Hillcrest each sit behind their own gate with their own rules. If your association's governing documents require approval for a physical change to your lot, California Civil Code section 4765 says the association must give you a fair, reasonable and expeditious procedure and answer in writing.

So the association sees the design before the city does. Committees typically ask for a site plan, finishes and colors, and wall heights and materials. We can supply the parts that describe our work: dimensions, the stamp pattern and color by name, wall details and a drainage layout. Then we schedule the job for after the approval letter, because tearing out an unapproved patio costs far more than waiting for a committee meeting.

Cut slopes, wall limits and where the water goes

Much of Porter Ranch was graded out of hillside, and Los Angeles treats walls on such lots more strictly than on the Valley floor. Since March 2005 a city ordinance has limited both the height and the number of retaining walls on a lot in a Hillside Area, and going past those limits takes a conditional use permit from City Planning. Side and rear yard fence walls top out at 6 feet in the Hillside Area.

The state's seismic hazard map adds landslide zones along the north edge under the mountains and down the west side toward Browns Canyon. There, a tall wall or a new structure usually brings a geotechnical engineer into the job, and we build from the stamped plans. Every wall also needs a way to pass water: gravel behind it, weep openings through it, and a pipe or lined swale that carries the water to the street instead of over the slope.

Santa Ana wind and the pour schedule

Santa Ana winds blow hard at this end of the Valley. During the wind event of December 4 and 5, 2017, the National Weather Service logged a 47 mile per hour gust at Porter Ranch and 66 at its Granada Hills station next door. On October 10, 2019, the Saddleridge Fire forced the whole community to evacuate.

Wind is part of planning a pour up here. When a strong wind is in the forecast we may shift the start time or move the pour to another day, and every job's schedule is set with the weather on that lot in mind. The same wind leans on a tall block wall. The city's standard detail for a 6 foot wall puts vertical rebar every 48 inches in grouted cells over a continuous footing.

Porter Ranch neighborhoods we work in

Renaissance, Sorrento, Westcliffe, The Canyons, Hillcrest, Porter Ridge, and the streets in between.

Porter Ranch ZIP codes we serve: 91326.

Planning concrete work in Porter Ranch? Call or text (818) 464-5763. Estimates are free, and most jobs start about two weeks after you approve the price.

Porter Ranch Concrete Questions

Concrete contractor serving Porter Ranch

Family OwnedSince 1999

California contractor license 770901. C-8 Concrete and B General Building. Free estimates.
Ikon Concrete Design crew troweling a freshly poured driveway

Concrete Work In Porter Ranch In Three Easy Steps

  1. Send A Message

    Call, text or send the form with a few details, and photos if you have them. We reply the day we get it.

    Step 1
  2. Free Estimate

    We walk the site with you, measure, talk through finishes and drainage, and give you a price. No charge.

    Step 2
  3. We Build It

    Most jobs start about two weeks after you approve the estimate. We demo, form, pour, finish and haul off the mess.

    Step 3

Get a Free Estimate

Ready For Concrete Work In Porter Ranch?

Family owned since 1999. California license 770901. Free estimates.