Foundations & Structural Concrete at a glance

Service
Foundations & Structural Concrete
Service area
Santa Clarita Valley, San Fernando Valley, north Los Angeles County, Ventura County, Antelope Valley
Estimate
Free, on site
Typical start
About two weeks after you approve the estimate
Hours
Monday to Saturday, 6 AM to 7 PM
Phone
(818) 464-5763
License
California 770901, C-8 Concrete and B General Building
Company
Ikon Concrete Design, family owned since 1999

Last updated November 2026

Foundation Contractor in Santa Clarita and the San Fernando Valley

Foundations poured to the plans, inspected first

Ikon Concrete Design builds concrete foundations and structural concrete from Santa Clarita and Sylmar across the San Fernando Valley, and in the nearby parts of Los Angeles and Ventura counties. That covers slab on grade foundations, continuous footings, stem walls, grade beams, pads and piers, and structural slabs for houses, ADUs, room additions, garages and commercial buildings.

We build from drawings. Your engineer or architect designs the foundation and stamps the plans, the building department approves them, and we form, tie steel and pour to what is on the sheet. We do not do the engineering ourselves.

If the ground has to be cut, filled or drained before the foundation can go in, we handle the grading and the drainage too, so one crew answers for everything below the framing.

Get a Free Estimate
Concrete pumped through a hose into a slab foundation over rebar and a yellow vapor barrier, with anchor bolts hung on the form boards

What Goes Into Our Foundations Work

Click any box to read more

Slab foundations with every layer in order

A slab on grade is the floor and the foundation in one pour, with the edges thickened into footings. Under the concrete go a base course, a vapor barrier (heavy plastic sheeting that keeps ground moisture out of your flooring) and rebar propped on small concrete blocks called dobies. The City of Los Angeles prescriptive standard for expansive soil calls for a slab at least 3 1/2 inches thick with #4 rebar at 16 inches each way.

Continuous footings, stem walls and raised floors

For raised floors and sloping lots we pour continuous footings in trenches and form stem walls on top, the short concrete walls the framing sits on. Anchor bolts and hold-downs are hung in the forms before the pour, because a bolt that is two inches off cannot be moved once the concrete is hard. On a slope the footings step down in level sections.

Grade beams, pads and structural slabs

Engineers call for grade beams, which are reinforced concrete beams cast in the ground, to tie footings or piers together on hillside lots and under heavy point loads. We also pour pads for posts and columns, thickened slabs for equipment and structural slabs for commercial buildings.

ADU, garage and addition foundations

An ADU or addition foundation is a small pour with all the requirements of a house: approved plans, a footing inspection, and underslab plumbing and electrical in place before the vapor barrier goes down. Where a new slab meets an old one, plans normally call for steel dowels drilled and epoxied into the existing concrete. Backyard access is often the hard part, so we usually plan on pumping from the street.

Foundation ready for concrete, with a rebar grid over a clear vapor barrier, steel in the footing trenches and wrapped plumbing pipes standing up through the slab area

Why builders and homeowners hand us the foundation

A foundation is the one part of a building nobody gets to redo. Ikon has been family owned since 1999, and CSLB license 770901 carries both the C-8 Concrete and the B General Building classifications. Foundations and ADU slabs are poured from the engineer's stamped plans, and the work is checked by the city inspector before anything is built on top.

The crew is eight people, and Gilbert Rico, the owner, is the one who goes over your plans with you. Estimates are free. Once you approve the number, most jobs start in about two weeks, and on plan-checked work the pour date follows your inspection schedule.

Get a Free Estimate

What to have ready before a foundation estimate

  • The stamped structural plans, or the latest set if they are still in plan check
  • The soils report, if your engineer or the city asked for one
  • Permit status: issued, submitted or not started
  • Who is doing the underslab plumbing and electrical, since their pipes go in before our steel
  • Access for a concrete pump and a ready mix truck, including gate width and overhead wires
  • Your target date for framing

What a concrete foundation costs

The plans set the price. Footing depth and width, the amount of rebar, the concrete strength called out and the count of anchor bolts and hold-downs move the number more than square footage does.

Site conditions come next: how much soil has to be exported, how far the pump has to reach, and whether old concrete has to come out first. If it does, that is our own demolition and hauling crew, not a second contractor.

We do not publish foundation prices because no two sets of plans are alike. Send the drawings through the contact page or text them to (818) 464-5763, and we will set up a free estimate at the site.

How a foundation job goes, layout to stripped forms

  1. Layout. We set the building corners and elevations from the plans and string the footing lines. California law requires notice to 811 at least two working days before trenching.
  2. Excavation. Trenches are dug to the depth on the plans. Where there is no soils report, the City of Santa Clarita code sets exterior footings at 24 inches deep and interior bearing footings at 18 inches, with two #4 bars top and bottom.
  3. Forms and vapor barrier. Edge forms are staked and braced, the base is compacted, and the vapor barrier is laid with lapped seams and sealed around every pipe.
  4. Steel. Rebar is tied to the bar schedule and held off the soil at the clearance the plans call for wherever concrete is cast against earth.
  5. Inspection. The city or county inspector checks trenches, steel and hardware before any concrete is ordered.
  6. Pour and cure. Concrete at the strength the plans specify is pumped in, vibrated around the steel and finished. We strip the forms once it has set.

Related services. People who ask about foundations & structural concrete often need these too.

5.0 on Google

Read what a homeowner says about meeting Gilbert and talking through decorative concrete options.

Foundations in Santa Clarita and the San Fernando Valley

Family OwnedSince 1999

California contractor license 770901. C-8 Concrete and B General Building. Free estimates.
Foundation ready for concrete, with a rebar grid over a clear vapor barrier, steel in the footing trenches and wrapped plumbing pipes standing up through the slab area

Foundations In Three Easy Steps

  1. Send A Message

    Call, text or send the form with a few details, and photos if you have them. We reply the day we get it.

    Step 1
  2. Free Estimate

    We walk the site with you, measure, talk through finishes and drainage, and give you a price. No charge.

    Step 2
  3. We Build It

    Most jobs start about two weeks after you approve the estimate. We demo, form, pour, finish and haul off the mess.

    Step 3

Get a Free Estimate

Foundations Questions, Answered

See More FAQs

Foundations Across Santa Clarita And The Valley

Get a Free EstimateSee every area we serve
Ikon Concrete Design crew finishing a long run of new sidewalk

Ready To Talk About Foundations?

Family owned since 1999. California license 770901. Free estimates.