Los Angeles, CAConcreteFoundations
Foundations for Los Angeles homes and businesses, from a family owned crew based in Sylmar.
Foundations & Structural Concrete in Los Angeles, CA at a glance
- Service
- Foundations & Structural Concrete in Los Angeles, CA
- County
- Los Angeles County
- Building department
- LADBS on private property; Bureau of Engineering (A-Permit) in the public right-of-way
- ZIP codes
- 90026, 90027, 90028, 90038, 90039, 90041, 90042, 90046, 90049, 90065, 90068, 90077, 91604
- Estimate
- Free, on site
- Typical start
- About two weeks after you approve the estimate
- Phone
- (818) 464-5763
- License
- California 770901, C-8 Concrete and B General Building
Last updated November 2026
Foundations in Los Angeles, CA
New Concrete Foundations in Los Angeles, Poured From Stamped Plans
Ikon Concrete Design pours new foundations and structural concrete in Los Angeles north of downtown: slabs and footings for ADUs and additions in the Valley, Highland Park and Eagle Rock, and grade beams and pier foundations on hillside lots from Studio City to Bel Air. We build what your engineer drew and the Department of Building and Safety (LADBS) approved. We are a new construction crew. Foundation repair, earthquake retrofit and house bolting are a different specialty, and we do not offer them.
Send the plans, or the address if the plans are not finished, through the contact page or text them to (818) 464-5763. The estimate is free. Slab and footing basics are on our foundations page. This page covers what Los Angeles adds to the job: plan rules for ADUs, setbacks from slopes and deputy inspectors.
ADU and addition foundations in the flat parts of the city
The usual flatland job is a slab or a raised foundation for an ADU or an addition behind an existing house. Los Angeles has tried to lighten the paperwork. LADBS runs an ADU Standard Plan Program, and one of its plans, YOU-ADU, is a free, city-provided design for a one story, one bedroom unit of 455 square feet. A pre-approved plan does not settle the foundation, though. The department's page for that plan says the applicant still submits site-specific information for review, including compliance with the zoning code and foundation requirements.
So the footing design is the one part that still depends on your lot. On older Los Angeles lots the practical limits are the side yard and the alley. A ready mix truck rarely reaches a backyard, so we plan on a pump, wheel the trench spoils out by hand, and ask early where the sewer and gas lines cross the pad.
Hillside foundations: the slope sets the footing
On a hillside lot the engineer designs the foundation around the slope, and LADBS reviews it against bulletin P/BC 2026-001. Once a slope is steeper than 3 horizontal to 1 vertical, footings and buildings have to be set back from it under building code section 1808.7. Below an ascending slope the building needs a level area, as a rule half the slope's height, and the toe of the slope cannot rest against the building wall. Where the department asks for a soils or geology report, the report has to show a safety factor of at least 1.5 against a slope failure, and 1.0 in an earthquake.
As a rule the code also bars building on ground steeper than 2 to 1 unless a soils engineer and an engineering geologist support it. That is why hillside plans call for deepened footings, grade beams and drilled caissons, the concrete piers that reach down to firm material. The engineer sizes all of it. We form, tie steel and pour to the sheet.
City inspections, and when a deputy inspector is on site
Two kinds of inspector can show up on a Los Angeles foundation. The city building inspector approves the soil and the zoning setbacks before any steel or concrete goes into the footings. A Registered Deputy Inspector is a licensed private inspector who watches structural work as it happens and reports to LADBS. Under the department's bulletin on deputies, the owner hires that inspector, not the contractor.
Drilled caissons and the grade beams that connect them get special inspection during the work, and so does a footing the engineer designed at a higher concrete strength. The deputy compares each delivery ticket to the approved mix design and checks the size, spacing and clearance of the rebar, and slump tests and test cylinders are taken as the concrete leaves the truck. Section 91.1705.3 of the municipal code exempts the small work:
- Isolated footings for buildings of three stories or less, designed at 2,500 psi or lower
- Continuous footings under light-frame walls of buildings that size
- Nonstructural slabs poured on the ground
What moves the price of a foundation in Los Angeles
Our price comes from the stamped plans and a free visit to the site. The plans decide the big items and the lot decides the rest. A flat Valley lot with alley access and a hillside lot off a one lane street can carry the same floor plan and very different concrete bids.
Once you approve the estimate, most jobs start in about two weeks, and after that the pour dates follow the inspection sign offs. If the site has to be cut, an old slab removed or a wall built first, our crew handles the grading, the demolition and the retaining walls as well. The main drivers:
- Footing depth, grade beams and caissons called out by the engineer
- How much steel has to be cut, bent and tied
- Pump distance from the street to the forms
- Soil exported from the trenches, which on a hillside leaves in small trucks
- Deputy inspection and soils engineer visits, paid by the owner directly
Foundations in Los Angeles. Call or text (818) 464-5763 for a free estimate. Read more about ourfoundations & structural concrete work or about concrete work in Los Angeles.
In A Rush? Let's Talk Now!

Foundations In Los Angeles: Common Questions
When the concrete is structural and falls outside the code's exceptions. Footings for houses and ADUs of three stories or less are exempt if they were designed at 2,500 psi or lower, and so are nonstructural slabs on the ground. Caissons, their grade beams and higher strength designs get a deputy, and your engineer will tell you which inspections your plans carry.
Not for your particular lot. LADBS pre-approves the building design, and the applicant still submits site-specific information for review, including foundation requirements. Have your designer or engineer confirm the footing design for your soil before anyone forms a trench.
It depends on how tall and how steep the slope is. Where it is steeper than 3 to 1, the building code sets a setback, and an LADBS bulletin shows the standard ways of meeting it. Your engineer and the soils report set the distance for your lot.
The owner does. The structural engineer, the soils firm and any deputy inspector work for you, and the city inspector comes with the permit. We build from their approved drawings and schedule each pour around their inspections.
The plans set it, not the floor area, so there is no honest price per square foot. An ADU slab on a flat lot and a hillside foundation on grade beams are different jobs even at the same size. Send the drawings and we will price the concrete at a free estimate anywhere in our Los Angeles service area.
5.0 on Google
Read what a homeowner says about meeting Gilbert and talking through decorative concrete options.

Foundations in Los Angeles
Family OwnedSince 1999
California contractor license 770901. C-8 Concrete and B General Building. Free estimates.
More Concrete Services In Los Angeles
Foundations In Nearby Cities
Foundations In Los Angeles In Three Easy Steps
Send A Message
Call, text or send the form with a few details, and photos if you have them. We reply the day we get it.
Step 1Free Estimate
We walk the site with you, measure, talk through finishes and drainage, and give you a price. No charge.
Step 2We Build It
Most jobs start about two weeks after you approve the estimate. We demo, form, pour, finish and haul off the mess.
Step 3

Ready For Foundations In Los Angeles?
Family owned since 1999. California license 770901. Free estimates.