Grading & Hillside for Los Angeles homes and businesses, from a family owned crew based in Sylmar.
Grading & Hillside Construction in Los Angeles, CA at a glance
- Service
- Grading & Hillside Construction in Los Angeles, CA
- County
- Los Angeles County
- Building department
- LADBS on private property; Bureau of Engineering (A-Permit) in the public right-of-way
- ZIP codes
- 90026, 90027, 90028, 90038, 90039, 90041, 90042, 90046, 90049, 90065, 90068, 90077, 91604
- Estimate
- Free, on site
- Typical start
- About two weeks after you approve the estimate
- Phone
- (818) 464-5763
- License
- California 770901, C-8 Concrete and B General Building
Last updated November 2026
Grading & Hillside in Los Angeles, CA
Hillside Grading in Los Angeles: The Limits Before the Dirt Moves
We do grading and hillside construction in Los Angeles north of downtown: cut and fill for pads, driveways and walls in the Hollywood Hills, Studio City, Bel Air, Brentwood, Eagle Rock and the Valley foothills. On a Los Angeles hillside, how much dirt you may move is settled on paper first. The zoning code caps the cubic yards. The building code sets when a permit, a soils report, a bond and a haul route hearing are needed. The calendar restricts work in the rainy season.
The grading plan and the soils report come from your civil engineer and your geotechnical firm. We are the contractor who builds to them, with the crew that pours the footings and walls afterward. Our approach to the work itself is on the grading and hillside page. To talk through a lot, use the contact page or call (818) 464-5763 for a free estimate.
The Baseline Hillside Ordinance caps the cubic yards
The Baseline Hillside Ordinance is section 12.21 C.10 of the Municipal Code, and it covers lots zoned R1, RS, RE or RA inside the city's mapped Hillside Area. Its grading rule counts cut and fill together. The limit is 1,000 cubic yards plus 10 percent of the lot's square footage, so the code's own example gives a 5,000 square foot lot 1,500 cubic yards. A second cap by zone then applies: 1,000 cubic yards in R1, 2,200 in RS, 3,600 in RA and from 2,400 to 6,600 across the RE zones. No grading permit is issued until a building permit is approved.
Some earthwork is left out of the count: excavation for caissons and piles, up to 500 cubic yards for the driveway to the required parking, and remedial grading that an approved geotechnical report recommends. A Zoning Administrator can allow more than the zone cap, up to the formula amount. New graded slopes can be no steeper than 2 to 1 unless the Grading Division approves otherwise.
Permits, bonds and soils reports: the LADBS thresholds
Apart from zoning, the Department of Building and Safety decides when earthwork needs a grading permit. A fill is exempt only if it is under 1 foot deep, on ground flatter than 10 percent, no more than 50 cubic yards, and leaves the drainage pattern alone. Outside hillside areas, excavation for footings, basements and pools rides on the building permit. Inside them, only caisson and pile holes under a permitted building are exempt, though LADBS may waive the grading permit where the site is fairly level or the dig is for footings and grade beams no deeper than 5 feet. Past the permit line, three more thresholds apply:
- 250 cubic yards or more in a hillside area: the owner files a surety bond, unless LADBS waives it
- More than 5,000 cubic yards: soils and geology reports are mandatory, and a grading pre-inspection can require them on much smaller jobs
- A slope of 100 percent or steeper: a deputy grading inspector, paid by the owner, on site
Haul routes, hauling hours and the rainy season
Getting soil off a hillside lot is regulated as closely as cutting it. A project that imports or exports more than 1,000 cubic yards in a hillside area cannot get its permit until a haul route is approved. The applicant submits the route, staging areas and loaded truck weights. Public Works and the Department of Transportation review them, and the Board of Building and Safety Commissioners holds a public hearing. The code also charges a fee for the review, scaled to the cubic yards. On lots under the hillside ordinance, earth may be hauled only between 9 a.m. and 3 p.m., Monday to Friday.
The city defines its rainy season as October 1 to April 15. In that window no permitted grading over 200 cubic yards may start until LADBS has approved an erosion control system, and owners with unfinished hillside grading owe their inspector an erosion control plan before October 1. Grading is barred from 6 p.m. to 7 a.m. and all day Sunday.
How a hillside grading job runs with us, and what moves the cost
We build from the approved plan. At the free estimate Gilbert Rico walks the lot with the grading plan and the soils report and tells you whether the work is likely to need a permit. After that the city's inspections set the order. LADBS lists what its grading inspectors look at: the subgrade before any compacted fill is placed, the backfill and subdrains behind retaining walls, and the planting of finished slopes. Most jobs start about two weeks after you approve our estimate, or once the permit and any haul route approval are in hand.
Cost on these lots follows the dirt and the street:
- Cubic yards exported, in trucks sized for the street and inside the hauling hours
- Whether cut soil can be reused as compacted fill on the same lot
- Small machines and hand work where access is a side yard or stairway
- Erosion control when the work runs into the rainy season
- Owner costs outside our bid: engineering, soils testing, the bond and city fees
Grading & Hillside in Los Angeles. Call or text (818) 464-5763 for a free estimate. Read more about ourgrading & hillside construction work or about concrete work in Los Angeles.
In A Rush? Let's Talk Now!

Grading & Hillside In Los Angeles: Common Questions
On an R1, RS, RE or RA lot in the Hillside Area, cut and fill combined are limited to 1,000 cubic yards plus 10 percent of the lot area in square feet, and never more than the cap for the zone. That cap is 1,000 cubic yards in R1 and rises to 6,600 in RE40. Your civil engineer calculates the quantities and what is exempt.
When more than 1,000 cubic yards of earth will be imported or exported in a hillside area. The haul route goes to a public hearing before the Board of Building and Safety Commissioners, after review by Public Works and the Department of Transportation. Smaller jobs still have to follow the hauling hours and any route conditions LADBS writes into the permit.
Yes, with conditions. From October 1 to April 15, permitted grading over 200 cubic yards cannot begin until LADBS approves an erosion control system for the site. On a job that will still be open in October, we plan the erosion control with your engineer before the first storm.
Always above 5,000 cubic yards, and often well below that on a hillside. LADBS says geotechnical reports are required for many projects, especially hillside ones with basements, deep foundations or retaining walls, or sites in seismic hazard zones. The report comes from a geotechnical firm hired by the owner, and we build to its recommendations.
A licensed contractor working from a civil engineer's grading plan, with a soils firm testing the compaction. Ikon holds California license 770901 in the B General Building and C-8 Concrete classifications, and we grade as part of the foundations, walls, driveways and drainage we build. See our Los Angeles page for the areas we cover.
5.0 on Google
Read what a homeowner says about meeting Gilbert and talking through decorative concrete options.

Grading & Hillside in Los Angeles
Family OwnedSince 1999
California contractor license 770901. C-8 Concrete and B General Building. Free estimates.
More Concrete Services In Los Angeles
Grading & Hillside In Nearby Cities
Grading & Hillside In Los Angeles In Three Easy Steps
Send A Message
Call, text or send the form with a few details, and photos if you have them. We reply the day we get it.
Step 1Free Estimate
We walk the site with you, measure, talk through finishes and drainage, and give you a price. No charge.
Step 2We Build It
Most jobs start about two weeks after you approve the estimate. We demo, form, pour, finish and haul off the mess.