Decks and coping surrounds for new and existing pools, finished for wet bare feet and sloped so water drains away from the pool.
Concrete Pool Decks at a glance
- Service
- Concrete Pool Decks
- Service area
- Santa Clarita Valley, San Fernando Valley, north Los Angeles County, Ventura County, Antelope Valley
- Estimate
- Free, on site
- Typical start
- About two weeks after you approve the estimate
- Hours
- Monday to Saturday, 6 AM to 7 PM
- Phone
- (818) 464-5763
- License
- California 770901, C-8 Concrete and B General Building
- Company
- Ikon Concrete Design, family owned since 1999
Last updated November 2026
Concrete Pool Deck Contractor in Santa Clarita and the San Fernando Valley
Wet feet, hot sun and water that has to drain
We build the concrete around swimming pools and spas in the Santa Clarita Valley, the San Fernando Valley and nearby Los Angeles and Ventura county communities. Your pool builder builds the pool. We pour the deck, the surround at the coping (the cap along the pool's edge) and the walks, steps and pads that connect the pool to the house.
A pool deck has three jobs a patio does not. It has to grip wet bare feet. It has to stay cool enough to stand on in August. And every gallon that splashes out or falls as rain has to run away from the pool and the house.
We work on new pools around the pool contractor's schedule, and on existing pools where the old deck has broken up or sunk. Where the old slab is still sound, a resurfacing overlay can change the surface without a tear-out.
Get a Free Estimate
What Goes Into Our Pool Decks Work
Click any box to read more
Grip for wet bare feet
Texture keeps a wet deck from being slick. Broom, exposed aggregate and textured stamps all give grip. Sealed decorative concrete is the exception, because water beads on the sealer, so a fine grit is mixed into the sealer coat on stamped or stained decks.
Keeping the deck cooler
Color does most of the work, because lighter surfaces reflect more sunlight. The EPA reports a test in which a reflective pavement stayed 10 to 16 degrees cooler than conventional paving that reached 152 degrees at midday. We steer pool decks toward light grays and sands and away from dark stains.
Slope and drains
Water should leave the deck, not sit on it or run back into the pool. Los Angeles County's rules for public pools call for a deck sloped between 1 and 2 percent, about an eighth to a quarter inch per foot, and that range suits a backyard pool too. Where the deck is boxed in, a channel drain picks the water up; see [drainage systems](/services/drainage-systems).
The joint between pool and deck
The pool shell and the deck are separate structures and move differently. A gap is left between the back of the coping and the deck and filled with flexible sealant so neither pushes on the other. County rules for public pools require that gap to be sealed.
In A Rush? Let's Talk Now!


Why hire Ikon for a pool deck
Ikon pours decorative flatwork, builds block and stone walls and installs drainage systems, so the deck, the drains and any steps or walls around the pool can be planned as one job by one contractor.
We are family owned, in business since 1999, with a crew of eight and an owner, Gilbert Rico, who stays involved. California license 770901 carries the C-8 Concrete and B General Building classifications. Estimates are free, and work usually starts about two weeks after approval, timed with your pool contractor if the pool is new.
Get a Free EstimateSigns an existing pool deck needs work
- The sealant joint behind the coping has split, shrunk or gone missing
- Slabs have sunk or tilted toward the pool, or puddles sit on the deck after rain
- The surface is slick when wet or too hot to stand on in summer
- Breaks run from the pool edge out across the deck
- Coping stones or waterline tiles have broken where the deck presses on them
- The pool is being remodeled and the old deck no longer fits its shape
What sets the price of a pool deck
A pool deck is priced from its size and finish, and the backyard around it decides much of the rest. Every yard is different.
What moves the number: whether an old deck comes out, how the crew and the concrete reach the backyard, curves and steps, drains, the finish, and any walls or raised areas.
For a price on your pool, we need to see it. The estimate is free. Call or text (818) 464-5763 or send us the details.
How a pool deck job goes
- Site visit. We measure, check which way the yard falls, look at the coping joint and go over finish and color.
- Coordination. The electrical code requires the surfaces around a pool, including deck steel within 3 feet of the water, to be bonded to the pool's bonding grid. The pool contractor or an electrician makes that connection, and it is inspected before concrete covers it.
- Demolition and grade. On an existing pool the old deck is cut and removed in sections, with the water protected, and the ground is regraded and compacted.
- Forms, steel, drains and joint. Forms set the slope. Drains and their piping go in, steel is set on supports, and joint material goes against the back of the coping.
- Pour and finish. We place the concrete, work in the texture and cut control joints so panels stay close to square.
- Cure, seal and caulk. The deck cures, decorative finishes are sealed with a grit additive once the concrete is ready, on the sealer maker's timing for that product and the weather, and the coping joint gets its flexible sealant last.
Related services. People who ask about concrete pool decks often need these too.
5.0 on Google
Read what a homeowner says about meeting Gilbert and talking through decorative concrete options.

Pool Decks in Santa Clarita and the San Fernando Valley
Family OwnedSince 1999
California contractor license 770901. C-8 Concrete and B General Building. Free estimates.
Pool Decks Near You
We bring concrete pool decks to the cities below. Pick yours for local details.
Pool Decks In Three Easy Steps
Send A Message
Call, text or send the form with a few details, and photos if you have them. We reply the day we get it.
Step 1Free Estimate
We walk the site with you, measure, talk through finishes and drainage, and give you a price. No charge.
Step 2We Build It
Most jobs start about two weeks after you approve the estimate. We demo, form, pour, finish and haul off the mess.
Step 3
Pool Decks Questions, Answered
A textured one. Broom, exposed aggregate and textured stamped finishes all grip wet feet. Smooth troweled concrete and glossy sealers without a grit additive are the ones to avoid around water.
Choose a light color. Light surfaces reflect more of the sun's energy than dark ones, so a pale gray or sand deck is usually cooler under bare feet than a dark stained one.
No. We build the concrete around the pool: the deck, steps, walks, pads and nearby retaining walls and seat walls. The shell, plumbing, equipment and plaster belong to a pool contractor, and we schedule around them.
It lets the pool and the deck move separately. The flexible sealant keeps the deck from pushing on the coping and tile and keeps water from getting down behind the pool wall.
It can be resurfaced if the slab is solid and has not sunk. A deck that is still moving needs replacing, since a thin topping does nothing to stop the slab under it from shifting.
Yes. Those are public pools, and in Los Angeles County their plans are reviewed by the Department of Public Health. Its requirements call for a continuous slip resistant concrete deck at least 4 feet wide around the pool, with drains at least 4 feet from the water. See commercial concrete.
Related Reading

Ready To Talk About Pool Decks?
Family owned since 1999. California license 770901. Free estimates.