
San Fernando Valley & Santa ClaritaConcreteDemolition
Old driveways, patios, slabs, walls and footings broken out, hauled off and recycled, with the site left ready for the next pour.
Concrete Demolition & Hauling at a glance
- Service
- Concrete Demolition & Hauling
- Service area
- Santa Clarita Valley, San Fernando Valley, north Los Angeles County, Ventura County, Antelope Valley
- Estimate
- Free, on site
- Typical start
- About two weeks after you approve the estimate
- Hours
- Monday to Saturday, 6 AM to 7 PM
- Phone
- (818) 464-5763
- License
- California 770901, C-8 Concrete and B General Building
- Company
- Ikon Concrete Design, family owned since 1999
Last updated November 2026
Concrete Removal and Hauling in Santa Clarita and the San Fernando Valley
Old concrete out, site ready for what comes next
Ikon Concrete Design breaks out and hauls away old concrete in the San Fernando Valley, Santa Clarita and neighboring parts of Los Angeles County and Ventura County: driveways, patios, walkways, pool decks, building slabs, block walls, retaining walls and the footings under them.
For us, demolition is usually day one of a new pour. The crew that takes out your old, broken driveway is the crew that pours the new concrete driveway, so the tear-out is done with the replacement in mind: straight saw cuts where new concrete will meet old, and soft spots in the subgrade dug out.
We also take removal jobs for homeowners, landscape designers and general contractors who need concrete gone before another trade starts.
Get a Free Estimate
What Goes Into Our Demolition & Hauling Work
Click any box to read more
Flatwork removal
Driveways, patios, walkways and pool decks are broken into pieces a machine or two people can lift, then loaded and hauled. Slabs with rebar or wire mesh take longer, because the steel has to be cut as the concrete breaks. What we find underneath decides how much prep the new pour needs.
Block walls, retaining walls and footings
Walls come down from the top in sections, and then the footing is dug out, which is the heavy part. Before a retaining wall comes out, the soil behind it has to be cut back or braced. If a wall is shared with a neighbor, both owners need to agree before we touch it.
Straight cuts and partial removal
When only part of a slab is going, we saw cut a line first so the break stops where it should and the remaining edge is square for new concrete to meet. Cal/OSHA's silica standard calls for saws that feed water to the blade, which keeps the dust down for our crew and for your neighbors.
Hauling, disposal and cleanup
Broken concrete has to go to a facility that accepts it, and clean concrete is recyclable. In the City of Los Angeles, all mixed construction and demolition debris has to go to a city certified processor. In unincorporated Los Angeles County, the ordinance updated in August 2024 raised the recycling rate for mixed debris to 70 percent.
In A Rush? Let's Talk Now!


Why have the pour crew do the tear-out
A demolition company is paid to make concrete disappear. We are thinking about what gets built next, and that changes small decisions all day: where to stop a saw cut, how much base to leave, whether a drain line should go in while the ground is open.
Ikon is a family owned concrete contractor, in business since 1999, working under CSLB 770901 in the C-8 Concrete and B General Building classes, with eight on the crew. Gilbert Rico prices the removal and the new work together or separately, whichever you ask for. Estimates are free, and we can usually start within about two weeks of approval.
Get a Free EstimateSigns old concrete should come out, not be patched
- Breaks wide enough to catch a shoe, with one side sitting higher than the other
- Sections that have sunk or tilted, or that rock when a car rolls over them
- A slab that slopes toward the house or garage and sends water the wrong way
- Tree roots lifting panels, which can keep lifting whatever is poured on top if they stay
- Old patches that have broken again along the same lines
What sets the price of demolition and hauling
Square footage and thickness set the starting point, since they decide how many tons there are to break and haul. Reinforcing steel and footings add time.
Access decides the method. If a small loader with a breaker can reach the slab, the work goes much faster than breaking by hand and wheeling pieces out through a gate. Disposal and what turns up under the slab change the number too, and every job is different.
When removal is part of a new driveway, patio or foundation, we price it as one job. Our figure comes from a free estimate on site. Message us through the contact page or call or text (818) 464-5763.
How a concrete removal job goes
- Walk and mark. We mark what goes and what stays and have buried lines located through 811. California requires that notice at least two working days before digging.
- Protect. Plywood or mats go down where equipment crosses concrete that is staying, and nearby glass, stucco and plants are shielded from chips.
- Saw cut. Straight cuts are made along the removal limits with a wet saw.
- Break and load. The slab is broken with a breaker on a small machine, or with jackhammers where access is tight, and the pieces are loaded for hauling.
- Check the base. Footings, roots and soft soil come out, and we tell you what the subgrade looks like before anything is covered.
- Haul and clean up. Debris goes to a recycling or disposal facility and the area is swept. If we are pouring next, the base is graded and compacted for forms.
Related services. People who ask about concrete demolition & hauling often need these too.
5.0 on Google
Read what a homeowner says about meeting Gilbert and talking through decorative concrete options.

Demolition & Hauling in Santa Clarita and the San Fernando Valley
Family OwnedSince 1999
California contractor license 770901. C-8 Concrete and B General Building. Free estimates.
Demolition & Hauling Near You
We bring concrete demolition & hauling to the cities below. Pick yours for local details.
Demolition & Hauling In Three Easy Steps
Send A Message
Call, text or send the form with a few details, and photos if you have them. We reply the day we get it.
Step 1Free Estimate
We walk the site with you, measure, talk through finishes and drainage, and give you a price. No charge.
Step 2We Build It
Most jobs start about two weeks after you approve the estimate. We demo, form, pour, finish and haul off the mess.
Step 3
Demolition & Hauling Questions, Answered
We haul it. Loading, trucking, disposal and cleanup are part of the job when we do the demolition, so you do not need to rent a bin.
Clean concrete is recyclable, and we take it to a recycler where one is available. The City of Los Angeles requires mixed construction and demolition debris to go to a certified processor, and the state green building code sets a 65 percent diversion rate for construction and demolition material on permitted projects.
Yes. We saw cut along a joint or a straight line, take out the bad section and leave a square edge. New concrete will not match the old in color, so we place the cut where a change looks deliberate, such as at a control joint.
If the slab is solid and the problem is on the surface, such as wear, stains or light flaking, concrete resurfacing can save it. If it is broken, sunken, lifted by roots or draining the wrong way, an overlay will not fix the slab under it, and removal is the better use of the money.
Yes, for the part in the public right of way: the driveway apron, the sidewalk and the curb. In the City of Los Angeles that work is done under a Bureau of Engineering A-Permit, and Los Angeles County requires a road permit to cut or rebuild curb, gutter, driveways and sidewalks.
It is loud while the breaker is running, and we tell you ahead of time which hours that will be so you can warn the neighbors. Dust is kept down with water at the saw blade and at the breaker point, the controls Cal/OSHA's silica standard lists for those tools.

Ready To Talk About Demolition & Hauling?
Family owned since 1999. California license 770901. Free estimates.

