# Ikon Concrete Design: full site content

> Ikon Concrete Design is a family owned concrete contractor based in Sylmar, California, in business since 1999. Owner Gilbert Rico and a crew of eight pour stamped, stained and colored concrete, driveways, patios, sidewalks and foundations, build block and retaining walls, and install drainage systems across Santa Clarita, the San Fernando Valley, Los Angeles County north of downtown, Ventura County and the Antelope Valley. California contractor license 770901. Phone (818) 464-5763. Website [ikonconcrete.com](https://ikonconcrete.com). Summary version: [ikonconcrete.com/llms.txt](https://ikonconcrete.com/llms.txt)

Last updated 2026-11-22.

## General questions

**What areas does Ikon Concrete Design serve?**
We are based in Sylmar and work across the Santa Clarita Valley, the San Fernando Valley, Los Angeles County north of downtown, Ventura County and the Antelope Valley. We do not take jobs south of downtown Los Angeles. The full list of cities is on our service areas page.

**Is Ikon Concrete Design a licensed contractor?**
Yes. We hold California contractor license 770901 with the C-8 Concrete and B General Building classifications. The license was first issued in November 1999. You can look up any contractor on the Contractors State License Board website at cslb.ca.gov.

**Are your estimates free?**
Yes. We come to the site, measure, talk through finishes and drainage with you, and give you a price. There is no charge for the estimate. To set one up, call or text (818) 464-5763 or send the form on the contact page.

**How soon can you start my project?**
Most jobs start about two weeks after you approve the estimate. Jobs that need engineered plans or a permit start once those are in hand, and that timing depends on your city or county.

**What kinds of concrete work do you do?**
All of it. Decorative work such as stamped, stained and colored concrete, plus driveways, patios, sidewalks and foundations. We also build block walls and retaining walls, install drainage systems, grade hillside lots, and demolish and haul away old concrete.

**Do you work with general contractors, architects and designers?**
Yes. Along with homeowners, our regular clients are general contractors, architects, engineers and landscape designers. Send us the plans and we will price the concrete, masonry and drainage portion. Estimates for trade clients are free too.

**How long has Ikon Concrete Design been in business?**
Since 1999. Gilbert Rico started the company that year and still runs it. It is family owned, and the crew is eight people.

**What are your hours?**
Monday to Saturday, 6 AM to 7 PM. We are closed on Sunday. If you send a message outside those hours we usually reply the next working day.

**How long before I can walk or drive on new concrete?**
Published guides such as Concrete Network put foot traffic on a new slab at about a day and a passenger car at about a week, with heavy trucks and trailers kept off for about 28 days, the age at which concrete strength is normally measured. Those are general figures, not a schedule for your slab. Heat, the mix and the thickness all change the timing, so we go over the waits for your pour when we finish.

**Do I need a permit for concrete work?**
Plain flatwork on private property, like a patio or a walkway, often does not. Work that commonly does includes retaining walls over the height your city exempts, the driveway approach where it crosses the public sidewalk and curb, new foundations, and grading above your city's or county's limits. Rules differ between the City of Los Angeles, Santa Clarita, other cities and unincorporated county areas, so we tell you at the estimate what your job is likely to need.

**What is the difference between stamped, stained and colored concrete?**
Stamped concrete gets its pattern and texture from mats pressed into the fresh slab. Stained concrete gets its color from an acid or water based stain applied after the slab has cured. Colored concrete has pigment mixed into the load at the plant or broadcast onto the surface as it is finished. They are often combined, and our decorative concrete page shows how.

**Can you fix the drainage when you pour a new driveway or patio?**
Yes, and it is the right time to do it. Drainage is our specialty. We plan the slope of the slab to carry water away from the house, and where slope alone is not enough we can add channel drains, area drains and pipe before the concrete goes down. See drainage systems.

**Do you remove the old concrete?**
Yes. We break out the old slab, load it and haul it away, then prepare the base for the new pour. Demolition, clean up and hauling are part of what we do, so you do not need a separate company for it. More on concrete demolition and hauling.

**How do I get an estimate?**
Call or text (818) 464-5763, or send the form on the contact page. A few photos and rough measurements help. We usually reply the day we get your message and set a time to come out.

# Services

## Stamped Concrete

URL: [ikonconcrete.com/services/stamped-concrete](https://ikonconcrete.com/services/stamped-concrete)

We pour, color and stamp new concrete for driveways, patios, walks, steps and pool decks in stone, slate, brick and wood plank patterns, jointed and sealed for sun and cars.

We pour, color and stamp concrete for driveways, patios, walkways, entry steps and pool decks across the Santa Clarita Valley and the San Fernando Valley. Stamped concrete is a regular slab with a pattern pressed into the surface while it is still soft, so you get the look of cut stone, slate, brick or wood plank without loose pieces and sand joints.

The pattern is what people see. The slab under it matters just as much, so we build it like any driveway we pour: compacted base, forms set to drain, and control joints worked into the layout. If you are still choosing a finish, our decorative concrete page compares them.

### Where stamped concrete works best

- Driveways, for a stone or cobble look with no pavers to shift
- Patios, where a slate texture gives grip without being rough on bare feet
- Front walks and entry steps, with a border and matching step faces
- Pool decks, with a lighter texture and a sealer chosen for wet feet
- Not over an old slab that is broken, sunken or moving. That needs demolition and a new pour first

### How a stamped concrete job goes

1. We meet at the property, measure, check slope and drainage, and go through patterns and colors.
2. We remove what is there, grade so water runs away from the house, compact the base, set forms and place the steel. Thickness and steel are set for each site, from what the slab has to carry and what the plans call for.
3. On pour day we place the concrete, apply the color and stamp as soon as the surface holds a clean impression. In summer we usually start early in the day, since normal August highs run about 97 degrees in Woodland Hills.
4. Heat, wind and the site all play into the pour date, so we set it with you, and it can move if the weather turns.
5. Control joints are tooled or saw cut in a layout planned for the size and shape of the slab.
6. Once the slab has cured enough, on the timing the sealer maker recommends for that product and the weather, we wash off the extra release, let it dry and seal it in thin coats.

### What sets the price of stamped concrete

Price follows square footage, the number of patterns and colors, the demolition and grading that come first, and how the truck or pump reaches the pour.

Steel, borders, steps, drainage, and plans and permits where the city requires them change the number too. Every job is different, so we do not quote from a chart.

Our number comes from a free on-site estimate. Call or text (818) 464-5763, or send a message with photos and rough measurements.

### Stamped Concrete questions

**Is stamped concrete slippery when wet?**
It can be if it is sealed to a high gloss with nothing added for traction. Around pools and on slopes we usually pick a lower-gloss sealer with a fine grit additive and a stamp with enough texture to grip.

**How thick is a stamped concrete slab?**
There is no single number. Thickness, steel and the joint layout are set for each site, from what the slab has to carry, the ground under it and the plans, the same way we build a plain driveway or patio. We go over it with you at the estimate.

**How long before I can walk or drive on new stamped concrete?**
It depends on the mix, the weather and the sealer, so we give you the timing for your job once it is poured. Foot traffic comes first, then cars, and moving vans, RVs and loaded trucks wait the longest.

**Does stamped concrete fade in the sun?**
Color hardener and integral pigments are mineral oxides that their makers rate as UV stable. What changes most is the sealer, which dulls under sun and traffic. A cleaning and a fresh coat usually bring the depth back.

**Is stamped concrete better than pavers?**
It depends on the site. Stamped concrete is one slab, so there are no loose pieces under tires and no sand joints for weeds. Pavers can be lifted and reset if a pipe under them has to be dug up.

**Can you stamp over my existing concrete?**
Yes, when the slab is sound. A stampable overlay is a thin polymer-modified cement topping that takes the same stamps. It is not a fix for a slab that is heaving or broken, which we explain under resurfacing and sealing.

## Concrete Staining

URL: [ikonconcrete.com/services/concrete-staining](https://ikonconcrete.com/services/concrete-staining)

Acid and water-based stains for existing driveways, patios, pool decks and floors. Translucent, mottled color that becomes part of the concrete, finished with saw-cut patterns and sealer.

We stain existing concrete driveways, patios, walks, pool decks and floors in the San Fernando Valley and the Santa Clarita Valley. Stain is not paint. It soaks into cured concrete and colors the surface itself, so there is no film to peel and the slab's natural variation shows through.

Staining and coloring are different jobs. Stain goes on concrete that has already cured, whether it is fairly new or thirty years old, while colored concrete gets its pigment on the day of the pour.

Stain is translucent, so it will not hide patches, oil spots, old repairs or other marks. A slab too marked up for stain can get a thin overlay first, covered under resurfacing and sealing.

### Is your slab a good candidate for stain?

- It passes the water test: sprinkled water soaks in fast and darkens the surface evenly. If it beads, sealer has to come off first
- The surface is sound, with no flaking, pitting or sandy top layer
- You are fine with variation, since stain is mottled and no two slabs match
- Patches and old repairs are few. Patch material takes stain differently from the slab around it
- New concrete has had time. Acid stain wants a slab that has cured for as long as the stain maker calls for
- Outdoors, you want browns, tans, ambers or reds. Blue-green acid stains can turn black with rain or sprinklers and are for interiors only

### How we stain a slab, step by step

1. Test. We stain and seal a small out-of-the-way spot so you see the real color first.
2. Clean and open the surface with degreaser and an alkaline cleaner, after stripping any sealer. We do not acid wash first, because the stain makers say not to.
3. Lay out and cut the pattern, then mask walls, posts, doors and plants.
4. Spray the stain, usually in two applications, and give it the reaction time the stain maker calls for. Slab temperature matters to stain, so in summer we usually work early in the morning.
5. Neutralize with a baking soda solution, scrub, and rinse until the surface tests neutral and a white rag wipes clean. The rinse water is collected, since it cannot run to the street or a storm drain.
6. Let the slab dry completely, then seal on the timing the sealer maker recommends for that product and the weather. We tell you when it is ready for cars.

### What goes into the price of staining

Size sets part of the price, and prep is the swing factor. A driveway with old sealer, oil stains and paint drips can take longer to prep than to stain.

Saw-cut patterns, layered colors, borders and hand-applied detail add time, and so does masking around walls, posts and plants. No two slabs are alike, which is why we look before we price.

We give our price after seeing the slab, at no charge. Send photos through the contact page or text (818) 464-5763.

### Concrete Staining questions

**How long does stained concrete last?**
Acid stain color is part of the concrete surface rather than a coating on top, so there is no film to chip or peel. What wears is the sealer on top and, in heavy traffic lanes, the surface of the concrete itself. Sun, traffic and upkeep decide how soon that shows.

**Can old concrete be stained?**
Usually, yes. Very old or weathered slabs sometimes have too little free lime left for acid stain to react, which shows when the stain does not fizz on the test spot. Those get a water-based stain.

**Will stain cover oil spots, patches or old repairs?**
No. Stain is see-through, so anything on the slab now will still show, and patched areas usually come out a different shade. A thin overlay first gives a uniform surface to stain.

**What is the difference between acid stain and water-based stain?**
Acid stain reacts chemically with the concrete and gives mottled earth tones with no film on top. Water-based stain deposits pigment in the pores, comes in more colors, and has no acid residue to neutralize, which suits interior floors.

**Can a stained driveway handle cars?**
Yes, when it is acid stained and sealed with a sealer made for vehicle traffic. Turning tires are hard on any sealer, so driveways need resealing sooner than patios.

**Is stained concrete slippery?**
Stain does not change the texture, so a broom-finished patio keeps its grip. A smooth troweled slab under a glossy sealer can be slick when wet, so there we use a lower-gloss sealer with traction grit.

## Colored Concrete

URL: [ikonconcrete.com/services/colored-concrete](https://ikonconcrete.com/services/colored-concrete)

Integral color mixed into the load or color hardener worked into the surface, for new driveways, patios, walks and pool decks. An even tone that is set on pour day.

We pour colored concrete for driveways, patios, walkways, pool decks and steps from Sylmar and the San Fernando Valley up through the Santa Clarita Valley. Colored concrete gets its color while it is being made or placed, either from pigment mixed through the whole load or from a colored hardener worked into the top of the slab.

It is a different thing from concrete staining, which colors a slab that already exists and gives a mottled look. Colored concrete gives a more even tone and costs little to maintain. With integral color the tone runs the full depth of the slab, so a chip shows more of the same color instead of gray. Color is also the base layer under most stamped concrete.

### What changes the color you end up with

- Cement and sand. Gray cement mutes every color, and another supplier's materials shift it again
- Water. Extra water in the mix or on the surface during finishing leaves the color uneven
- Finishing tools. Broom, wood float and steel trowel each leave a different shade
- Curing. Plastic sheeting and sprinklers leave streaks, so colored slabs get a curing compound instead
- Sun and shade on pour day. Shaded sections dry slower and can look darker at first
- Sealer. A film-forming sealer darkens the color and adds gloss, and a penetrating sealer changes it less

### How a colored concrete pour goes

1. Pick the color from the manufacturer's chart, then check it on a real sample.
2. Remove the old slab if there is one, grade for drainage, compact the base, set forms and place the steel.
3. Order the concrete with the same color dose in every truck. The pigment needs enough time turning in the drum to spread evenly through the load.
4. Place, level and finish. In hot weather we usually pour early and dampen the base and forms first, and we avoid sprinkling water on the surface to make finishing easier.
5. For color hardener, broadcast half the dose once the bleed water is gone, float it in, then broadcast the rest from another direction.
6. Cut or tool the control joints and apply curing compound, then give the slab the curing time its mix and the weather call for.

### What sets the price of colored concrete

Color adds to the price of a plain slab in two places: the pigment or hardener, and the extra care in finishing and curing. Deeper colors take more pigment per yard, and color hardener takes more labor than integral color.

The rest of the price is the slab itself: demolition and haul off, grading and base, forms, steel, drainage, and how the truck reaches the pour. Each site is different, so a figure from a chart would not tell you much.

Our price is worked up at a free estimate from your square footage, thickness, access and color. Send a message to set one up.

### Colored Concrete questions

**Does colored concrete fade?**
Iron oxide pigments are rated UV stable and lightfast by their makers. What makes colored concrete look faded usually sits on the surface: dirt, worn sealer, or efflorescence, a white mineral haze that water carries up out of the slab. Cleaning usually brings the color back.

**Is integral color or color hardener better?**
Integral color is simpler and goes all the way through, which makes it forgiving on driveways and broom finishes. Color hardener gives a harder wearing surface and stronger color, and it is common under stamped patterns.

**Can you add color to concrete that is already poured?**
Not with these methods, because both have to go in while the concrete is fresh. An existing slab is colored with stain, or given a new colored surface with an overlay.

**Will my concrete match the color chart exactly?**
Expect close, not exact. Charts show one cement, one finish and one curing method, and your pour will differ in at least one of those. That is why we look at a physical sample before ordering.

**Why does new colored concrete look blotchy at first?**
Fresh concrete dries unevenly. Edges and sunny areas dry first and look lighter, while shaded areas and the middle of a big slab stay darker longer. Most of that evens out as the slab dries.

**How do you maintain colored concrete?**
Very little is needed. Sweep it, clean off oil and leaf stains, and reseal when water stops beading if it was sealed to begin with.

## Decorative Concrete

URL: [ikonconcrete.com/services/decorative-concrete](https://ikonconcrete.com/services/decorative-concrete)

Stamped, stained, colored, scored and exposed aggregate concrete, plus borders, bands and pads with turf or gravel strips. We help you pick the finish that fits the slab, the sun and the budget.

We design and build decorative concrete for homes and businesses in the Santa Clarita Valley, the San Fernando Valley and Los Angeles County north of downtown. Decorative concrete is any slab finished for looks as well as use: a pattern, a color, a cut design, or stone showing at the surface.

This page is the map, and each finish has its own page with the details. Start with one question: are you pouring new concrete, or working with a slab you already have? That decides which finishes are open to you.

A Google reviewer, Eugene Song, described his first meeting with Gilbert Rico, our owner: "He was advising me on some of the different options for decorative concrete, which he specializes in, and looks great."

### What to decide before the estimate

- New pour or existing slab. A slab that is broken or lifting has to come out first
- How the surface gets used: cars, foot traffic, pool water, patio furniture
- How much sun it gets. Dark colors soak up heat, and normal July highs reach the mid 90s in Woodland Hills
- How much pattern you want next to the stone, stucco and roof tile already on the house
- Whether an HOA has to sign off. Where the rules require approval, California Civil Code 4765 requires a written answer, so apply before you pick a start date
- How much upkeep you will accept. Sealed finishes look richer and need resealing as they wear

### From first visit to finished slab

1. Site visit. We look at the slab or the ground, drainage, access, and what the finish has to sit next to.
2. Finish selection, narrowed to one or two with color charts and photos of our own work.
3. Written estimate, free, with the finish, colors, borders and joint layout spelled out.
4. Sample. For stains and custom colors we make a test area on your slab or a small sample pour, since printed charts and real concrete differ.
5. Build. Demolition and base work for a new pour, or surface prep for an existing slab, then the finish.
6. Seal and hand off. We go over cleaning and how to tell when it needs resealing.

### What sets the price of decorative concrete

The finish matters less to the price than what happens under it. A stain on a clean slab is mostly surface labor, while a stamped driveway includes demolition, hauling, grading, base, forms, steel, concrete and the finish.

That is why two jobs with the same finish can land far apart. Truck access, how much old concrete comes out, drainage, borders, the number of colors, and any plans or permits all move the number, and every job is different.

We do not price from a chart. The estimate is free, done on site, and specific to your slab and layout.

### Decorative Concrete questions

**What is the most affordable decorative concrete finish?**
On a slab you already have, a single-color stain and sealer usually costs least, because there is no demolition or new concrete. On a new pour, integral color with a broom finish adds the least to the price of plain gray.

**Which decorative finish holds up best in full sun?**
The ones that put mineral color in or on the concrete itself: integral color, color hardener and acid stain. Their makers rate those colors as UV stable. Film sealers are what wear in the sun, so sealed finishes need recoating as they dull.

**Can you match my existing concrete?**
Close, not exact. Color depends on the cement, sand, water, finishing and age, and no two pours share all of those. Where new meets old we suggest a border or band in a deliberate contrast, so the joint looks planned.

**Do I need HOA approval for decorative concrete?**
If your association's governing documents require approval for exterior changes, yes. Civil Code 4765 requires the association to follow a fair written procedure and to explain a denial in writing. We can supply pattern names, color numbers and a layout sketch for the application.

**Can different finishes be combined on one project?**
Yes, and it often looks better than one finish everywhere. Common pairings are a stamped field with a smooth colored border, or stained panels separated by saw cuts.

**How do I take care of decorative concrete?**
Sweep it and clean oil or leaf stains before they set. When water stops beading and the color looks flat, it is time for a cleaning and a new coat of sealer.

## Concrete Driveways

URL: [ikonconcrete.com/services/concrete-driveways](https://ikonconcrete.com/services/concrete-driveways)

New and replacement concrete driveways on compacted base, with thickness, steel and joints planned for each site. Broom, scored, saw-cut, stamped or stained finishes, plus approaches and aprons.

We pour new concrete driveways and tear out and replace old ones across the Santa Clarita Valley, the San Fernando Valley and nearby parts of Los Angeles and Ventura counties. Ikon Concrete Design is family owned, in business since 1999 and licensed in California under number 770901.

A driveway carries more weight than any other flatwork at a house, so what matters most is under the surface: evenly compacted soil, thickness and steel set for what the driveway has to carry, and control joints laid out before the pour. The finish is your choice. Broom is standard, and you can add scored patterns, stamped concrete or a stain.

### Signs it is time to replace a driveway

- Breaks wide enough to catch a shoe heel, or one piece sitting higher than the next
- Sections that have sunk and hold water after rain
- Slabs lifted by tree roots near the street or a planter
- A surface flaking or pitted across most of the slab
- Water running toward the garage and not toward the street
- A slab that breaks up more each time a heavy vehicle parks on it

### How a driveway pour goes, step by step

1. Estimate. We measure, check the slope and soil, and look at how a truck or pump will reach the driveway.
2. Demolition. The old slab is saw cut where it meets concrete that stays, broken out and hauled away.
3. Grade and base. The ground is shaped so the slab drains toward the street, then compacted. Parts of Los Angeles and Ventura counties sit on expansive clay, which swells when wet, and there the base under the slab is planned for that soil.
4. Forms and steel. Rebar or mesh is set on supports. Isolation joint material goes where the driveway meets the garage slab, the house or the sidewalk so each can move on its own.
5. Pour and finish. August highs average about 97 degrees in Woodland Hills and about 95 in Santa Clarita, and heat makes concrete set fast, so summer pours usually start early. Control joints go in on the layout planned for the slab.
6. Cure. The slab is kept from drying out while it cures. How soon you can walk on it, park a car on it or bring in an RV or heavy truck depends on the mix and the weather, and we give you those dates for your pour.

### What sets the price of a concrete driveway

Size is the biggest part of the price. After that come removal of the old slab, grading and base, truck access, thickness and steel, and the finish.

Drainage, an apron that needs a city permit, and any plans the city asks for add to it. Every driveway is different, which is why we price each one at the property.

Our number comes from a free on-site estimate. Call or text (818) 464-5763, or send a message with the address and a couple of photos.

### Concrete Driveways questions

**How thick should a concrete driveway be?**
It depends on what will use it and what the ground is like. We set the thickness and steel for each driveway from the vehicles that will park on it, the soil, and any plans or city standard that applies, and we go over it with you at the estimate.

**How long before I can drive on a new concrete driveway?**
It depends on the mix, the weather and the vehicle. Foot traffic comes first, then cars, and RVs, moving trucks and other heavy loads wait the longest. We tell you when your driveway is ready for each.

**Do I need a permit to replace my driveway?**
The apron between the sidewalk and the street does, because it is public right of way. Los Angeles issues a Class A permit through the Bureau of Engineering, Santa Clarita an encroachment permit, and unincorporated Los Angeles County a road construction permit. We will tell you at the estimate what your job needs.

**Does a driveway need rebar or wire mesh?**
It depends on the driveway. The steel, like the thickness, is set for what the slab carries, the soil and any plans. Steel does its job only when it sits up in the slab, so we set it on supports instead of leaving it on the dirt.

**What are the grooves cut into a concrete driveway?**
Those are control joints, a normal part of any concrete driveway. We lay them out to suit the size and shape of the slab, and they can be worked into a scored pattern or a border so they look planned.

**Should I repair, resurface or replace my driveway?**
Resurface if the slab is solid and level and only the surface is worn. Replace it if sections have sunk, lifted or broken apart, because an overlay is only as steady as the slab under it. See concrete resurfacing.

## Concrete Patios

URL: [ikonconcrete.com/services/concrete-patios](https://ikonconcrete.com/services/concrete-patios)

Concrete patios from plain broom finish slabs to stamped and stained designs, with seat walls, cover footings and turf strip pads. Graded to drain away from the house.

We build concrete patios for homes in the San Fernando Valley, the Santa Clarita Valley and the parts of Los Angeles and Ventura counties around them: plain slabs, stamped and stained patios, slabs under a patio cover, seat walls, and grids of concrete pads with turf strips between them.

The first thing we ask is how the space will be used. A table for eight, a barbecue island, a spa or a cover added later each change the size, the thickness and where the footings (thickened concrete under a post or wall) have to go.

Decorative concrete is a specialty of Gilbert Rico, who owns the company. After a first conversation about decorative options, Google reviewer Eugene Song wrote that Gil "knew everything about concrete."

### What to decide before the estimate

- What goes on the patio: table, barbecue, spa or fire pit
- Whether a cover or pergola is planned, now or later, so footings go in with the slab
- The finish: broom, scored, stamped, stained or colored. Photos of patios you like help
- Where the water goes once it runs off the slab
- Sleeves under the slab for gas, electrical or irrigation lines
- Whether your HOA has to approve the design first

### How we build a patio

1. Layout. We mark the shape on the ground so you can stand in it and change it before anything is dug.
2. Excavation and grade. California's residential code calls for paved surfaces within 10 feet of the foundation to slope at least 2 percent away from the house. That is about a quarter inch per foot, and we set the forms to drain.
3. Base and forms. The ground is compacted evenly, and form boards or bender board for curves set the edges.
4. Steel, footings and sleeves. Rebar or mesh goes in on supports, footings for seat walls or cover posts are dug, and conduit sleeves are placed.
5. Pour and finish. Stamping, coloring and broom work all happen in the first few hours, so each pour is sized to what the crew can finish well that day. Saw-cut joints follow once the slab is ready for the saw.
6. Cure and seal. The slab is kept from drying too fast while it cures. Decorative work is sealed once the slab has cured enough, on the timing the sealer maker recommends, and we tell you when the patio is ready for foot traffic and furniture.

### What sets the price of a concrete patio

Square footage, finish and site work set the price, and the finish moves it most. A plain broom slab, a scored pattern, a stamped and colored design and detailed custom work each take more time and material than the one before.

Site work is the part people forget. Removing an old slab or lawn, pumping or wheeling concrete into a yard with no truck access, footings, seat walls and drains all add labor.

Every yard is different, so we measure yours and give you a number at no charge. Use the contact page or call (818) 464-5763.

### Concrete Patios questions

**How thick should a concrete patio be?**
We set it for each patio and its plans. Spots that carry more, such as a spa, a masonry barbecue island or a cover post, usually get a thicker section or their own footing, and we go over that at the estimate.

**Does a concrete patio need to slope?**
Yes. California's residential code calls for paved surfaces within 10 feet of the foundation to slope at least 2 percent away from the building. You will not notice it under a table, but water will. If the yard has nowhere for that water to go, we can add a drain; see drainage systems.

**Can you pour a new patio over an old one?**
Usually no. A second slab raises the surface toward the door threshold, and whatever is wrong with the old slab carries up into the new one. If the old patio is level and sound, an overlay is the way to change its look; see concrete resurfacing.

**Do I need HOA approval for a patio in Valencia or Santa Clarita?**
If your home is in an association whose governing documents require approval for exterior changes, yes, and get it before work starts. California Civil Code section 4765 requires the association to follow a fair, reasonable and expeditious procedure and to answer in writing.

**What is the best time of year to pour a patio in the San Fernando Valley?**
Any month works here, but summer takes more care. In Woodland Hills the average August high is about 97 degrees, and hot, dry, windy air pulls water out of the surface before it can be finished. In those months we usually pour early in the morning and dampen the ground before the truck arrives.

**What finish is best for a concrete patio?**
A broom finish costs the least and has the most grip. Stamped concrete gives the look of stone or brick in one pour, and stain adds color to a plain or existing slab. Anywhere that stays wet, pick texture over gloss; our pool decks page covers that.

## Sidewalks & Walkways

URL: [ikonconcrete.com/services/concrete-sidewalks](https://ikonconcrete.com/services/concrete-sidewalks)

Private walkways, side yards and garden paths, plus permitted repair of public sidewalks lifted by tree roots or broken with age. Broom, scored or stamped finishes and stepping pads.

We pour concrete walkways on private property and repair public sidewalks in front of homes and businesses in the San Fernando Valley, the Santa Clarita Valley and Los Angeles north of downtown. The concrete is the same. The rules are not.

A walk on your own lot, such as a front path, a side yard or a path to the pool, is yours to design. The sidewalk along the street is public right of way. It has to match the city's or county's standard for width, slope, scoring and finish, the work needs that agency's permit, and its inspector checks it.

California Streets and Highways Code section 5610 makes the owner of the lot a sidewalk fronts responsible for keeping it safe.

### Signs a walk needs repair or replacement

- One panel sits higher than the next. Accessibility standards allow a vertical lip of no more than a quarter inch
- Panels pushed up into a peak next to a street tree or a large yard tree
- Breaks that run the full width of a panel and keep widening
- Water standing on the walk or running toward the house
- A surface worn smooth or flaking, slick when wet
- A notice about the sidewalk from the city, an insurer or a buyer's inspector

### How sidewalk and walkway jobs go

1. Site visit. We work out whether the walk is on private property or in the right of way. That decides the permit, the standard and who inspects.
2. Permit, if the walk is in the right of way. Nothing is cut until the city or county has issued it.
3. Removal. Old panels are saw cut at the score lines and lifted out. Santa Clarita's rules call for replacing concrete from score line to score line or by the full panel.
4. Roots, base and forms. Roots are handled under the right tree permit, the soil is compacted evenly and forms are set to the required width and slope.
5. Inspection and pour. Santa Clarita requires 24 hours notice before work starts and inspects concrete forms one hour before the pour. We pour, broom the surface and tool score lines to match the panels on either side.
6. Cure and reopen. Barricades stay up while the concrete gains strength, and we tell you when the walk is ready for foot traffic.

### What sets the price of sidewalks and walkways

A walkway is priced by its area, what has to come out, the finish and how hard it is to get concrete to it. Slope, roots and any city standard the walk has to meet change it too, and no two walks are the same.

Public sidewalk repair adds a permit, pedestrian protection, matching the agency's scoring and finish, and sometimes root work. The Los Angeles Sidewalk Repair Rebate Program has paid owners back part of the cost, up to a set amount per lot, but when we last checked new applications were going on a waitlist.

Ikon does not publish prices. We measure the walk, tell you which rules apply and give you a number at no charge. Call (818) 464-5763 or use the contact page.

### Sidewalks & Walkways questions

**Who is responsible for fixing the sidewalk in front of my house in Los Angeles?**
Under state law, the owner of the adjoining lot is responsible for keeping the sidewalk safe. The City of Los Angeles also runs its own long-term repair program. If you do not want to wait for it, you can hire a licensed contractor to make the repair under a Class A permit.

**Do I need a permit to repair a public sidewalk?**
Yes. In the City of Los Angeles it is a Class A permit from the Bureau of Engineering, with the fee waived when street tree roots caused the damage. Santa Clarita requires an encroachment permit for any work in the public right of way, and unincorporated Los Angeles County requires a road construction permit.

**Who fixes sidewalks in Santa Clarita?**
Start with the City. Santa Clarita runs an annual program that repairs sidewalks and driveway approaches damaged by tree roots and settling, and you can report a problem through its Resident Service Center or at (661) 294-2500.

**Can tree roots be cut to fix a lifted sidewalk?**
Not without permission when it is a street tree. In Los Angeles, trimming street tree roots takes a street tree permit from the Bureau of Street Services, issued after the Class A permit.

**What does the Los Angeles sidewalk rebate program require?**
The whole sidewalk in front of the property has to meet accessibility standards when the work is done, and the contractor must hold an A, C-8, C-12 or C-61/D-06 license. After the City inspector signs off, the City issues a Certificate of Compliance and covers one repair for 20 years on residential lots or 5 on commercial lots.

**How soon can we walk on a new sidewalk?**
It depends on the mix, the finish and the weather, so we tell you when the barricades can come down. Hand trucks and anything with small hard wheels should stay off the edges for a while longer than foot traffic.

## Concrete Pool Decks

URL: [ikonconcrete.com/services/pool-decks](https://ikonconcrete.com/services/pool-decks)

Concrete pool decks and coping surrounds for new and existing pools, with slip resistant finishes, lighter colors that stay cooler, and slope and drains that carry water away from the pool.

We build the concrete around swimming pools and spas in the Santa Clarita Valley, the San Fernando Valley and nearby Los Angeles and Ventura county communities. Your pool builder builds the pool. We pour the deck, the surround at the coping (the cap along the pool's edge) and the walks, steps and pads that connect the pool to the house.

A pool deck has three jobs a patio does not. It has to grip wet bare feet. It has to stay cool enough to stand on in August. And every gallon that splashes out or falls as rain has to run away from the pool and the house.

We work on new pools around the pool contractor's schedule, and on existing pools where the old deck has broken up or sunk. Where the old slab is still sound, a resurfacing overlay can change the surface without a tear-out.

### Signs an existing pool deck needs work

- The sealant joint behind the coping has split, shrunk or gone missing
- Slabs have sunk or tilted toward the pool, or puddles sit on the deck after rain
- The surface is slick when wet or too hot to stand on in summer
- Breaks run from the pool edge out across the deck
- Coping stones or waterline tiles have broken where the deck presses on them
- The pool is being remodeled and the old deck no longer fits its shape

### How a pool deck job goes

1. Site visit. We measure, check which way the yard falls, look at the coping joint and go over finish and color.
2. Coordination. The electrical code requires the surfaces around a pool, including deck steel within 3 feet of the water, to be bonded to the pool's bonding grid. The pool contractor or an electrician makes that connection, and it is inspected before concrete covers it.
3. Demolition and grade. On an existing pool the old deck is cut and removed in sections, with the water protected, and the ground is regraded and compacted.
4. Forms, steel, drains and joint. Forms set the slope. Drains and their piping go in, steel is set on supports, and joint material goes against the back of the coping.
5. Pour and finish. We place the concrete, work in the texture and cut control joints so panels stay close to square.
6. Cure, seal and caulk. The deck cures, decorative finishes are sealed with a grit additive once the concrete is ready, on the sealer maker's timing for that product and the weather, and the coping joint gets its flexible sealant last.

### What sets the price of a pool deck

A pool deck is priced from its size and finish, and the backyard around it decides much of the rest. Every yard is different.

What moves the number: whether an old deck comes out, how the crew and the concrete reach the backyard, curves and steps, drains, the finish, and any walls or raised areas.

For a price on your pool, we need to see it. The estimate is free. Call or text (818) 464-5763 or send us the details.

### Concrete Pool Decks questions

**What is the best concrete finish for a pool deck?**
A textured one. Broom, exposed aggregate and textured stamped finishes all grip wet feet. Smooth troweled concrete and glossy sealers without a grit additive are the ones to avoid around water.

**How do you keep a concrete pool deck from getting hot?**
Choose a light color. Light surfaces reflect more of the sun's energy than dark ones, so a pale gray or sand deck is usually cooler under bare feet than a dark stained one.

**Do you build or remodel swimming pools?**
No. We build the concrete around the pool: the deck, steps, walks, pads and nearby retaining walls and seat walls. The shell, plumbing, equipment and plaster belong to a pool contractor, and we schedule around them.

**Why is there a flexible joint between the coping and the deck?**
It lets the pool and the deck move separately. The flexible sealant keeps the deck from pushing on the coping and tile and keeps water from getting down behind the pool wall.

**Can a worn or broken pool deck be resurfaced, or does it need replacing?**
It can be resurfaced if the slab is solid and has not sunk. A deck that is still moving needs replacing, since a thin topping does nothing to stop the slab under it from shifting.

**Are there rules for decks at apartment, HOA or hotel pools?**
Yes. Those are public pools, and in Los Angeles County their plans are reviewed by the Department of Public Health. Its requirements call for a continuous slip resistant concrete deck at least 4 feet wide around the pool, with drains at least 4 feet from the water. See commercial concrete.

## Drainage Systems

URL: [ikonconcrete.com/services/drainage-systems](https://ikonconcrete.com/services/drainage-systems)

French drains, area drains, catch basins, channel drains, downspout tie-ins and regrading that collect storm water and carry it to the street or another approved outlet. Drainage is an Ikon specialty.

Ikon Concrete Design lays out and installs yard and site drainage systems throughout the Santa Clarita and San Fernando valleys and the surrounding parts of Los Angeles and Ventura counties. We specialize in it: French drains, area drains and catch basins, channel drains, downspout lines, drains behind retaining walls, sump discharge lines, and regrading so water runs away from the house.

Our weather is the reason this work matters. Downtown Los Angeles averages 14.25 inches of rain a year, and about 11.6 of those inches fall from December through March, according to National Weather Service normals for 1991 to 2020. The ground dries hard for most of the year, then takes most of a year's rain in a handful of storms.

A drain system has to answer two questions before any pipe goes in: where is the water coming from, and where is it allowed to go? Because we also pour the driveways and patios that drains get set into, the slab and the drain are built to work together.

### Signs your property has a drainage problem

- Water stands on the lawn, patio or driveway for more than a day after rain
- Soil, mulch or gravel washes onto walkways, or small channels are cut into a slope
- Water comes under the garage door or pools against the house
- A white chalky line or damp stain runs along the bottom of the stucco or a block wall
- Downspouts empty next to the foundation with no pipe to carry the water away
- A slab or wall near a spot that stays wet has started to tilt, sink or break

### How we lay out and install a drain system

1. Find the water. We walk the lot, see where roof water, yard water and slope runoff end up, and shoot elevations with a level so the plan is based on measured fall.
2. Find the outlet. The usual outlet is the street, through a pipe under the sidewalk and out the face of the curb, which is public right of way and needs a permit. Lots that sit lower than the street need a sump pump or another approved method.
3. Lay out and mark. Inlets, pipe runs and cleanouts are marked, and buried utilities are located through 811 at least two working days before we trench.
4. Trench and set pipe. Trenches are cut to a steady fall and checked against a string line, with the slope set by what the lot allows.
5. Set inlets and channels. Basins and grates are set to finished grade and the soil or slab around them is shaped to feed them.
6. Test and backfill. We run water through every inlet and watch it leave the outlet before the trenches are closed, then backfill, compact and patch any concrete we cut.

### What sets the price of a drainage system

Three things set the price: how many feet of pipe, how deep it has to go to keep its fall, and what is on top of the route. A trench across open lawn is quick, and one under a driveway or patio means saw cutting, removal and new concrete.

A curb outlet adds a permit and sidewalk work, and a sump pump adds a basin, a pump and power. A deep drain along a foundation is more work than a shallow yard line, and every lot drains differently.

We do not quote drainage over the phone, because the fall of the lot decides the design. Send a message and a few photos through the contact page for a free estimate. If a patio or driveway is in your plans, bring us in first, because pipe is far cheaper to place before concrete than after.

### Drainage Systems questions

**What is the difference between a French drain and an area drain?**
A French drain collects water from the soil through a perforated pipe bedded in gravel. An area drain collects water from the surface through a grate and carries it in solid pipe. Many yards need both, run to one outlet.

**Where can my yard drains legally discharge?**
In the City of Los Angeles, the building code requires roof drainage from new construction and site drainage from graded pads to be carried to the street, a natural watercourse or an approved drainage facility, as LADBS Information Bulletin P/BC 2026-057 explains. You may not regrade or pipe your lot in a way that sends more water onto a neighbor.

**Do I need a permit to run a drain to the curb?**
Yes, for the outlet, because the curb and sidewalk are public right of way. The City of Los Angeles handles curb drains under a Bureau of Engineering A-Permit, Los Angeles County requires a road permit to cut or rebuild curb, gutter and parkway drains, and Santa Clarita requires an encroachment permit for work in the right of way.

**How do I stop water from coming into my garage?**
That is the job a channel drain is built for. Water at a garage door usually comes down the driveway, so a channel drain across the driveway in front of the door catches it first. If the slab also slopes the wrong way, we may recommend replacing that section of concrete driveway.

**Do French drains clog?**
They can. Fine soil washing into the gravel is what stops a French drain, which is why the trench is lined with filter fabric and filled with clean washed rock. We install cleanouts so the pipe can be flushed or snaked.

**My house is below a burned hillside. What should I do before winter?**
Have the flow paths looked at before the first big storm. The National Weather Service says burned soil can shed rain almost like pavement, and that about half an inch in an hour can be enough to start flooding and debris flows. A yard drain is sized for ordinary runoff, not a debris flow, so also ask your city or county about sandbags and barriers.

## Block Walls & Stone Walls

URL: [ikonconcrete.com/services/block-walls](https://ikonconcrete.com/services/block-walls)

Property line walls, garden walls, pilasters and enclosures in CMU, split face or slump block, finished in stucco or stone veneer, all on reinforced concrete footings with grouted steel.

Ikon Concrete Design builds block walls and stone walls for homes and businesses in the San Fernando Valley, the Santa Clarita Valley and nearby parts of Los Angeles and Ventura counties. Block wall construction is one of our main lines of work, next to concrete and drainage.

We build property line walls, backyard privacy walls, front yard garden walls with pilasters, planter and seat walls, and trash and equipment enclosures, in standard gray block (the trade calls it CMU, for concrete masonry unit), split face or slump block.

The part of a block wall that matters most is the part you stop seeing once it is built: a concrete footing poured against undisturbed soil, rebar that runs from the footing up through the block, and grout packed around the steel. This is earthquake country, and a tall wall with no steel in it is a hazard. If the wall also holds back soil, it is a retaining wall and gets built as one.

### What to settle before a wall goes up

- Where the property line really is. The Los Angeles building department warns owners not to assume the inside edge of the sidewalk is the line
- Whose wall it is: shared on the line, or just inside your line and yours alone
- How tall it can be in the front, side and rear yards of your city and zone
- Whether the ground is level across the line, since a grade difference makes part of it a retaining wall
- The finish on each face, and whether your HOA has to approve it

### How a block wall gets built

1. Layout. We string the wall line off the property corners and have gas, water and electric lines located through 811.
2. Trench and steel. The footing trench is dug into undisturbed soil. On the Los Angeles standard detail the bottom of the footing sits from 1 foot 10 inches to 2 feet 6 inches below grade depending on its shape, with two continuous #4 bars and vertical dowels every 48 inches.
3. Pour the footing. Where a permit applies, the inspector sees the open trench and tied steel first. Then the footing is poured, with concrete at the strength the plans or the city detail call for.
4. Lay the block. Courses go up in running bond with horizontal steel in bond beam block at mid height and at the top.
5. Inspect and grout. On permitted walls the second inspection comes before grout. Then every cell that holds a bar is filled solid.
6. Cap and finish. Caps are set, the face is cleaned, and stucco or stone goes on once the wall has cured.

### What sets the price of a block wall

Length and height set the base price, since they decide how much footing, block, steel and grout the wall takes. Split face and slump block cost more than precision block, and stucco or stone veneer is priced on top of the structural wall.

Hand digging along an existing fence, removing an old wall first or stepping footings down a slope adds labor, and so do pilasters, caps, gates and any permit the wall needs. No two walls are the same.

Ikon's price comes from a free estimate on site. Send us the length, the height you want and a few photos through the contact page, or call or text (818) 464-5763.

### Block Walls & Stone Walls questions

**How tall can a block wall be in the City of Los Angeles?**
In most residential (R) zones the limit is 3 1/2 feet in the front yard. In side and rear yards it is 8 feet on lots at least 40 feet wide that are outside the Hillside Area, and 6 feet on narrower lots or inside the Hillside Area. Those numbers come from LADBS Information Bulletin P/ZC 2023-002, and specific plans and overlays can be stricter.

**Do I need a permit to build a block wall?**
In Los Angeles, a masonry or concrete wall over 3 1/2 feet tall needs a building permit. In the City of Santa Clarita, block walls and pilasters over 42 inches need one. We will tell you at the estimate whether your wall needs a permit.

**Who pays for a block wall on the property line?**
California Civil Code section 841 presumes that adjoining owners share equally in the reasonable cost of building and maintaining a boundary fence, unless they agree otherwise in writing. The owner who wants the work has to give the neighbor 30 days written notice first, so talk to your neighbor early.

**Does a block wall need rebar and grout?**
Yes. The steel ties the block to the footing and gives the wall its strength against earthquakes and wind. On the Los Angeles standard detail, every cell that holds a bar is grouted solid, and taller walls, pilasters and walls that retain soil get more steel.

**Can you put stucco or stone on my existing block wall?**
Usually, if the wall is sound. We check for damage, lean and loose caps first, because a finish will not fix a wall that is moving. If it fails that check, rebuilding is the better use of your money, and we handle the demolition and hauling.

**Are your stone walls solid stone or stone veneer?**
The stone walls we build are a reinforced block core faced with stone and topped with a stone or cast cap. The block core carries the load and holds the steel, and the stone is the finish you see.

## Retaining Walls

URL: [ikonconcrete.com/services/retaining-walls](https://ikonconcrete.com/services/retaining-walls)

Reinforced concrete block and segmental retaining walls on concrete footings, with gravel, drain pipe and weep holes behind the wall. Taller walls are built from your engineer's stamped plans.

We build retaining walls for homes and commercial properties across the Santa Clarita Valley, the San Fernando Valley and the hillside neighborhoods of Los Angeles and Ventura counties. Most are reinforced concrete block on a poured footing, and some are segmental block, the interlocking units that stack without mortar.

A retaining wall has two jobs: hold back the weight of the soil, and get rid of the water that soaks in behind it. Walls that lean or blow out have usually failed at the second job, so the walls we build get gravel and a drain line or weep holes, tied into a full drainage system when the yard needs one.

Building departments measure a retaining wall from the bottom of the footing to the top of the wall, not from the dirt you can see. A wall that shows 3 feet of block can be a 4 foot wall on paper.

### Signs a retaining wall is failing

- The wall leans out at the top or has a visible belly in the middle
- Stair step gaps open along the mortar joints, or one long split runs along a single course
- White mineral streaks or damp patches stay on the face long after rain
- Weep holes are buried, plugged or were never there
- Soil has sunk or opened a gap behind the top of the wall

### How we build a block retaining wall

1. Site check. We measure the height from where the bottom of the footing will be and tell you whether the wall falls under the permit rules where you live.
2. Footing trench. Utilities are marked through 811 and the trench is cut into undisturbed soil. Los Angeles requires footings at least 12 inches into natural ground, and Santa Clarita's standard plan adds a 12 inch wide key underneath to resist sliding.
3. Steel and pour. Horizontal bars and vertical dowels are tied up off the soil and inspected where a permit applies. The footing is poured with concrete at the strength the plans or the standard plan call for.
4. Block and grout. Block goes up in running bond with rebar in the cells. On Santa Clarita's standard plan the inspector sees the wall at mid height and again at the top before each grout pour.
5. Drain and backfill. The back of the wall is waterproofed and the pipe and gravel go in. Santa Clarita's standard calls for waiting at least 7 days after the last grout pour, then we backfill with soil that drains, compact it in thin layers and cut a swale so surface water runs to a drain.

### What drives the cost of a retaining wall

Height is the biggest factor, and not in a straight line: doubling the height more than doubles the footing, the steel and the excavation. Length, access, engineering and permits come next, and any wall carrying a surcharge costs more than one holding level ground.

Sloped and tight access sites, which describes a lot of hillside lots here, take more time, and the drainage behind the wall is part of the price. Every wall is different, so our number comes from a free estimate at your property.

### Retaining Walls questions

**Do I need a permit for a retaining wall in Los Angeles?**
In the City of Los Angeles, no building permit is needed for a retaining wall up to 4 feet tall, measured from the bottom of the footing to the top of the wall, when the ground behind it is level and the slope below is no steeper than 20 percent. A wall holding sloped backfill needs a permit even when it is short, per LADBS Information Bulletin P/BC 2026-002.

**What are the retaining wall permit rules in Santa Clarita?**
Santa Clarita exempts retaining walls up to 4 feet, measured from the bottom of the footing to the top of the wall, or 30 inches if the wall supports a slope or a surcharge. Dry stacked interlocking walls get 36 inches above the lowest grade, or 18 inches under a slope or surcharge. No exemption applies on a slope steeper than 3 to 1 or in a floodplain.

**How tall can a retaining wall be without engineering?**
Santa Clarita's standard block wall plan covers retained heights up to 5 feet 4 inches when its slope and setback limits are met. Taller walls, walls holding up a driveway or a building, and most hillside walls need plans stamped by an engineer.

**Why do retaining walls fail?**
Water, most of the time. Wet soil pushes much harder than dry soil, and a wall with no gravel, no pipe and no weep holes has to hold all of it.

**Can a leaning retaining wall be repaired, or does it have to be replaced?**
It depends on why it moved. A sound wall with plugged drains can sometimes be saved by digging behind it and rebuilding the drainage. A wall that has rotated on its footing or broken through has to come out, and we handle the demolition and hauling too.

**What is the difference between a retaining wall and a garden wall?**
A retaining wall holds soil that is higher on one side than the other. A garden wall or property line wall stands free with level ground on both sides. Many walls are both: retaining at the bottom with a freestanding block wall above.

## Foundations & Structural Concrete

URL: [ikonconcrete.com/services/concrete-foundations](https://ikonconcrete.com/services/concrete-foundations)

Slab on grade foundations, footings, stem walls, grade beams and structural slabs, formed, reinforced and poured to your engineer's stamped plans for ADUs, additions, homes and commercial pads.

Ikon Concrete Design builds concrete foundations and structural concrete from Santa Clarita and Sylmar across the San Fernando Valley, and in the nearby parts of Los Angeles and Ventura counties. That covers slab on grade foundations, continuous footings, stem walls, grade beams, pads and piers, and structural slabs for houses, ADUs, room additions, garages and commercial buildings.

We build from drawings. Your engineer or architect designs the foundation and stamps the plans, the building department approves them, and we form, tie steel and pour to what is on the sheet. We do not do the engineering ourselves.

If the ground has to be cut, filled or drained before the foundation can go in, we handle the grading and the drainage too, so one crew answers for everything below the framing.

### What to have ready before a foundation estimate

- The stamped structural plans, or the latest set if they are still in plan check
- The soils report, if your engineer or the city asked for one
- Permit status: issued, submitted or not started
- Who is doing the underslab plumbing and electrical, since their pipes go in before our steel
- Access for a concrete pump and a ready mix truck, including gate width and overhead wires
- Your target date for framing

### How a foundation job goes, layout to stripped forms

1. Layout. We set the building corners and elevations from the plans and string the footing lines. California law requires notice to 811 at least two working days before trenching.
2. Excavation. Trenches are dug to the depth on the plans. Where there is no soils report, the City of Santa Clarita code sets exterior footings at 24 inches deep and interior bearing footings at 18 inches, with two #4 bars top and bottom.
3. Forms and vapor barrier. Edge forms are staked and braced, the base is compacted, and the vapor barrier is laid with lapped seams and sealed around every pipe.
4. Steel. Rebar is tied to the bar schedule and held off the soil at the clearance the plans call for wherever concrete is cast against earth.
5. Inspection. The city or county inspector checks trenches, steel and hardware before any concrete is ordered.
6. Pour and cure. Concrete at the strength the plans specify is pumped in, vibrated around the steel and finished. We strip the forms once it has set.

### What a concrete foundation costs

The plans set the price. Footing depth and width, the amount of rebar, the concrete strength called out and the count of anchor bolts and hold-downs move the number more than square footage does.

Site conditions come next: how much soil has to be exported, how far the pump has to reach, and whether old concrete has to come out first. If it does, that is our own demolition and hauling crew, not a second contractor.

We do not publish foundation prices because no two sets of plans are alike. Send the drawings through the contact page or text them to (818) 464-5763, and we will set up a free estimate at the site.

### Foundations & Structural Concrete questions

**Do you build foundations from engineered plans?**
Yes. We build to the stamped structural drawings your engineer or architect provides and the building department approves, and we do not design foundations ourselves. If something on site does not match the plans, we stop and get an answer from your engineer before we pour.

**How deep do foundation footings have to be in Los Angeles and Santa Clarita?**
Follow your plans first. As a baseline, the City of Los Angeles standard for expansive soil and the City of Santa Clarita building code both call for exterior footings 24 inches deep and interior bearing footings 18 inches deep when no soils report says otherwise. Los Angeles treats all soil in the city as expansive unless an approved soils report proves it is not.

**How thick is a slab foundation?**
It depends on the engineering. The City of Los Angeles prescriptive standard for a one story wood frame house is a slab at least 3 1/2 inches thick with #4 rebar at 16 inches each way, over a moisture barrier. Engineered slabs are often thicker, and the thickened edges under the walls are far deeper than the floor.

**Can you pour a foundation for an ADU in my backyard?**
Yes. We need the approved plans, a way to get a pump hose to the pad, and the underslab plumbing finished and inspected before we cover it.

**How long before framing can start on a new foundation?**
Your plans or your engineer set that, because it depends on the mix and the loads. Concrete keeps gaining strength for weeks after the pour, and we pass along any waiting period your drawings call for.

**Do you work as a concrete subcontractor for general contractors?**
Yes. General contractors, architects, engineers and landscape designers are among our regular customers for foundations, footings, walls and flatwork. Send the plans and the schedule and we will bid the concrete scope.

## Grading & Hillside Construction

URL: [ikonconcrete.com/services/grading-hillside](https://ikonconcrete.com/services/grading-hillside)

Rough and finish grading, compacted building pads, swales, berms and hillside footings and walls, built to your civil engineer's grading plan and your geotechnical firm's soils report.

We do grading and hillside construction in Santa Clarita, the San Fernando Valley and the foothill and canyon neighborhoods of Los Angeles and Ventura counties: rough and finish grading, compacted pads for slabs and additions, swales and berms that steer runoff, and the footings, walls and drains that go with building on a slope.

Grading is rarely a job by itself for us. It is the first phase of a foundation, a retaining wall, a driveway or a drainage system, and the crew that grades the pad is the crew that pours on it.

On a hillside lot the design is not ours to make. A civil engineer draws the grading plan, a geotechnical firm writes the soils report, and the city or county approves both. Those come from the owner's consultants, and we build to them.

### When a job needs grading before concrete

- The yard slopes toward the house, or water collects where the new slab will go
- You are adding an ADU, addition, garage or pool and the plans show a new pad elevation
- The site has loose fill, old backfilled trenches or soil that stays soft
- A slope is eroding, or soil is piling up against a wall or fence at the bottom
- The plans call for a retaining wall, which means excavation and compacted backfill

### How a grading job runs

1. Plans and permits. We review the grading plan and soils report if the job has them, and tell you at the estimate whether the work is likely to need a grading permit. In Santa Clarita, equipment may not be brought to the site until that permit is issued.
2. Mark and clear. Buried lines are located through 811, limits are staked, and vegetation, old concrete and unsuitable soil come out.
3. Cut, fill and compact. Fill goes down in thin lifts at the right moisture and is compacted with a roller, plate compactor or rammer. On permitted jobs a soils technician tests the density as the fill comes up.
4. Shape the drainage. Swales, berms and pad slopes are cut so the site drains to the street or to the outlet on the plan.
5. Finish grade. Final elevations are checked and the pad is ready for forms. On permitted grading in Santa Clarita, rainy season erosion control has to be installed by November 1 and maintained until April 15.

### What sets the price of grading and hillside work

Grading is priced by how much soil moves and where it goes. Dirt cut from one spot and compacted in another on the same lot is the cheapest dirt. Soil trucked away, or fill trucked in, adds hauling and dump or material costs by the load.

Access is the second driver. A hillside lot reached through a side yard takes many more hours than an open lot for the same volume, and engineering, soils testing and permits are owner costs on top.

Hillside and engineered grading vary too much from lot to lot for a chart figure to mean anything. We price it from the plans and a free site visit. Reach us through the contact page.

### Grading & Hillside Construction questions

**When do I need a grading permit in the City of Los Angeles?**
LADBS requires a grading permit for cutting, filling, or importing or exporting earth, with a short list of exceptions. An excavation less than 2 feet deep, or one that does not create a cut slope over 5 feet high and steeper than 2 horizontal to 1 vertical, is exempt if the cut is 50 cubic yards or less and does not change the existing drainage pattern. That is from Information Bulletin P/BC 2026-128.

**What are the grading rules in Santa Clarita and unincorporated Los Angeles County?**
Los Angeles County exempts an excavation of 50 cubic yards or less that is under 2 feet deep, or that creates a cut slope no more than 5 feet high and no steeper than 2 to 1. The City of Santa Clarita requires a Hillside Development Review for grading over 100 cubic yards in a hillside area, in addition to the grading permit.

**What is the Baseline Hillside Ordinance?**
It is a City of Los Angeles zoning ordinance that, among other things, caps how much grading is allowed on a lot inside the city's mapped Hillside Area. Remedial grading that a geotechnical report recommends and the LADBS Grading Division approves does not count toward the cap.

**Do you provide the grading plan and soils report?**
No. Engineered grading plans come from a licensed civil engineer and soils reports come from a geotechnical firm, both hired by the owner. We are the contractor who builds what they specify.

**Can you regrade a yard that slopes toward the house?**
Yes. The building code target is at least 6 inches of fall in the first 10 feet away from the foundation. Where a property line, wall or slope makes that impossible, the code calls for drains or swales instead.

**How is fill dirt compacted?**
In thin layers, each brought to the right moisture and compacted with equipment sized for the area. Santa Clarita's grading standard requires fill to reach at least 90 percent of its maximum dry density under the ASTM D1557 test.

## Concrete Demolition & Hauling

URL: [ikonconcrete.com/services/concrete-demolition](https://ikonconcrete.com/services/concrete-demolition)

Removal of old driveways, patios, slabs, walls and footings, with saw cutting, hauling, recycling and cleanup. Usually done as the first step of a new pour by the crew that will pour it.

Ikon Concrete Design breaks out and hauls away old concrete in the San Fernando Valley, Santa Clarita and neighboring parts of Los Angeles County and Ventura County: driveways, patios, walkways, pool decks, building slabs, block walls, retaining walls and the footings under them.

For us, demolition is usually day one of a new pour. The crew that takes out your old, broken driveway is the crew that pours the new concrete driveway, so the tear-out is done with the replacement in mind: straight saw cuts where new concrete will meet old, and soft spots in the subgrade dug out.

We also take removal jobs for homeowners, landscape designers and general contractors who need concrete gone before another trade starts.

### Signs old concrete should come out, not be patched

- Breaks wide enough to catch a shoe, with one side sitting higher than the other
- Sections that have sunk or tilted, or that rock when a car rolls over them
- A slab that slopes toward the house or garage and sends water the wrong way
- Tree roots lifting panels, which can keep lifting whatever is poured on top if they stay
- Old patches that have broken again along the same lines

### How a concrete removal job goes

1. Walk and mark. We mark what goes and what stays and have buried lines located through 811. California requires that notice at least two working days before digging.
2. Protect. Plywood or mats go down where equipment crosses concrete that is staying, and nearby glass, stucco and plants are shielded from chips.
3. Saw cut. Straight cuts are made along the removal limits with a wet saw.
4. Break and load. The slab is broken with a breaker on a small machine, or with jackhammers where access is tight, and the pieces are loaded for hauling.
5. Check the base. Footings, roots and soft soil come out, and we tell you what the subgrade looks like before anything is covered.
6. Haul and clean up. Debris goes to a recycling or disposal facility and the area is swept. If we are pouring next, the base is graded and compacted for forms.

### What sets the price of demolition and hauling

Square footage and thickness set the starting point, since they decide how many tons there are to break and haul. Reinforcing steel and footings add time.

Access decides the method. If a small loader with a breaker can reach the slab, the work goes much faster than breaking by hand and wheeling pieces out through a gate. Disposal and what turns up under the slab change the number too, and every job is different.

When removal is part of a new driveway, patio or foundation, we price it as one job. Our figure comes from a free estimate on site. Message us through the contact page or call or text (818) 464-5763.

### Concrete Demolition & Hauling questions

**Do you haul away the concrete, or do I need a dumpster?**
We haul it. Loading, trucking, disposal and cleanup are part of the job when we do the demolition, so you do not need to rent a bin.

**Is old concrete recycled?**
Clean concrete is recyclable, and we take it to a recycler where one is available. The City of Los Angeles requires mixed construction and demolition debris to go to a certified processor, and the state green building code sets a 65 percent diversion rate for construction and demolition material on permitted projects.

**Can you remove just part of a driveway or patio?**
Yes. We saw cut along a joint or a straight line, take out the bad section and leave a square edge. New concrete will not match the old in color, so we place the cut where a change looks deliberate, such as at a control joint.

**Should I remove my old concrete or resurface it?**
If the slab is solid and the problem is on the surface, such as wear, stains or light flaking, concrete resurfacing can save it. If it is broken, sunken, lifted by roots or draining the wrong way, an overlay will not fix the slab under it, and removal is the better use of the money.

**Do I need a permit to replace a driveway apron or sidewalk?**
Yes, for the part in the public right of way: the driveway apron, the sidewalk and the curb. In the City of Los Angeles that work is done under a Bureau of Engineering A-Permit, and Los Angeles County requires a road permit to cut or rebuild curb, gutter, driveways and sidewalks.

**How loud and dusty is concrete demolition?**
It is loud while the breaker is running, and we tell you ahead of time which hours that will be so you can warn the neighbors. Dust is kept down with water at the saw blade and at the breaker point, the controls Cal/OSHA's silica standard lists for those tools.

## Hardscape & Outdoor Living

URL: [ikonconcrete.com/services/hardscape](https://ikonconcrete.com/services/hardscape)

Fire pits, curved seat walls, barbecue island bases, stepping pads in river rock or turf and stone veneer pilasters. We build the hard elements and work alongside landscape designers.

We build the hard elements of outdoor spaces in the Santa Clarita Valley, the San Fernando Valley and nearby Los Angeles and Ventura county neighborhoods: fire pits, curved seat walls, barbecue island bases, concrete stepping pads set in river rock or turf, and pilasters and low walls faced in stone.

Hardscape is the part of a yard that is poured or laid, as opposed to planted. It is concrete, block and stone on footings, and it is permanent, so the layout has to be right the first time. We work alongside landscape designers and from their plans, and directly with homeowners who know what they want built.

### Where hardscape works well

- Around a fire pit, where a curved seat wall replaces a ring of chairs
- Front yards converted from lawn, where stepping pads in river rock make a clean path to the door
- Hillside lots, where low walls and steps turn a slope into flat places to sit
- Along a pool, where pads with turf strips soften a wide deck
- At driveway entries and gates, where pilasters carry lights, a gate or the address
- Off the kitchen door, where a barbecue island keeps the cooking close to the house

### How a hardscape project goes

1. Plan. We start from your designer's drawing or a walk around the yard with you, and stake each element out at full size.
2. Utilities first. Gas, electrical and drain lines run under everything else, so the plumber and electrician rough in before footings are poured.
3. Footings. Trenches are dug to firm soil, rebar goes in, and footings are poured for walls, fire pits, islands and pilasters.
4. Block and forms. Block is laid and grouted with steel in the cells, or forms are built for poured walls and caps.
5. Caps, pads and flatwork. Caps and countertops are poured and troweled, stepping pads are formed and poured, and any patio slab between them goes in.
6. Veneer and finish. Stone veneer or stucco goes on the block, caps are sealed, and the gaps between pads are left ready for river rock or turf.

### What drives the cost of hardscape

Hardscape is priced by the piece, not by the square foot, because a fire pit, a 20 foot curved wall and a barbecue island have little in common. Length and height of walls, the number of footings, curves, the cap and veneer you pick, and the carry from the street all move the number.

Utilities are a separate line. The gas line is the plumber's price and the wiring is the electrician's, and both depend on the distance from the meter and the panel.

The estimate is free and done on site. Reach us at (818) 464-5763 or through the contact page, and look through the gallery to see finished work first.

### Hardscape & Outdoor Living questions

**Do you do landscaping, planting or irrigation?**
Our work is the built side of the yard: concrete, block, stone, drainage and grading. Planting plans and irrigation design are a landscape designer's work, and we build alongside them.

**Can I burn wood in a backyard fire pit in Los Angeles?**
Not on a no-burn day. South Coast AQMD issues no-burn alerts between November 1 and the last day of February, and during an alert all indoor and outdoor wood burning is prohibited. Gas fire pits are not subject to those alerts. Check your local fire department's rules as well, especially near hillside brush.

**Who connects the gas line to a fire pit or barbecue island?**
A licensed plumber. In California, gas piping from the meter to the fixture falls under the C-36 Plumbing classification. We build the structure, leave the sleeve and openings where the plumber needs them and schedule the pour around the rough-in.

**Do I need a permit for a seat wall or fire pit?**
It depends on height and on what is connected to it. In the City of Los Angeles, masonry or concrete fence walls over 3 1/2 feet high need a building permit, and gas and electrical work carry their own permits through those trades. Other cities set their own limits. We will tell you at the estimate whether yours needs one.

**Can stepping pads be set in artificial turf?**
Yes. The pads are poured first with even gaps between them, and the turf or river rock is fitted into the gaps afterward. Straight, consistent gaps are what make the pattern look right.

**Do you work from a landscape designer's plans?**
Yes. Give us the plan and we price and build the hard elements on it: footings, walls, caps, pads, steps and flatwork.

## Concrete Resurfacing & Sealing

URL: [ikonconcrete.com/services/concrete-resurfacing](https://ikonconcrete.com/services/concrete-resurfacing)

Deep cleaning and resealing for stamped and stained concrete, plus thin and stampable overlays for worn slabs that are still sound. We say so when a slab should be replaced instead.

We clean, reseal and resurface existing concrete in the Santa Clarita Valley, the San Fernando Valley and Los Angeles County north of downtown. Some worn concrete needs only a deep cleaning and fresh sealer. Some has a tired surface on a good slab and can take an overlay, a thin layer of polymer-modified cement bonded on top. Some has failed underneath and has to come out.

Telling those apart is the real service. An overlay is only as good as the concrete under it, and overlay makers say so plainly: for structurally sound, non-moving concrete only. We would sooner tell you a slab needs demolition and a new driveway or patio than put a topping on a slab that is still moving.

### Signs it is time to reseal or resurface

- Water soaks in and darkens the surface where it used to bead
- Stamped or stained color looks flat, chalky or faded even after washing
- Old sealer is white, cloudy, peeling or flaking in patches
- The top is worn, lightly pitted or stained, but the slab is flat and solid
- Old damage is small and has not changed in years
- Plan on replacement if the slab is broken or uneven, or sections have lifted or sunk

### How an overlay job goes

1. Assess the slab: its condition, joints and drainage. We tell you whether it needs a clean and seal, an overlay or replacement.
2. Strip and roughen. Sealer, paint, oil and weak surface material come off by pressure washing and grinding, to the surface profile the overlay maker calls for.
3. Patch damaged spots and spalls, and mark every existing joint so it can be cut back in.
4. Prime, then place the overlay, and on a stamped job, stamp it once it is ready to take the pattern. Overlay makers set a temperature range for their products, so summer work usually happens early in the morning or in shade.
5. Saw cut the joints over the old ones on the timing the overlay maker gives.
6. Color if the design calls for it, then seal once the overlay has cured enough, on the sealer maker's timing for that product and the weather. We tell you when it is ready for foot traffic and for cars.

### What sets the price of resurfacing and sealing

A clean and reseal is the least expensive service on this page, priced by area and by how much old sealer has to come off. Overlays cost more because of the prep: grinding, patching, primer and material.

Stamping, scoring and extra colors add to an overlay, and so does the repair a slab needs before anything goes on top. Every slab is different, and that shows up in the price.

An overlay usually costs less than demolition and replacement, but only if the slab is a good candidate. We look at it in person, at no charge, before pricing either option.

### Concrete Resurfacing & Sealing questions

**How often should stamped concrete be resealed?**
When it needs it, not on a schedule. The Decorative Concrete Council says to go by condition: reseal when water stops beading and the color loses depth. Sun, traffic and the sealer used all change how long that takes.

**Can old, damaged concrete be resurfaced?**
Sometimes. Small damage that is not moving can be repaired and covered, though overlay makers warn that repairs may still show through. A slab that is broken, offset or still moving points to a problem in the base or the soil, and an overlay is not the fix for it.

**Why did my concrete sealer turn white?**
Trapped moisture. It happens when sealer goes on damp concrete, goes on too thick, or builds up over years of recoating. Heavy buildup has to be stripped before new sealer goes on.

**Can you seal concrete in the summer?**
Yes, with the right timing. Sealer on a hot slab in direct sun skins over and bubbles, so the Decorative Concrete Council's rule of thumb is to seal while the slab temperature is falling, not rising. We also follow the timing the sealer maker gives for that product.

**What kind of sealer do you use?**
A film-forming acrylic for color depth on stamped and stained work, or a penetrating sealer for protection without gloss. Either one has to meet South Coast Air Quality Management District Rule 1113, which caps concrete and masonry sealers at 100 grams of VOC per liter in Los Angeles County outside the Antelope Valley.

**Is resurfacing cheaper than replacing concrete?**
Usually, yes, because there is no demolition, hauling or new base. It stops being cheaper when an overlay fails on a bad slab and you pay for both.

## Interior Concrete Floors

URL: [ikonconcrete.com/services/concrete-floors](https://ikonconcrete.com/services/concrete-floors)

Stained, sealed and saw-cut concrete floors for homes, garages, shops and showrooms, finished from the existing slab. We inspect the slab first and tell you what finish it can take.

We stain, score and seal interior concrete slabs in homes, garages, shops and showrooms in the San Fernando Valley, Santa Clarita and nearby parts of Los Angeles. If your building sits on a concrete slab, that slab can be the finished floor once the carpet, tile or vinyl comes up.

Interior floors are a smaller part of our work than driveways, patios and walls, and we take them case by case after looking at the slab. Most photos in our gallery are outdoor jobs. Indoors we use the same family of stains, saw cuts and sealers, with more masking and less water.

For new construction, the slab is poured under our concrete foundations service, and it helps to decide on an exposed floor before that pour.

### What we look for when the flooring comes up

- Glue, mastic and thinset. All of it has to come off, and the outline of a tile grid can still show through stain
- Tack strip holes from old carpet. They get patched, and patches take stain differently
- Paint, drywall mud and old sealer. Anything that keeps water from soaking in keeps stain out too
- Old damage and repairs. Stain will not hide them
- Moisture. Sealer should not go on a damp slab, so we check before sealing
- Hard, shiny troweled areas. They are too dense to take stain until they are sanded open

### How an interior floor job goes

1. Look at the bare slab, test how it absorbs water in several spots, and agree on the finish.
2. Stain and seal a test patch in a closet or corner for you to approve.
3. Mask baseboards, walls, door frames and cabinets with plastic and painter's tape.
4. Prep the slab. Adhesives and coatings come off, dense areas are sanded open, and the floor is scrubbed with an alkaline cleaner and wet vacuumed.
5. Cut any score lines, then stain. Acid stain is left to react for the time the stain maker calls for, then neutralized, scrubbed and rinsed, with the water picked up by wet vacuum.
6. Seal once the slab is fully dry, on the timing the sealer maker recommends, with a water-based sealer indoors, then apply a maintenance wax that takes the scuffs.

### What sets the price of an interior concrete floor

Most of the cost is in getting the slab ready: removing glue and thinset, patching, sanding and masking a finished room. An empty garage with a clean slab prices very differently from a living room with tile to pull up.

Score patterns, extra colors, the number of rooms and the repairs the slab turns out to need all add to the work. Every floor is different once the covering is off.

We price interior floors only after seeing the bare concrete, and the visit is free. Reach us through the contact page.

### Interior Concrete Floors questions

**Can you stain the concrete under my carpet or tile?**
Often, yes. It depends on what the slab looks like once the flooring and adhesive are off, and carpet usually leaves a cleaner slab than glued-down tile or vinyl.

**What is the difference between polished concrete and a sealed concrete floor?**
Polished concrete gets its shine from grinding and honing the slab itself. A sealed floor gets its shine from a clear coating applied over stained or natural concrete, and it needs rewaxing and an occasional recoat as that coating wears.

**How do you maintain a stained concrete floor?**
Dust mop and damp mop it like any hard floor. Stain makers recommend a maintenance wax on interior floors, renewed as it scuffs, so the wax wears instead of the sealer. Put felt pads under furniture legs.

**Will old marks and lines in my slab show?**
Yes. Stain is translucent, so lines, marks and old repairs already in the slab stay visible, and in a stained floor they usually read as character. Covering them takes an overlay first, and only on a slab that is stable enough for one.

**Do I have to move out while the floor is done?**
You need to be out of the rooms being worked on, with the furniture cleared. Indoor sealers here are low in solvent: the South Coast Air Quality Management District limits clear coatings for concrete floors to 50 grams of VOC per liter.

**Can you stain a garage floor?**
Yes, if the slab is clean or can be made clean. Oil that has soaked deep into the concrete blocks stain and can keep sealer from bonding, so heavily stained garage floors sometimes need grinding or an overlay first.

## Commercial Concrete

URL: [ikonconcrete.com/services/commercial-concrete](https://ikonconcrete.com/services/commercial-concrete)

Commercial sidewalks, curbs, ADA ramps with handrails and detectable warnings, bollards, and slabs for shops and warehouses, built from stamped plans for owners and general contractors.

We do commercial concrete for property owners, general contractors, architects and engineers in the San Fernando Valley, the Santa Clarita Valley, the rest of Los Angeles County north of downtown, and Ventura County. The work is sidewalks, curbs, ADA ramps with handrails and detectable warnings, bollard-protected walks, and slabs for shops and warehouses.

Commercial work is plan work. An architect or engineer draws it, the city approves it, and an inspector checks it against the drawings. Our job is to build what the stamped plans show, to the slopes and dimensions on the sheet, and to speak up before the pour when the site does not match the drawing.

Ikon holds two classifications under California contractor license 770901: C-8 Concrete and B General Building.

### What to send us for a bid

- The stamped plan sheets that show the concrete: site plan, details and structural notes
- The soils report, if one was done, and any special inspection requirements
- A CASp report or accessibility survey, if the work is an ADA correction
- The schedule, and the hours the business has to stay open and reachable
- Site access: where trucks and a pump can set up and what has to be protected
- Whether the permit is issued yet, and who is pulling it

### How a commercial job runs

1. Bid. We price from the plans and a site walk, and note anything in the field that does not match the drawings.
2. Schedule. At an open business the work is phased so an entrance and an accessible route stay usable. On a new build we fit the general contractor's schedule.
3. Layout and demolition. Elevations and slopes are set from the plans. Existing concrete is saw cut at clean lines and removed.
4. Base, forms and steel. Subgrade is compacted to the plan's requirement, forms are set to finished slopes, and rebar, dowels, handrail sleeves and bollards go in.
5. Inspection and pour. Forms and steel are inspected where the permit requires it. Then we pour, finish and joint the concrete.
6. Close out. Detectable warning panels and handrails go in, the concrete cures, and we walk the work with you or the inspector before barricades come down.

### How commercial concrete is priced

Commercial work is bid from the plans, so there is no per-square-foot figure worth printing here. Two ramps of the same size can come in at very different prices depending on demolition, handrails, curbs along the sides and how the site drains.

What moves a bid most: quantity, the thickness and reinforcing the engineer calls out, demolition and haul-off, access for trucks and pumps, night or weekend hours, phasing around an open business, and inspection or testing requirements. Right of way work adds the agency's permit and traffic control.

Send plans to ikonconcrete@gmail.com or through the contact page, or call (818) 464-5763. There is no charge for a bid.

### Commercial Concrete questions

**What is the maximum slope for an ADA ramp?**
1:12, one inch of rise for every 12 inches of run. The cross slope can be no steeper than 1:48, and one run can rise no more than 30 inches before a level landing. The 2010 ADA Standards and Chapter 11B of the California Building Code set the same three limits.

**When does a ramp need handrails?**
When the run rises more than 6 inches, the ADA Standards require handrails on both sides. The top of the gripping surface sits 34 to 38 inches above the ramp. Curb ramps are the exception and do not get handrails.

**Are truncated domes required on curb ramps in California?**
Yes. The California Building Code requires detectable warnings at curb ramps, extending 36 inches in the direction of travel. The federal 2010 ADA Standards require them only at transit facilities, so California is the stricter of the two.

**Can you build from a CASp report?**
Yes. A CASp is a Certified Access Specialist, certified by the State of California in construction-related accessibility standards, and the report lists the barriers found at a property. We are not CASp inspectors and do not write reports. We build the concrete corrections the report or your architect's plans call for.

**Do you work as a subcontractor for general contractors?**
Yes. We bid concrete to general contractors and also work directly for owners. License 770901 carries the C-8 Concrete classification and the B General Building classification.

**Do you repair city sidewalks and driveway approaches at commercial properties?**
Yes, under the permit the agency requires. In the City of Los Angeles that is a Class A permit for repairs that keep existing grades, and a Class B permit if the work changes the gutter flowline or the grade of the sidewalk or street. Santa Clarita requires an encroachment permit.

# Cities served

## Concrete contractor in Santa Clarita, CA

URL: [ikonconcrete.com/service-areas/santa-clarita](https://ikonconcrete.com/service-areas/santa-clarita)

We pour and build concrete across the City of Santa Clarita, in Newhall, Saugus, Canyon Country and Valencia. From our yard on Dyer Street in Sylmar we take the 210 to the 5 north, and City Hall on Valencia Boulevard is about 14 miles away, roughly 20 minutes when the Newhall Pass is moving. Canyon Country is about the same distance up the 14.

Those four communities became one city in 1987, but they were built decades apart, and the concrete shows it. Newhall and Canyon Country still have 1960s driveways, and a slab that old is usually due for replacement. Newer tracts have bare backyards waiting for a first patio. Ikon Concrete Design is family owned, in business since 1999, with a crew of eight. Here we pour driveways, patios and stamped concrete, build block walls and install drainage systems. Estimates are free.

- **County:** Los Angeles
- **Building department:** City of Santa Clarita Building & Safety, with Engineering Services for the right of way
- **Typical home age:** Median year built 1987. Newhall and Canyon Country have many 1960s homes
- **Terrain and soil:** River alluvium on the valley floor, Saugus and Mint Canyon formation hillsides
- **Common concrete work:** Driveway replacement, patios, block walls, hillside drainage, ADU slabs
- **Drive from our yard:** About 14 miles, roughly 20 minutes by the 210 and the 5
- **ZIP codes:** 91321, 91350, 91351, 91354, 91355, 91387, 91390
- **Neighborhoods:** Newhall, Saugus, Canyon Country, Valencia, Sand Canyon, Placerita Canyon, Fair Oaks Ranch, Circle J Ranch, Five Knolls, Skyline Ranch, Vista Canyon, River Village

### What the City of Santa Clarita permits and what it leaves alone

Most flatwork on your own lot needs no building permit here. The City's building code exempts driveways and walks that sit no more than 30 inches above the ground beside them, along with backyard hardscape at a house: patios, seat walls, walkways, steps set into a slope and raised planters. The list is in Section 105.2 of the code the City began enforcing on January 1, 2026.

Walls are where the limits start. A block wall or pilaster over 42 inches needs a permit. A retaining wall is exempt up to 4 feet, measured from the bottom of the footing to the top of the wall, and only up to 30 inches when it holds back a slope or carries a load such as a driveway. On ground steeper than 3 to 1 there is no exemption. Taller retaining walls need engineered plans, and we build from your engineer's stamped drawings.

### Newhall in the 1960s, Saugus in the 2010s: how old the concrete is

The age of your driveway depends on which part of town you live in. Census estimates put the median year built for the whole city at 1987. In Newhall's 91321 ZIP code it is 1978, and nearly a quarter of the homes there went up in the 1960s. Canyon Country's 91351 is close behind, with a median of 1982 and about the same share from the 1960s.

A broom finished driveway from that decade has had close to 60 summers on it. Once the panels have broken up or settled apart, patching rarely helps for long, and the usual fix is demolition and a new pour on compacted base. The 91350 ZIP code, which covers much of Saugus, is a different job. About one home in six there was built from 2010 to 2019, and tracts such as Five Knolls, Skyline Ranch and Vista Canyon are newer than most of the city. Those yards usually need a first patio or a side yard slab, not a tear-out.

### River sand on the valley floor, Saugus and Mint Canyon rock on the slopes

Santa Clarita sits on two kinds of ground, and they fail in different ways. The City's 2021 hazard mitigation plan says the loose alluvium along the Santa Clara River and its tributary washes is prone to liquefaction in an earthquake. It also says most of the mapped landslides are in the Saugus and Mint Canyon formations, which make up much of the hills. The same plan cites state geologists who placed roughly 26 percent of the Newhall quadrangle inside the landslide hazard zone.

For a homeowner that turns into rules about dirt and water. Grading more than 100 cubic yards in a hillside area goes through the City's Hillside Development Review, and on permitted grading the erosion controls have to be in by November 1 and stay until April 15. We do grading and hillside work to the approved plan, and we put in the swales, drains and pipe meant to carry runoff off the slope and away from the slab.

### Driveway aprons, sidewalks and the public right of way

The sloped apron between the street and your property line is public right of way, so that piece needs an encroachment permit from the City's Engineering Services Division. The permit conditions call for 24 hours of notice to the Public Works inspectors before work starts and an inspection of the forms one hour before the pour. Work is limited to 7:00 a.m. to 4:30 p.m., Monday through Saturday. Removed concrete goes back score line to score line, matching the existing color and finish.

Public sidewalk is handled another way. The City runs a Sidewalk and Concrete Rehabilitation Project for sidewalks and driveway approaches, and its Streets Division assesses damage that residents report at (661) 294-2500 or through the Resident Service Center. The walk from the public sidewalk to your front door is yours, and so is the side yard. We pour those as sidewalks and walkways in broom, scored or stamped finishes.

### Santa Clarita questions

**Do I need a permit to replace my driveway in Santa Clarita?**
Usually not for the part on your own lot. The City exempts driveways that are no more than 30 inches above the adjacent grade and are not part of a required accessible route. The apron in the public right of way does need an encroachment permit, and the City inspects the forms before the pour. We will tell you at the estimate what your job needs.

**How tall can a block wall be in Santa Clarita without a building permit?**
Up to 42 inches, where the Planning Division allows a wall in that spot. Block walls and pilasters taller than that need a building permit, and so does any wall that is part of a pool barrier or sits in a floodplain. Retaining walls follow a separate rule: 4 feet from the bottom of the footing, or 30 inches when the wall holds a slope. Our block walls page covers footings, steel and grout.

**How far is Ikon Concrete Design from Santa Clarita?**
About 14 miles. Our yard is at 13430 Dyer Street in Sylmar, near where the 5, the 210 and the 14 meet, and the drive to the middle of Santa Clarita takes roughly 20 minutes outside rush hour. Old Town Newhall is closer to 15 minutes and the north end of Saugus about 25. We work Monday to Saturday, 6 AM to 7 PM.

**How deep do footings have to be for an ADU or addition in Santa Clarita?**
Without a soils report, 24 inches for exterior walls and 18 inches for interior bearing walls. That is the City's rule when nobody has tested the lot for expansive soil, and the same rule calls for two #4 bars at the top and two at the bottom. A geotechnical report can change the numbers. We form and pour foundations from the approved plans.

**My lot is on a hillside in Canyon Country. What does that change?**
It changes the permit rules and usually the price. The retaining wall exemption drops from 4 feet to 30 inches when the wall holds a slope, there is no exemption on ground steeper than 3 to 1, and grading over 100 cubic yards in a hillside area goes through Hillside Development Review. Moving dirt and concrete on a slope with small equipment also adds labor. We look at access and drainage at the free estimate, so send us a message to set one up.

## Concrete contractor in Valencia, CA

URL: [ikonconcrete.com/service-areas/valencia](https://ikonconcrete.com/service-areas/valencia)

We do concrete work in Valencia, the master-planned side of Santa Clarita. From our yard in Sylmar it is the 210 to the 5 north, then off at Valencia Boulevard or McBean Parkway: about 14 miles, under 20 minutes without traffic. The villages up by Copper Hill Drive are closer to 25 minutes.

Valencia is newer and more closely regulated than the towns around it. The Newhall Land and Farming Company planned it in the 1960s, the first village opened in 1967, and homeowner associations in many villages review what owners build outside. That shapes the work we do here: stamped concrete and colored concrete chosen with the association's rules in hand, patios and pool decks fitted to graded lots, and restaining of decorative concrete that has lost its color. Ikon Concrete Design is a family owned company that has poured concrete since 1999.

- **County:** Los Angeles
- **Building department:** City of Santa Clarita Building & Safety east of the 5, Los Angeles County west of it
- **HOA design review:** Common. Many villages have an association with its own design rules
- **Typical home age:** 1967 in Old Orchard to the 2010s at the north end
- **Common concrete work:** Stamped and colored patios, restaining, pool decks, side yard slabs with drains
- **Drive from our yard:** About 14 miles, under 20 minutes by the 210 and the 5
- **ZIP codes:** 91354, 91355
- **Neighborhoods:** Old Orchard, Valencia Hills, Valencia Glen, Meadows, Summit, Northbridge, North Park, Bridgeport, Woodlands, Creekside, Belcaro, Copperhill

### Many Valencia villages put HOA review ahead of the pour

If your village has an association with design rules, its answer comes first. Valencia's residential areas are divided into villages, and homeowner associations in many of them oversee how the homes and yards are kept up. They range from a few dozen homes to more than a thousand, and each writes its own rules. Read your CC&Rs and design guidelines, or ask the management company for the application, before you settle on a pattern or a color.

State law sets the ground rules for that review. Under California Civil Code section 4765, an association that requires approval must follow a fair, reasonable and prompt written procedure, give its decision in writing, explain any denial and let you ask the board to reconsider. Expect to be asked for a plan with dimensions, the finish and the color. Most of our jobs start about two weeks after the estimate is approved, and in an HOA village that clock starts once the association says yes.

### Old Orchard opened in 1967, and the north end kept building into the 2010s

How old your concrete is depends on which end of Valencia you live in. Old Orchard I, between Lyons Avenue and the South Fork of the Santa Clara River, opened in 1967. In the 91355 ZIP code, which takes in the south and west, the median home dates from 1984 and about a third were built in the 1960s and 1970s. Close to half the homes there are townhomes, condos or apartments, so walks, steps and curbs are often association property.

The 91354 ZIP code to the north and east is younger. Its median year built is 2000, and more than three quarters of its homes went up from 1990 through 2019. A stamped patio or pool deck that went in with the house has had years of sun, and often the slab is sound while the color and sealer are gone. Then concrete staining or a resurfacing overlay is often a smaller job than a tear-out, and the pattern stays.

### Graded pads, side yard swales and the slope behind the fence

Valencia lots were graded in large tracts, and the drainage built into that grading has to keep working after concrete is added. The City's grading standard has the lot pad falling at least 2 percent toward its drainage outlet and the side yard swales falling at least 2 percent toward the street. A patio or side yard slab that fills a swale sends water toward the house or the neighbor. We set forms to hold that fall, and where a slab crosses the flow line we add a drain.

The slopes between pads have rules of their own. The same standard bars concentrated drainage from discharging onto a graded slope, and it calls for paved terrace drains, the concrete ditches that run across the taller hillsides. A slope or paseo behind your fence may be common area and not part of your lot. Find out who owns the slope and the wall before planning a block wall on that line.

### East of the 5 is the City of Santa Clarita, west of it is county

Which side of the freeway you live on decides who issues the permit. All of the incorporated part of Valencia is east of Interstate 5, and there the City of Santa Clarita's Building & Safety Division is the building department. Valencia addresses west of the 5 are in unincorporated Los Angeles County, and our Stevenson Ranch page covers how the county handles the same work.

Inside the city, a patio, a walkway or a driveway on your own lot is exempt from a building permit. A block wall is exempt up to 42 inches, and a retaining wall up to 4 feet from the bottom of its footing when the ground behind it is level. Work on the driveway apron or the curb takes a City encroachment permit. HOA approval and a City permit are separate, and having one does not give you the other. We will tell you at the estimate which approvals your job is likely to need.

### Valencia questions

**Do I need HOA approval for a new patio or driveway in Valencia?**
If your village has an association with design review, yes, and you need it before work starts. California Civil Code section 4765 requires the association to decide under a written procedure with deadlines and to put its decision in writing. Send the application before you schedule the pour, because our start date follows the approval.

**Is Valencia in the City of Santa Clarita or in Los Angeles County for permits?**
Both, depending on the address. The incorporated part of Valencia lies east of Interstate 5 and uses the City of Santa Clarita's Building & Safety Division. Valencia addresses west of the freeway are in unincorporated Los Angeles County. We confirm which one applies before we price a job.

**How long is the drive from your yard to Valencia?**
Under 20 minutes to the middle of Valencia when traffic is light. It is about 14 miles from 13430 Dyer Street in Sylmar by the 210 and the 5. The north end near Copper Hill Drive is about 18 miles and 25 minutes.

**My stamped patio in Valencia has faded. Does it have to be torn out?**
Usually not, if the slab is solid. Color and sealer usually wear before the slab itself does, so a patio from the 1990s or 2000s can often be cleaned, restained and resealed. When the surface itself is flaking or pitted, a resurfacing overlay is the next step. Our concrete staining page explains the process.

**Can I pour concrete over the swale in my side yard?**
Not in a way that stops the water. The City's grading standard has side swales falling at least 2 percent toward the street, and that path is how your lot drains. A side yard slab can be poured with the same fall or with a drain set into it. We look at where the water goes at the free estimate, so get in touch before you fix the layout.

## Concrete contractor in Castaic, CA

URL: [ikonconcrete.com/service-areas/castaic](https://ikonconcrete.com/service-areas/castaic)

We do concrete work in Castaic, at the north end of the Santa Clarita Valley. From our yard in Sylmar it is a straight run: the 210 to the 5 north, about 20 miles and under half an hour without traffic. Hasley Canyon, west of the freeway, adds a few minutes.

Castaic is unincorporated, so there is no city hall. Permits come from Los Angeles County, and the county's Castaic Area Community Standards District adds rules meant to keep the place rural. Most homes are single-family houses on hillside tracts or larger lots, built in the 1980s or the 2000s. That makes for retaining walls, driveways, drainage and grading work, along with patios. We are a family owned company with a crew of eight, in business since 1999, and our estimates are free.

- **County:** Los Angeles (unincorporated)
- **Building department:** Los Angeles County Public Works, Building and Safety Division
- **Typical home age:** Median year built 1992. Most homes are from the 1980s or the 2000s
- **Terrain and soil:** Hillside tracts, canyons and creek bottoms below Castaic Lake
- **Common concrete work:** Retaining walls, driveway replacement, drainage, grading, patios
- **Drive from our yard:** About 20 miles, under 30 minutes up the 5
- **ZIP codes:** 91384
- **Neighborhoods:** Hasley Canyon, Hillcrest, Paradise Ranch, Castaic Junction, Northlake, Sloan Canyon, Romero Canyon, Charlie Canyon, Tapia Canyon, Violin Canyon

### Los Angeles County issues the permits, and Castaic has standards of its own

Building permits here come from the Building and Safety Division of Los Angeles County Public Works. The county exempts a few kinds of work we do often: walks and driveways no more than 30 inches above grade, masonry or concrete fence walls up to 6 feet that sit back from the public way at least as far as they are tall, and retaining walls up to 4 feet measured from the bottom of the footing, unless the wall carries a surcharge.

Zoning is a separate check. The county code caps fences and walls at 3 1/2 feet in a required front yard and 6 feet in the side and rear yards. The Castaic Area Community Standards District adds that a fence along a public or private road has to be split rail, open wood, rock, block or iron. A block wall meets that rule. Chain link qualifies only when it is landscaped along its whole length.

### Ridgelines, 50 percent slopes and colored concrete on the hillsides

The county keeps development off the highest and steepest ground here. Under the Castaic standards, nothing may be built or graded within 50 feet of the crest of a primary significant ridgeline or 25 feet of a secondary one, and grading on slopes of 50 percent or steeper is prohibited with few exceptions. In the county's hillside management areas, grading has to follow the contours so the finished slopes look rounded.

One rule is about concrete itself. Terrace drains, the paved ditches that cross cut and fill slopes, must be poured in colored concrete that blends with the soil, or be hidden behind berms. Integral color goes into the mix at the plant, so the tone is picked before the truck is ordered. On a hillside lot we also look at where each wall sends its water. A retaining wall needs a drain behind it and an outlet that is not the slope below.

### Most Castaic homes date from the 1980s or the 2000s

Castaic was built in two main waves. Census estimates put the median year built at 1992, with about 39 percent of homes from the 1980s and 35 percent from 2000 to 2009. Very little is older than 1970. More than eight homes in ten are detached single-family houses, and about as many are owner occupied.

A 1980s driveway here is about 40 years old, old enough for panels to have broken or settled. We replace those as full driveways with the base recompacted, because a slab is only as good as what is under it. Owners in the 2000s tracts are more often adding than replacing: a patio, a walk down the side of the house, or a parking pad for a boat or a trailer. A pad like that carries more weight than a patio, so its thickness and steel are sized for the load.

### Streets without curbs change how a driveway meets the road

Parts of Castaic have no curbs, gutters or sidewalks on purpose. In residential tracts where at least three quarters of the lots are larger than 15,000 square feet, the Castaic standards prohibit them unless they are needed for safety. They call for an inverted shoulder instead, a paved edge that dips to carry runoff where a gutter would be. A driveway there meets the road at that shoulder and cannot block the flow.

Work in the county's road right of way, a driveway approach or a curb drain for example, needs a road construction permit from Public Works, applied for on the county's EPIC-LA site. The county says most simple road permits are processed within two weeks. The same standards require the channels of Castaic, Hasley Canyon, Violin Canyon and other named creeks to keep soft bottoms. So on the lot we plan where roof and slope water goes before we set a form.

### Castaic questions

**Who issues building permits in Castaic?**
Los Angeles County does, because Castaic is unincorporated. Building permits go through the Building and Safety Division of Public Works, and zoning questions, including the Castaic Area Community Standards District, go to the Department of Regional Planning. Work in the road right of way takes a separate road permit from Public Works.

**Do I need a permit for a block wall or a retaining wall in Castaic?**
Not always. The county exempts a masonry or concrete fence wall up to 6 feet when it is set back from the public way by at least its own height, and a retaining wall up to 4 feet from the bottom of the footing when it carries no surcharge. Zoning still limits a front yard wall to 3 1/2 feet. We will tell you at the estimate whether your wall needs a permit.

**How long does it take you to get to Castaic?**
Under half an hour in light traffic. Castaic is about 20 miles from our yard at 13430 Dyer Street in Sylmar, nearly all of it on the 5. Hasley Canyon and the lots west of the freeway are closer to 35 minutes.

**Can I grade a building pad on a steep lot in Castaic?**
Not on the steepest ground. The Castaic standards prohibit grading on slopes of 50 percent or more, with narrow exceptions, and keep development 50 feet back from primary ridgelines. On gentler ground the county exempts only small cuts from a grading permit, 50 cubic yards or less and under 2 feet deep. We do grading and hillside work from the approved plan.

**My street in Castaic has no curb. Can I still pour a new driveway?**
Yes. On streets built with an inverted shoulder, the driveway ties into the paved edge and has to let runoff pass along the road. The part inside the county right of way needs a road construction permit. Send us the address and we will look at the approach when we come out for the estimate.

## Concrete contractor in Stevenson Ranch, CA

URL: [ikonconcrete.com/service-areas/stevenson-ranch](https://ikonconcrete.com/service-areas/stevenson-ranch)

We do concrete work in Stevenson Ranch, the hillside community on the west side of the 5, across the freeway from Santa Clarita. From our yard in Sylmar we take the 210 to the 5 north and come in on Pico Canyon Road or Stevenson Ranch Parkway. It is about 14 miles and close to 20 minutes with no traffic.

Stevenson Ranch looks like part of Santa Clarita, but it is unincorporated, so Los Angeles County issues the permits. It was laid out in the Santa Susana foothills under one master plan, and many homes sit on a graded pad with a slope above or below. The work that fits is pool decks, stamped concrete patios, retaining walls that win back flat yard, and the drainage that leads water away from those slopes. Ikon Concrete Design is family owned, with 27 years in the trade. Estimates cost nothing.

- **County:** Los Angeles (unincorporated)
- **Building department:** Los Angeles County Public Works, Building and Safety. Not the City of Santa Clarita
- **Typical home age:** Median year built 1999. About 8 in 10 homes date from 1990 to 2009
- **Terrain and soil:** Graded pads and slopes in the Santa Susana foothills, about 1,500 feet up
- **Common concrete work:** Pool decks, stamped patios, retaining walls, hardscape, yard drains
- **Drive from our yard:** About 14 miles, close to 20 minutes by the 210 and the 5
- **ZIP codes:** 91381
- **Neighborhoods:** Westridge, Southern Oaks, Sunset Pointe, Pico Canyon, Stevenson Ranch Parkway, Poe Parkway, Hemingway Avenue, The Old Road

### A master plan in the Santa Susana foothills, built from 1986 on

Stevenson Ranch is younger than almost everything east of the freeway. Los Angeles County approved the first phase, 4,378 homes on 3,057 acres, in late 1985, and Dale Poe's company broke ground the next year. About 1,500 homes were up by 1996. Census estimates now put the median year built at 1999, and close to eight homes in ten date from 1990 to 2009.

The community sits at about 1,500 feet, some 400 feet higher than Valencia across the freeway. Building in foothills meant cutting pads and leaving slopes between them, so a typical yard is flat for a short distance and then drops or climbs. Most original flatwork is 15 to 35 years old. The job is often reworking a builder's plain patio into a hardscape plan with a pool deck, seat walls and steps, and sometimes replacing old slabs that have broken or settled.

### Retaining walls on pad and slope lots: the county's numbers

A wall is how slope becomes usable yard, and the county has a few numbers to know. No building permit is needed for a retaining wall up to 4 feet, measured from the bottom of the footing to the top of the wall. That exemption ends when the wall supports a surcharge, and a slope that keeps rising behind the wall is a surcharge. So a wall cut into a rising slope usually needs a permit and engineered plans, and we build from your engineer's stamped drawings.

The zoning code adds limits of its own. A retaining wall inside a required yard may not be taller than 6 feet. Where the wall holds fill, its height counts toward the height allowed for a fence on top, though an open safety fence of 3 1/2 feet may still be added. Reshaping the slope around a wall is grading, and the county exempts only small cuts of 50 cubic yards or less.

### Two approvals: your association first, then Los Angeles County

Concrete work here can need two separate yes answers. If your tract has a homeowners association with architectural rules, ask its management company for the application before you choose a finish. California law requires the association to decide in good faith and in writing, and its decision may not conflict with the building code. If the answer is no, you are entitled to have the board reconsider at an open meeting.

The county comes second. It exempts walks and driveways that are no more than 30 inches above grade from a building permit. Walls, pool work and anything in the street are different. Your mail may say Stevenson Ranch or Santa Clarita, but the permit counter is Los Angeles County Building and Safety, not Santa Clarita City Hall. Most of our jobs start about two weeks after the estimate is approved, so send the association's application in early.

### Getting water from the patio to the curb without crossing a slope

On a terraced lot the wrong place for water is over the edge of the pad. Runoff that spills down a slope cuts into it, so patio and pool deck water gets collected and piped. We set area drains and channel drains in the flatwork, pitch the slab to them, and run solid pipe to the front of the lot. Pool decks are drained the same way.

The last few feet belong to the county. A drain that comes out through the curb is in the road right of way, and cutting or rebuilding a curb, gutter or parkway drain takes a road construction permit from Public Works, filed on its EPIC-LA site. Stevenson Ranch also has about 1,000 acres set aside as parks and open space. The slope behind your fence may be part of it or association common area, so find out who owns it before planning a wall or a drain there.

### Stevenson Ranch questions

**Is Stevenson Ranch in the City of Santa Clarita?**
No. Stevenson Ranch is an unincorporated community west of the 5, so building permits come from Los Angeles County Public Works and not from the City. The Postal Service lists its ZIP code, 91381, under both Stevenson Ranch and Santa Clarita, which is where the confusion starts. We confirm the jurisdiction before pricing any job that needs a permit.

**Do I need HOA approval for a pool deck or patio in Stevenson Ranch?**
If your tract has an association with architectural review, yes. Get the application from the management company and turn in the layout, finish and color before any work is scheduled. Approval from the association does not replace a county permit where one is required.

**How tall can a backyard retaining wall be in Stevenson Ranch?**
Up to 6 feet inside a required yard under the county zoning code. A building permit is required once the wall is over 4 feet from the bottom of its footing, or at any height when it supports a surcharge such as a rising slope. Our retaining walls page explains footings, steel and the drain behind the wall.

**How far is Stevenson Ranch from your yard?**
About 14 miles. From 13430 Dyer Street in Sylmar it is the 210 to the 5 north, and the drive runs close to 20 minutes outside commute hours. Our hours are 6 AM to 7 PM, Monday through Saturday.

**What drives the cost of concrete work on a hillside lot in Stevenson Ranch?**
Access, walls and water. A backyard reached only through a side gate means concrete is pumped or wheeled in, and a wall that holds a slope adds engineering, a permit and inspections. Drains, demolition of old flatwork and decorative finishes each add to the number. Ours comes from a free on-site estimate, so contact us to set one up.

## Concrete contractor in Sylmar, CA

URL: [ikonconcrete.com/service-areas/sylmar](https://ikonconcrete.com/service-areas/sylmar)

We do concrete work in Sylmar, and it is the shortest drive we make. Our yard is at 13430 Dyer Street, so most Sylmar addresses are 5 to 10 minutes away on Polk Street or Hubbard Street, with no freeway involved. Ikon Concrete Design is family owned, has been in the concrete trade since 1999 and runs a crew of eight.

Sylmar is the northernmost neighborhood in the City of Los Angeles, and the ground climbs about 600 feet from San Fernando Road to the top of Hubbard Street. That slope decides much of what we build here: driveways that have to shed water the right way, block walls around horse lots, drainage systems for yards that catch runoff from the hills, and retaining walls where a pad was cut into the grade.

- **County:** Los Angeles
- **Building department:** City of Los Angeles: LADBS (Van Nuys office) and the Bureau of Engineering
- **Typical home age:** Median year built 1977 in ZIP 91342, with tracts from the 1950s through the 1980s
- **Terrain and soil:** About 1,100 to 1,700 feet in elevation, rising toward the San Gabriel Mountains. State fault zones cross the community
- **Common concrete work:** Driveways, block walls, yard drainage, retaining walls, foundations
- **Drive from our yard:** 5 to 10 minutes. The yard is at 13430 Dyer Street
- **ZIP codes:** 91342
- **Neighborhoods:** Olive View, Oakridge, Rancho Cascades, Carey Ranch, Stetson Ranch, El Cariso

### From olive groves to horse lots and 1980s tracts

Sylmar is named for the olive groves planted here in the 1890s. By 1894 as many as 1,700 acres were in olive trees, and by 1906 the property was being called the largest olive grove in the world. Houses replaced the trees in stages. Census figures for ZIP code 91342 put the median home at 1977, with about 17 percent of homes built in the 1950s, 15 percent in the 1960s and 23 percent in the 1980s.

For concrete, that spread means two kinds of jobs. A driveway poured in the 1950s or 1960s has had sixty or seventy years of cars, tree roots and earthquakes, and when one has broken up and heaved we usually recommend removal and a new pour over a patch. On the horse lots, which the city protects with an equinekeeping district in its Sylmar plan, the work runs to long driveways, slabs for outbuildings and perimeter walls.

### The 1971 earthquake and the fault zones on the state map

The San Fernando earthquake struck at 6:00 in the morning on February 9, 1971, at magnitude 6.6. The ground broke at the surface for about 6 miles, from south of Sylmar east to Little Tujunga Canyon, and the main treatment building at Olive View Hospital came close to collapse. California answered with the Alquist-Priolo Act, signed in December 1972, which maps active faults and keeps new buildings for people off them.

Those zones still cross Sylmar on the California Geological Survey map. Inside one, a building for human occupancy generally has to sit at least 50 feet from an active fault trace, and a state-licensed geologist investigates the site before most new buildings are permitted. State law exempts some single houses, and a city may be stricter than the state. If you are planning a foundation for an addition or an ADU, look up your address on the state map and ask LADBS early. We build foundations from your engineer's stamped plans.

### Foothill lots: slope, runoff and the 2008 Sayre Fire

North of the 210 the streets tilt up toward the San Gabriel Mountains, and storm water comes down them fast. Fire is part of the foothill picture too. The Sayre Fire started here on the night of November 14, 2008, burned about 11,200 acres and destroyed 489 residences, 480 of them mobile homes at Oakridge. The Hurst Fire broke out near Sylmar in January 2025. A slope that has lost its brush sheds water and mud quickly in the rains that follow.

The city's rule for that water is short. Drainage that a wall concentrates or redirects has to reach the public street through a device that will not erode, and none of it may cross onto the next property. On a sloped Sylmar lot that usually means catch basins and drain pipe run out to the curb, laid out before any concrete is formed. Where the pad itself holds water, grading comes first.

### Sylmar permits, horse property walls and how to start

Sylmar has no town hall of its own. Permits come from City of Los Angeles departments: Building and Safety (LADBS), whose Valley office is at 6262 Van Nuys Boulevard, for walls, foundations and grading, and the Bureau of Engineering for a driveway approach or sidewalk, because those sit in the public right of way. On horse property zoned A or RA, a front yard wall or fence may stand 6 feet tall, against 3.5 feet in the ordinary residential zones. Any masonry or concrete wall over 3.5 feet needs a building permit.

We will tell you at the estimate whether your job needs a permit. Estimates are free and done at your property, and most jobs start about two weeks after you approve one. We work Monday to Saturday, 6 AM to 7 PM. Send us a message or call (818) 464-5763.

### Sylmar questions

**Is Ikon Concrete Design based in Sylmar?**
Yes. Our yard is at 13430 Dyer Street, Sylmar, CA 91342. Customers do not come to the yard, so estimates happen at your property, and they are free. We also work next door in San Fernando and Granada Hills.

**Who issues permits for concrete work in Sylmar?**
The City of Los Angeles does, because Sylmar is a city neighborhood and not its own municipality. LADBS issues building and grading permits for walls, foundations and earthwork. The Bureau of Engineering issues the permit for a driveway approach, curb or sidewalk in the public right of way.

**Is my Sylmar property in an earthquake fault zone?**
It may be. State Alquist-Priolo fault zones, first issued for this area in 1976 after the 1971 San Fernando earthquake, run through several parts of Sylmar. You can check an address on the California Geological Survey's online zone map. A zone mainly affects new buildings people will occupy, which generally must stay 50 feet from an active fault trace.

**How tall can a front wall be on a horse property in Sylmar?**
On lots zoned A or RA, Los Angeles allows a front yard fence or wall up to 6 feet. In R zones the front yard limit is 3.5 feet. Side and rear yards allow 8 feet where the lot is at least 40 feet wide and outside the Hillside Area, and 6 feet otherwise, so check your zone before settling on a height.

**Where does the water from a yard drain have to go in Sylmar?**
To the street. Los Angeles does not allow drainage to be sent across a neighboring lot, and water that a wall or graded pad collects has to reach the public street without eroding anything on the way. An outlet through the curb is work in the public right of way, which the Bureau of Engineering permits. We lay out the drain lines before the concrete is formed.

## Concrete contractor in San Fernando, CA

URL: [ikonconcrete.com/service-areas/san-fernando](https://ikonconcrete.com/service-areas/san-fernando)

We do concrete work in the City of San Fernando, the town next door to our Sylmar yard. The drive is about 4 miles down Hubbard Street and Maclay Avenue, roughly 10 minutes with no freeway, so it is one of the closest places we work.

San Fernando is its own city, incorporated on August 31, 1911, and surrounded on every side by Los Angeles. It stayed independent because it had its own groundwater when the rest of the Valley joined Los Angeles for aqueduct water, and it still runs its own water system. For concrete, the practical point is that permits here come from San Fernando City Hall, under San Fernando's own rules for block walls, driveways and work at the curb.

- **County:** Los Angeles
- **Building department:** City of San Fernando Community Development (Building and Safety), 117 Macneil Street. Public Works for the right of way
- **Typical home age:** Median year built 1956. About two thirds of homes predate 1960
- **Terrain and soil:** Valley floor lots. State fault zone in the north corner, liquefaction zone on the west side
- **Common concrete work:** Driveway and walk replacement, finished block walls, patio slabs, ADU foundations
- **Drive from our yard:** About 4 miles, roughly 10 minutes on Hubbard Street and Maclay Avenue
- **ZIP codes:** 91340
- **Neighborhoods:** Downtown San Fernando, Maclay Avenue, Brand Boulevard, Las Palmas Park, Layne Park, Pioneer Park, Recreation Park

### Permits come from 117 Macneil Street, not from Los Angeles

Two counters at San Fernando City Hall cover most concrete jobs. The Community Development Department, which includes Building and Safety, reviews plans and inspects work on private property. Its public counter is open Monday through Thursday, 8:30 AM to 12:30 PM, and the city steers applicants to its online permit counter. Public Works issues the construction permit for anything in the public right of way: a driveway approach, sidewalk, curb and gutter or curb drain.

The Public Works permit requires liability insurance that names the City of San Fernando as additional insured, and construction plans get a ten day review before a permit is issued. A Los Angeles permit or handout carries no weight inside the city limits, even though Los Angeles streets are less than a mile away in every direction. We will tell you at the estimate which counter your job involves, if either.

### Front walls stop at 4 feet, and plain gray block is out

San Fernando's walls and fences application spells out the rules for its R-1, R-2 and R-3 zones, and they are tighter than the Los Angeles rules a few blocks away. Every masonry wall needs a building permit. A block wall has to be finished on both faces, with stucco or split-face block for example, and plain block is allowed only under colored stucco or another approved coating. Chain link is not permitted. We finish walls in stucco, split-face block or stone to suit.

- Front yard, and the street side of a corner lot: 4 feet maximum
- Wall and fence combined in a front yard: the solid wall stops at 2 feet and the part above must be 50 percent open
- Side and rear yards: 6 feet maximum, measured from existing finished grade
- A fence on top of a retaining wall: the two heights are added together
- A wall on a shared property line: signed consent from every affected neighbor

### Homes from before 1960 on compact lots

San Fernando is one of the oldest towns in the Valley, and the housing shows it. Census estimates put the median home at 1956. One home in five was built before 1940, about 13 percent in the 1940s and 31 percent in the 1950s, so close to two thirds of the city's 6,600 homes are older than 1960. Only about 5 percent have gone up since 2000.

Old houses on compact lots shape the concrete work. A slab that came with a 1950s house has carried cars for seventy years, and much of it has been patched more than once. The way into a back yard may be a side gate, so demolition and the pour get planned around wheelbarrows or a pump hose in place of a truck chute. Common requests are a new driveway and front walk, a patio slab behind the house, and a foundation for an ADU, which the city reviews under its own site plan application.

### The fault zone and liquefaction zone inside the city limits

The 1971 earthquake carries San Fernando's name, and the state hazard maps drawn since then still mark the city. By our count from the California Geological Survey's zone data, about a sixth of the land inside the city limits lies in an Alquist-Priolo earthquake fault zone, mainly the north corner toward Sylmar and a strip on the west edge. A smaller area on the west side, around Las Palmas Park, is mapped as a liquefaction zone, meaning shallow groundwater in loose sand or silt that can turn fluid in strong shaking.

Those maps are aimed at buildings people occupy, not at a driveway or a garden wall. Inside a zone, the state has cities require a site investigation by a licensed geologist or civil engineer before most new development is permitted. If your project is a foundation, we build it from the engineer's stamped drawings.

### San Fernando questions

**Is the City of San Fernando part of Los Angeles for building permits?**
No. San Fernando has been its own city since 1911 and issues its own permits through the Community Development Department at City Hall, 117 Macneil Street, (818) 898-1227. Los Angeles Building and Safety has no role here. Homes just over the line in Sylmar or Pacoima are the ones that go through Los Angeles.

**How tall can a front yard wall be in San Fernando?**
Four feet, measured from existing finished grade, in the R-1, R-2 and R-3 zones. If you combine a wall with a fence, the solid wall portion can be no more than 2 feet and the fence above it has to be 50 percent open. Side and rear yard walls can go to 6 feet.

**Do I need my neighbor's consent for a block wall on the property line in San Fernando?**
Yes. The city's Common Property Line Fence/Wall Agreement requires consent from all affected property owners, with the footing set an equal distance on each side of the line. The form states that it is not a survey and does not establish the legal property line. If the line itself is in doubt, that is a question for a licensed surveyor or civil engineer.

**Who permits a new driveway approach or sidewalk in San Fernando?**
San Fernando Public Works, at City Hall, (818) 898-1222. Its construction permit covers building or repairing a driveway approach, sidewalk, curb and gutter, curb ramp or curb drain in the public right of way. The permit requires liability insurance naming the city as additional insured.

**How far is Ikon Concrete Design from San Fernando?**
About 4 miles. Our yard is on Dyer Street in Sylmar, roughly 10 minutes up Maclay Avenue and Hubbard Street. The estimate costs nothing and happens at your address, and work usually begins about two weeks after you say yes. Message us or call (818) 464-5763 to set one up.

## Concrete contractor in Granada Hills, CA

URL: [ikonconcrete.com/service-areas/granada-hills](https://ikonconcrete.com/service-areas/granada-hills)

We do concrete work in Granada Hills, about 9 miles from our Sylmar yard. We take the 210 to the 118 west and come off at Balboa Boulevard, which is about 15 minutes when the freeway is moving.

Granada Hills sits at the foot of the Santa Susana Mountains. South of the 118 the lots are flat and the streets run on a grid. North of Rinaldi Street they start to climb. That split shows up in the work: driveways and patios for ranch houses on the flat, and retaining walls and drainage on the hillside streets. Ikon Concrete Design is family owned, with a crew of eight and a California contractor's license first issued in 1999.

- **County:** Los Angeles
- **Building department:** City of Los Angeles (LADBS), plus City Planning review inside the Balboa Highlands overlay
- **Typical home age:** Median year built 1963 in ZIP 91344. About 6 in 10 homes date from the 1950s and 1960s
- **Terrain and soil:** Flat south of the 118, Santa Susana foothills to the north, where the state maps fault, liquefaction and landslide zones
- **Common concrete work:** Driveway replacement, patios, retaining walls, hillside drainage, staining and resurfacing
- **Drive from our yard:** About 9 miles, 15 minutes by the 210 and the 118
- **ZIP codes:** 91344
- **Neighborhoods:** Knollwood, Balboa Highlands, Granada Hills North, Granada Hills South, Bee Canyon, White Oak Avenue

### Ranch houses from the 1950s and 1960s, and flatwork the same age

Granada Hills began in 1926 as a subdivision called Granada, on land that had been a dairy and orchards, and citrus trees still stand in many yards. Most of the houses came later. Census figures for ZIP code 91344 give a median build year of 1963: about 38 percent of homes went up in the 1950s, 25 percent in the 1960s and 17 percent in the 1970s. Barely 5 percent are newer than 2000.

If the driveway, front walk and patio are original to a house like that, they are 55 to 75 years old. Where the slab is still sound we can resurface or stain it. Where it has broken up or lifted, it usually comes out and we pour new. The big street trees play a part. The deodar cedars along White Oak Avenue are a city Historic-Cultural Monument, and when a street tree's roots lift the public sidewalk, the Bureau of Engineering's permit for that repair carries no fee.

### Balboa Highlands, the Eichler tract with a preservation overlay

Joseph Eichler built Balboa Highlands between 1962 and 1964 with architects A. Quincy Jones, Frederick Emmons and Claude Oakland, and the City Council made it a Historic Preservation Overlay Zone in 2010. The neighborhood describes itself as the first postwar neighborhood in the San Fernando Valley to gain historic district status. Exterior projects there are screened by City Planning's Office of Historic Resources, starting with the HPOZ Initial Screening Checklist and guided by a preservation plan adopted in December 2010.

So the order of work changes for an Eichler owner. Before a driveway, front walk or street-facing wall is redesigned, take the idea to the Office of Historic Resources, then call us. Mid-century houses like these suit plain concrete: a light broom or smooth trowel finish, integral color kept quiet, and joints laid out square to the house. We build to whatever the city approves.

### Hillside streets north of Rinaldi and the 4 foot wall rule

North of Rinaldi Street the neighborhood climbs toward O'Melveny Park, the second largest park in Los Angeles. Back yards up there often end at a bank. The Department of Building and Safety lets you build a retaining wall without a permit only when it is 4 feet or less from the bottom of the footing to the top, the ground behind it is level, and the slope below is no steeper than 1 foot of rise in 5.

A wall holding back a sloped bank, or a slough wall at the toe of a slope, needs a permit even at that height. The city's standard detail sets the footing 12 inches into natural ground, with gravel behind the wall and weep holes every 6 feet to let water out. Stacked, mortarless block is not accepted unless the product has a city research report. Taller walls get engineered, and we build those from the stamped plans.

### What the state hazard maps show north of the 118

Granada Hills has been through both big Valley earthquakes. In 1971 a slide took out part of the Lower Van Norman Dam, at the reservoir complex on the neighborhood's edge, and about 80,000 people were evacuated for four days while the water was drawn down. The California Geological Survey now maps three kinds of zones here: earthquake fault zones, liquefaction zones and landslide zones.

When we checked the state's zone data against local landmarks, nearly everything mapped fell north of the 118. Bee Canyon Park sits in both a fault zone and a liquefaction zone, O'Melveny Park in a fault zone and a landslide zone, and Lisette Street in Balboa Highlands in a liquefaction zone. South of the freeway, around Chatsworth Street, Petit Park and the high school, we found none. For a foundation or an ADU slab inside a zone, the city can ask for a geotechnical report before it issues the permit, so look up your address first.

### Granada Hills questions

**How far is Granada Hills from your yard, and how soon can you start?**
About 9 miles, or 15 minutes by the 210 and the 118 without traffic. We come out to measure and price the job at no charge. Once you approve the estimate, most jobs start about two weeks later, and we work Monday to Saturday.

**My house is in Balboa Highlands. Who do I ask before changing the driveway or a front wall?**
City Planning's Office of Historic Resources. Balboa Highlands is a Historic Preservation Overlay Zone, and project reviews there begin with the city's HPOZ Initial Screening Checklist. Do that before you settle on a design or order materials. Once you know what the city will accept, send us the details and we will price it.

**Is a retaining wall's height measured from the ground or from the footing?**
From the bottom of the footing. The Los Angeles bulletin that allows a wall of 4 feet or less without a permit measures to the top of the wall from the underside of the footing, and the footing has to sit at least 12 inches into natural ground. A wall at the limit therefore holds back less than 4 feet of soil.

**How tall can a back yard block wall be on a hillside lot in Granada Hills?**
Six feet, if the lot is inside the city's designated Hillside Area. On flat lots at least 40 feet wide the side and rear yard limit is 8 feet. Any masonry or concrete wall over 3.5 feet needs a building permit, and the city's ZIMAS parcel report shows whether your lot carries the hillside designation. We build block walls to either limit.

**What does a new concrete driveway cost in Granada Hills?**
It depends on the size, whether an old slab has to be broken out and hauled off, the base and grading under it, the slope of the lot, the steel and the finish, plus the city permit if the apron at the street is part of the job. Two driveways on the same block can price very differently. Our number comes from a free estimate at your house.

## Concrete contractor in Porter Ranch, CA

URL: [ikonconcrete.com/service-areas/porter-ranch](https://ikonconcrete.com/service-areas/porter-ranch)

We do concrete work in Porter Ranch, about 13 miles west of our Sylmar yard. The route is the 210 to the 118, then off at Reseda Boulevard or Porter Ranch Drive, and it takes about 20 minutes outside rush hour.

Porter Ranch is the newest of the Valley neighborhoods we work in. The first tracts went up around 1960 as part of Northridge, the city annexed the area in 1965, and building has kept moving up the slopes of the Santa Susana Mountains since, much of it in gated communities with homeowner associations. Graded pads, design review and wind decide what gets built: retaining walls, pool decks, stamped concrete patios and the drainage that moves water away from a cut slope.

- **County:** Los Angeles
- **Building department:** City of Los Angeles (LADBS and City Planning), after your HOA's design review
- **Typical home age:** Median year built 1982 in ZIP 91326. About a third of homes were built since 2000
- **Terrain and soil:** Graded hillside pads below the Santa Susana Mountains, about 1,280 feet. State landslide zones on the north and west edges
- **Common concrete work:** Retaining walls, pool decks, stamped patios, drainage, hardscape for new yards
- **Drive from our yard:** About 13 miles, 20 minutes by the 210 and the 118
- **ZIP codes:** 91326
- **Neighborhoods:** Renaissance, Sorrento, Westcliffe, The Canyons, Hillcrest, Porter Ridge

### A neighborhood still being built, one tract at a time

Census figures for ZIP code 91326 show how long the building has run. The median home dates from 1982, but the spread is wide: about 17 percent of homes are from the 1960s, 23 percent from the 1970s, 17 percent from the 2000s and 15 percent from 2010 on. Developer Nathan Shapell drove much of it, the city adopted the Porter Ranch specific plan in 1989, and Toll Brothers has been building the newest collections at Westcliffe.

An older tract house and a 2021 house near the top of the hill need different things. The older one may have flatwork as old as the house. The new one often comes with a builder's yard: a graded pad, a slope and a property line wall, waiting for a patio, walks, a pool surround and steps. We do both, and we would rather see a new yard before the pool is dug, so drains and footings go in ahead of the slabs that cover them.

### HOA design review comes before the permit

The Council District 12 office describes Porter Ranch as mostly gated communities of single-family homes. Renaissance, Sorrento, Westcliffe, The Canyons and Hillcrest each sit behind their own gate with their own rules. If your association's governing documents require approval for a physical change to your lot, California Civil Code section 4765 says the association must give you a fair, reasonable and expeditious procedure and answer in writing.

So the association sees the design before the city does. Committees typically ask for a site plan, finishes and colors, and wall heights and materials. We can supply the parts that describe our work: dimensions, the stamp pattern and color by name, wall details and a drainage layout. Then we schedule the job for after the approval letter, because tearing out an unapproved patio costs far more than waiting for a committee meeting.

### Cut slopes, wall limits and where the water goes

Much of Porter Ranch was graded out of hillside, and Los Angeles treats walls on such lots more strictly than on the Valley floor. Since March 2005 a city ordinance has limited both the height and the number of retaining walls on a lot in a Hillside Area, and going past those limits takes a conditional use permit from City Planning. Side and rear yard fence walls top out at 6 feet in the Hillside Area.

The state's seismic hazard map adds landslide zones along the north edge under the mountains and down the west side toward Browns Canyon. There, a tall wall or a new structure usually brings a geotechnical engineer into the job, and we build from the stamped plans. Every wall also needs a way to pass water: gravel behind it, weep openings through it, and a pipe or lined swale that carries the water to the street instead of over the slope.

### Santa Ana wind and the pour schedule

Santa Ana winds blow hard at this end of the Valley. During the wind event of December 4 and 5, 2017, the National Weather Service logged a 47 mile per hour gust at Porter Ranch and 66 at its Granada Hills station next door. On October 10, 2019, the Saddleridge Fire forced the whole community to evacuate.

Wind is part of planning a pour up here. When a strong wind is in the forecast we may shift the start time or move the pour to another day, and every job's schedule is set with the weather on that lot in mind. The same wind leans on a tall block wall. The city's standard detail for a 6 foot wall puts vertical rebar every 48 inches in grouted cells over a continuous footing.

### Porter Ranch questions

**Do I need HOA approval for a new patio, wall or driveway in Porter Ranch?**
If your home is in one of the gated associations and its governing documents require approval for changes to the lot, yes. State law (Civil Code 4765) requires the association to run a fair, reasonable and expeditious review and to give its decision in writing. Get that approval before any concrete is ordered, and keep the letter.

**How many retaining walls can I build on a Porter Ranch lot?**
The city caps both the number and the height of retaining walls on lots in a Hillside Area, under an ordinance in effect since March 9, 2005. Going beyond the cap means applying to City Planning for a conditional use permit. Ask LADBS what applies to your parcel before you design a terraced yard.

**Is my Porter Ranch lot in a landslide zone?**
Some are. When we sampled the state's seismic hazard zone data across Porter Ranch, about one point in seven fell in an earthquake-induced landslide zone, mostly on the north and west edges. Most of the built-up middle did not. The California Geological Survey's online map will show your address.

**My new-construction yard is bare dirt. What gets built first?**
Grading and drainage first, then retaining and property line walls, then the pool if there is one, and the flatwork last. Drain lines and footings have to be in the ground before a slab covers them. We lay out the whole yard at the estimate, even if you plan to build it in stages.

**How long does it take you to reach Porter Ranch?**
About 20 minutes from Sylmar by the 210 and the 118 when traffic is light. There is no charge for the estimate. After you approve it, the usual wait for a start date is about two weeks. We cover the neighboring hills too, in Chatsworth and Granada Hills, and you can reach us through the contact page.

## Concrete contractor in Northridge, CA

URL: [ikonconcrete.com/service-areas/northridge](https://ikonconcrete.com/service-areas/northridge)

We do concrete work in Northridge, about 13 miles from our Sylmar yard. We run the 210 and the 118 to the 405, take it south to Nordhoff Street and head west, about 20 minutes in light traffic.

Northridge was called Zelzah, then North Los Angeles, and took its present name in 1938. Farmland turned to housing after the war, the college that became Cal State Northridge opened in 1956, and the lots stayed flat and generous. The work follows from that: block walls on long property lines, pool decks, driveways wide enough for two cars, and slabs for the ADUs going in behind older houses. We are family owned, and estimates are free.

- **County:** Los Angeles
- **Building department:** City of Los Angeles Department of Building and Safety. Bureau of Engineering for work at the curb
- **Typical home age:** Median year built 1970 in ZIPs 91324 and 91325. About a quarter of homes date from the 1950s
- **Terrain and soil:** Flat Valley floor. Soil is presumed expansive by the city. State liquefaction zone in the southwest corner
- **Common concrete work:** Block walls, pool decks, patios, driveways, ADU slabs
- **Drive from our yard:** About 13 miles, 20 minutes by the 210, 118 and 405
- **ZIP codes:** 91324, 91325, 91330
- **Neighborhoods:** Sherwood Forest, Northridge East, Northridge West, Northridge South, CSUN campus area, Reseda Boulevard corridor

### 4:31 AM on January 17, 1994

The Northridge earthquake struck at 4:31 in the morning on January 17, 1994, at magnitude 6.7. The epicenter was in neighboring Reseda, but the name and much of the damage landed here. Sixteen people died when the Northridge Meadows apartments collapsed. All 58 buildings at Cal State Northridge were damaged and Parking Structure C came down, and the Northridge Fashion Center lost parking structures too.

For anyone who owns a house here, 1994 is a dividing line. Concrete and masonry older than that went through shaking that topped 1 g at several Valley stations. When we look at an older slab, footing or wall in Northridge, we check for what that leaves behind: a wall leaning out of plumb, mortar joints opening in a stair-step line, a slab broken into planes that no longer meet. Work that shows those signs usually gets taken out and rebuilt with steel in it, not patched.

### Block walls: what Los Angeles requires inside them

From the street, a reinforced block wall and a hollow one look the same. What holds a wall up when the ground moves is the steel, the grout and the footing. The Los Angeles standard detail for a 6 inch block wall up to 6 feet tall calls for number 4 rebar (half inch) standing every 48 inches in cells grouted solid, horizontal bars at mid height and at the top, and two continuous bars in the footing. An inspector sees the open trench with the steel in it, and comes back before grout.

Northridge permits are City of Los Angeles permits, issued by Building and Safety, and any masonry wall over 3.5 feet needs one. Lots here are mostly flat and wide, which is where the city allows side and rear walls up to 8 feet. In Sherwood Forest, the large-lot pocket between Lindley Avenue and Balboa Boulevard that the City Council recognized in 2012, a property line can run a long way.

### Pool decks and patios for 97 degree afternoons

A flat, deep Northridge lot has room for a pool, and the slab around one works harder than any other on the property: wet feet, pool chemicals, furniture and full sun. The average August high at the Woodland Hills station, a few miles to the southwest, is about 97 degrees, and the EPA notes that conventional pavement can reach 152 degrees at midday.

That is why we steer pool owners toward light colors and real texture. A broom finish, exposed aggregate or a stamped texture gives bare feet something to grip, and a light integral color stays cooler underfoot than charcoal. The deck should fall away from the water and away from the house, so splash and rain run to a drain. We also pour pool surrounds as separate pads with turf or rock between them, and matching patios under a cover.

### Valley floor soil, the liquefaction zone and ADU slabs

The state's seismic hazard map puts the southwest corner of Northridge, including Vanalden Park and the Metrolink station, in a liquefaction zone. Cal State Northridge, the Fashion Center and Sherwood Forest fall outside it. Separately, Building and Safety treats all soil in the city as expansive, meaning it swells wet and shrinks dry, unless an approved soils report proves otherwise.

Both facts bear on a new foundation. The city's prescriptive design for expansive soil calls for exterior footings 24 inches deep with four number 4 bars, and a slab at least 3.5 inches thick with number 4 bars 16 inches apart each way. Census figures put the median Northridge home at 1970, with about a quarter built in the 1950s, and a wide lot behind a house that age is where an ADU usually goes. The slab under it is foundation work, not a patio pour, and we build it from the engineer's stamped plans.

### Northridge questions

**My block wall was built before the 1994 earthquake. Is it safe?**
You cannot tell from the outside, because rebar and grout are hidden in the cells. Warning signs are a lean, stair-step gaps opening along the mortar joints, or a wall that rocks when pushed at the top. If you see any of those, have it looked at before the next storm or shake. A new wall built to the current Los Angeles detail has vertical steel every 48 inches in grouted cells.

**Is Northridge in a liquefaction zone?**
Part of it is. The California Geological Survey maps a liquefaction zone over the southwest corner of the neighborhood, and our check of that data placed Vanalden Park and the Northridge Metrolink station inside it. The campus, the Fashion Center and Sherwood Forest tested outside. Look up your own address on the state's map before planning a foundation.

**What concrete finish stays cooler and safer around a pool?**
Light colors and a textured surface. Dark stains and smooth, glossy sealers get hotter and more slippery, while a broom finish, exposed aggregate or a light stamped texture with grit in the sealer has more grip than a smooth surface. See our pool deck and stamped concrete pages for the options.

**Do I need a soils report for an ADU foundation in Northridge?**
Not always. Los Angeles assumes the soil is expansive unless a soils report shows otherwise, and it publishes a prescriptive footing and slab design for that case. Your designer or engineer decides whether to use it or to commission a report, and a lot inside the liquefaction zone can be asked for more. We pour what the approved plans show.

**How do you get to Northridge, and when could you start?**
Our crew comes down from Sylmar on the 118 and the 405, usually about 20 minutes. Pricing a job means walking it with you, which we do at no charge. Start dates run about two weeks from the day you approve the estimate. We also work in Porter Ranch and North Hills on either side.

## Concrete contractor in North Hills, CA

URL: [ikonconcrete.com/service-areas/north-hills](https://ikonconcrete.com/service-areas/north-hills)

We do concrete work in North Hills, about 10 miles from our Sylmar yard. We take the 210 and the 118 to the 405 south and get off at Nordhoff Street, a drive of about 15 minutes.

North Hills is the level middle of the north Valley, between Bull Creek on the west and the Pacoima Wash on the east, with the 405 running through it. It was sold as Mission Acres in 1914, became Sepulveda in 1927 and took its current name in 1991. Nearly a third of its homes date from the 1950s, so the usual job here is replacement: driveways, sidewalks and walkways, block walls on the property line, and the removal of slabs that have reached the end of their life.

- **County:** Los Angeles
- **Building department:** City of Los Angeles: Bureau of Engineering for aprons and sidewalks, LADBS for walls and structures
- **Typical home age:** Median year built 1968 in ZIP 91343. About a third of homes date from the 1950s
- **Terrain and soil:** Level Valley floor near 840 feet, between Bull Creek and the Pacoima Wash. No state fault or liquefaction zones found
- **Common concrete work:** Driveway and apron replacement, sidewalk repair, block walls, slab removal
- **Drive from our yard:** About 10 miles, 15 minutes by the 210, 118 and 405
- **ZIP codes:** 91343
- **Neighborhoods:** North Hills East, North Hills West, Mission Acres, Sepulveda, Sepulveda Boulevard corridor, VA campus area

### From one acre farm plots to 1950s tracts

Developers began advertising Mission Acres in 1914, a year after the Los Angeles Aqueduct opened, as one acre farm plots with irrigation water. Residents renamed the community Sepulveda in 1927, after the boulevard that crosses it. In 1991 the west side petitioned for a new name, the east side followed that November, and the whole community became North Hills, even though the ground is level and sits about 840 feet above sea level.

The acre plots were cut into tracts after the war. Census figures for ZIP code 91343 put the median home at 1968, with about 32 percent built in the 1950s and 18 percent in the 1960s, and apartment buildings arriving from the 1960s on. About half the homes are owner occupied and half rented, so the person calling about an old, broken driveway or a worn parking slab that needs resurfacing may be a landlord or property manager as easily as a homeowner.

### Old driveways, and the apron that belongs to the street

A driveway poured with a 1950s house has been in service for about seventy years. Once it has broken into pieces that rock under a tire, patching wastes money, so we break it out, rebuild the base and pour new. How thick the new slab is and how much steel goes into it depend on the lot and on what will park there, and we go over both at the estimate.

The last few feet are a separate matter. The apron between the sidewalk and the street is public right of way, so replacing or widening it takes an A permit from the City of Los Angeles Bureau of Engineering, not a permit from Building and Safety. In the residential zones the city holds an apron to between 10 and 18 feet wide, measured along the curb. At the estimate we show you where your slab stops and the city's begins.

### Sidewalks lifted by tree roots: the law and the city program

California law makes the owner of a lot responsible for keeping the sidewalk in front of it in safe condition. Los Angeles added a 30 year sidewalk repair program on top of that, including a rebate for owners who hire their own contractor. The rebate has a cap per lot, and when we last read the city's page, new applications were going onto a waitlist for lack of funding.

Three details matter. Under the rebate program the contractor must hold an A, C-8, C-12 or C-61/D-06 license, and ours is C-8. Where street tree roots caused the damage, the Bureau of Engineering's permit carries no fee, but trimming those roots takes a separate permit from the Bureau of Street Services. And the finished walk has to meet accessibility rules, which allow no more than a quarter inch of vertical offset between panels unless the edge is beveled.

### Level lots, shared block walls and where rain goes

North Hills is about as level as the Valley gets. When we tested the state's earthquake hazard zone data across the neighborhood, we found no fault zone and no liquefaction zone, though the 1994 earthquake still shook it hard enough to close the Sepulveda VA hospital for a time. The everyday problem on level ground is water. A patio or driveway with no fall holds a puddle against the house, so we set a slab to run toward the street or to a drain.

Where a property line wall has started to lean, the law has a say in who pays. California Civil Code section 841 presumes that neighbors share equally the reasonable cost of a boundary fence or wall, and the owner who wants the work gives the other 30 days written notice. On lots at least 40 feet wide, Los Angeles allows side and rear walls up to 8 feet.

### North Hills questions

**Who is responsible for the broken sidewalk in front of my North Hills home?**
Under California Streets and Highways Code section 5610, the owner of the fronting lot is. Los Angeles runs its own repair program and offers a rebate, up to a set amount per lot, for owners who do the work, but the city's page said new rebate applications were being waitlisted when we checked in November 2026. If a street tree did the lifting, the city's permit for the repair has no fee.

**Can I widen my driveway apron in North Hills?**
Within limits. In the residential zones Los Angeles sets a minimum apron width of 10 feet and a maximum of 18 feet, measured along the curb, and the work needs an A permit from the Bureau of Engineering. If widening would change the gutter line, the city requires a B permit instead.

**Is North Hills in an earthquake fault or liquefaction zone?**
Not according to our check of the California Geological Survey's zone data, which found neither kind of zone inside North Hills. Neighboring Granada Hills and Northridge both have mapped zones. That does not mean the ground here will not shake, so new footings and walls still get the steel the city's details call for. You can confirm your own address on the state's online map.

**My neighbor and I share a leaning block wall. Who pays to replace it?**
California Civil Code section 841 presumes that adjoining owners share the reasonable cost equally unless they have agreed otherwise in writing. The owner who wants the work has to give the other 30 days written notice. We can walk the wall with both of you and give one price for the job.

**How long is the drive from your yard to North Hills?**
About 15 minutes. It is roughly 10 miles from Dyer Street in Sylmar by the 210, the 118 and the 405 to Nordhoff Street. We do not charge to come out and measure, and a typical start date is about two weeks after you accept the estimate. Call (818) 464-5763 or use the contact form.

## Concrete contractor in Chatsworth, CA

URL: [ikonconcrete.com/service-areas/chatsworth](https://ikonconcrete.com/service-areas/chatsworth)

We do concrete work in Chatsworth, the northwest corner of the Valley and about 16 miles from our Sylmar yard. The 210 and the 118 carry us nearly the whole way, and we come off at De Soto Avenue or Topanga Canyon Boulevard in about 25 minutes.

The name Chatsworth first appeared on a subdivision map in 1888, and the place still has more open ground than most of Los Angeles: horse property, larger lots near the hills, and a working industrial district on the flat. The Simi Hills rise on the west and the Santa Susana Mountains on the north. Here we pour long driveways, build retaining walls, take on grading and hillside work, and form walks, ramps and curbs for commercial sites.

- **County:** Los Angeles
- **Building department:** City of Los Angeles (LADBS). Los Angeles County for the unincorporated pockets of Twin Lakes and Chatsworth Lake Manor
- **Typical home age:** Median year built 1974 in ZIP 91311. About half of homes date from the 1960s and 1970s
- **Terrain and soil:** Valley floor near 980 feet, ringed by sandstone hills. State liquefaction zone across the center, landslide zones in the hills
- **Common concrete work:** Long driveways, retaining walls, grading and drainage, commercial walks, ramps and curbs
- **Drive from our yard:** About 16 miles, 25 minutes by the 210 and the 118
- **ZIP codes:** 91311
- **Neighborhoods:** Stoney Point, Chatsworth Park, Chatsworth Oaks, Mason Park, Santa Susana Pass, Twin Lakes, Chatsworth Lake Manor

### Horse property and 1970s tracts at the west end of the Valley

Chatsworth was known for thoroughbred horse ranches, and the Council District 12 office still lists an annual Day of the Horse here. The city's community plan sets aside horsekeeping areas in the north and west of the plan area, and Los Angeles regulates them through its K equinekeeping districts, which among other things fix how far an animal enclosure must stand from habitable rooms. That distance belongs on the site plan before any slab, wall or drain is laid out.

The tract houses are younger than in most of the Valley. Census figures for ZIP code 91311 put the median home at 1974, with about 31 percent built in the 1970s, 19 percent in the 1960s and 17 percent in the 1980s. On the larger lots, the driveway is often the biggest slab on the property, which is why owners here ask about stamped borders, colored bands and saw-cut patterns to break up a long run.

### Sandstone at Stoney Point, and under the shovel

Stoney Point, the 81 acre outcrop at the north end of Topanga Canyon Boulevard, is Los Angeles Historic-Cultural Monument number 132. Its rock is Chatsworth Formation sandstone, laid down in the Upper Cretaceous more than 65 million years ago, and the same stone runs through the hills around the neighborhood. Close to those hills, digging a footing or a drain trench can turn up boulders or bedrock, which means a breaker on the excavator, more hauling and sometimes a redesigned footing.

Earthwork has its own permit. Los Angeles requires a grading permit for cut, fill, import or export of soil, with a short list of exceptions. The one that covers small yard jobs is an excavation less than 2 feet deep, or one that leaves no cut slope both taller than 5 feet and steeper than 1 in 2. The exception is lost once the cut passes 50 cubic yards or changes how the lot drains.

### The old reservoir, the Valley floor and a liquefaction zone

Chatsworth Reservoir was built in 1918 as part of the Los Angeles Aqueduct system and taken out of service in 1969. The basin is now the Chatsworth Nature Preserve, and the low ground around it tells you where water wants to go. On the state's seismic hazard map, a liquefaction zone covers much of central Chatsworth: our check of the data placed the corner of Devonshire Street and Topanga Canyon Boulevard, the train station, Chatsworth Park South and the preserve inside it. Stoney Point and Mason Park tested outside.

For flatwork, that mostly means taking drainage seriously. Runoff from the hills heads for the low ground, and a slab laid dead flat will pond. We set the slope before the forms are staked and add catch basins and drain lines where the yard has no natural fall. For a building foundation in the zone, the city can ask for a geotechnical report.

### Business parks, ramps and curbs

Chatsworth is also a place where things get made. Employers based here include Lamps Plus, Natel Engineering and the National Notary Association, and a business park runs on concrete: loading aprons, walks, curbs and accessible ramps. Our license covers both C-8 Concrete and B General Building, and we pour commercial flatwork as well as residential.

The numbers on a commercial job are fixed by code. An accessible ramp can rise no faster than 1 inch per foot, with a cross slope of no more than 1 in 48, and California asks for 48 inches of clear width. At the street, a driveway approach, sidewalk or curb goes in under a Bureau of Engineering A permit, and anything that changes the gutter line or the grade of the sidewalk moves up to a B permit. Our working hours are Monday to Saturday, 6 AM to 7 PM.

### Chatsworth questions

**Is all of Chatsworth inside the City of Los Angeles?**
No. Most of it is a Los Angeles neighborhood, where Building and Safety issues permits. Twin Lakes, north of the 118, and Chatsworth Lake Manor, on the west side, are unincorporated, so permits there come from Los Angeles County. The city's ZIMAS parcel lookup will tell you which side of the line your lot is on.

**Do I need a grading permit to level part of my Chatsworth lot?**
Often, yes. Los Angeles exempts only small excavations, under 2 feet deep or without a cut slope over 5 feet high and steeper than 1 in 2, and even those need a permit once the cut exceeds 50 cubic yards or alters the drainage pattern. A pad for a barn, arena or ADU can easily go past that. We will tell you at the estimate whether your job is likely to need one.

**What happens if you hit rock while digging a footing?**
We plan for it in Chatsworth, because sandstone can sit close to the surface near the hills. Loose boulders come out with the excavator. Solid rock is broken out to the depth the plans call for, or the engineer revises the footing to bear on it. Before we start, we tell you how rock would change the price.

**Do you pour concrete for commercial and industrial properties in Chatsworth?**
Yes. We form and pour sidewalks, accessible ramps, curbs, pads and slabs for owners, property managers and general contractors. Ikon Concrete Design holds California license 770901 in the C-8 Concrete and B General Building classifications. Send the plans or a site address through the contact page and we will price it.

**How far is Chatsworth from Ikon's yard in Sylmar?**
About 16 miles, close to 25 minutes on the 210 and the 118 when the freeway is clear. Site visits and estimates are free, most jobs start about two weeks after approval, and we also cover Porter Ranch and, over the pass, Simi Valley.

## Concrete contractor in Woodland Hills, CA

URL: [ikonconcrete.com/service-areas/woodland-hills](https://ikonconcrete.com/service-areas/woodland-hills)

We do concrete work in Woodland Hills, about 23 miles from our yard in Sylmar by the 118, the 405 and the 101 west. That is half an hour when traffic is light. Woodland Hills is a Los Angeles neighborhood, so building permits come from the Department of Building and Safety (LADBS), which has a counter at 6262 Van Nuys Boulevard, and anything in the street belongs to the Bureau of Engineering.

Ventura Boulevard splits the neighborhood in two for our purposes. South of it the streets climb into the Santa Monica Mountains, and almost every job involves a slope, a wall or a drain. North of it the lots are flat and wide, and the work is driveways, patios and pool decks. Both halves share the hottest summers in Los Angeles County, which changes how and when concrete gets poured.

- **County:** Los Angeles
- **Building department:** City of Los Angeles: LADBS for the lot, Bureau of Engineering for the street
- **Typical home age:** Mostly 1950s to 1970s; median 1967 in 91364 and 1975 in 91367
- **Terrain and soil:** Santa Monica Mountains slopes south of Ventura Boulevard, flat valley floor north
- **Common concrete work:** Driveways, pool decks, patios, hillside retaining walls and drainage
- **Drive from our yard:** About 23 miles, around 30 minutes by the 118, 405 and 101
- **ZIP codes:** 91364, 91367
- **Neighborhoods:** Warner Center, Walnut Acres, Girard Tract, South of the Boulevard, Carlton Terrace, College Acres, Vista de Oro, Natoma Estates, Woodland Hills Country Club

### Pouring concrete where it has hit 121 degrees

Woodland Hills holds the official all-time record high for Los Angeles County. The National Weather Service logged 121 degrees at Pierce College on September 6, 2020, beating the 119 recorded there in July 2006. An ordinary August afternoon runs in the upper 90s.

Heat speeds up how fast concrete sets, so in summer we usually schedule pours for early morning, and the prep, finishing and curing are planned around that day's heat. Every job here is a little different, and so is the plan for it. Color matters too. On a pool deck a lighter finish stays cooler under bare feet than a dark one.

### South of Ventura Boulevard: the Girard tract and hillside rules

The hills south of the boulevard were subdivided in the 1920s as the town of Girard. The city's Girard Tract Specific Plan describes what that left behind: lots averaging 3,500 square feet, laid out for weekend cottages, on streets it calls narrow and substandard for a hillside. On streets like that a ready-mix truck often cannot reach the forms, so the concrete is pumped from wherever the truck can park.

Slope work here follows the city's hillside rules. LADBS allows a retaining wall without a permit only up to 4 feet, measured from the bottom of the footing, with level ground behind it, and not where the slope below is steeper than 1 in 5. Lots along the Mulholland Drive corridor can also fall inside the Mulholland Scenic Parkway Specific Plan, which has its own design review board. We build retaining walls and do hillside grading from your engineer's stamped plans.

### North of the boulevard: flat lots, older slabs and block walls

The flat side was built out mostly from the 1950s through the 1970s. Census estimates put the median home in ZIP 91367, which takes in Warner Center and Walnut Acres, at 1975, and in 91364 at 1967. A driveway or pool deck poured with the house is 50 to 70 years old now. Walnut Acres is zoned RA, where the city's minimum lot is 17,500 square feet, so driveways run long and there is room for a stamped patio or an ADU slab.

Property line walls are the other common job on flat lots. In Los Angeles a masonry or concrete wall over 3 and a half feet tall needs a building permit. Side and rear yard walls can go to 8 feet where the lot is at least 40 feet wide and outside the Hillside Area, and 6 feet otherwise. Our block wall page explains the footing and the steel.

### Aprons, curbs and sidewalks belong to the Bureau of Engineering

The piece of driveway between the street and your property line is public right of way, and work on it takes an A permit from the Bureau of Engineering, not LADBS. City code sets the apron at 10 to 18 feet wide for a house lot, measured along the curb, and anything wider needs an approved deviation. The same class of permit covers sidewalk, curb and gutter repair.

One rule surprises people in the hills. Where a street is paved but has no curb, the Bureau does not permit a concrete approach. It treats an asphalt approach there as a temporary improvement that needs a recorded waiver and a revocable permit. We look at the curb before we price a driveway. On your side of the line, the slab's thickness and steel are set for what will park on it, whether that is a car, a truck or an RV.

### Woodland Hills questions

**Who issues permits for concrete work in Woodland Hills?**
The City of Los Angeles does, through two offices. LADBS handles walls, foundations and grading on your lot. The Bureau of Engineering handles the driveway apron, sidewalk and curb under an A permit. We will tell you at the estimate whether your job needs either one.

**Do I need a permit for a retaining wall on a hillside lot in Woodland Hills?**
Often yes. The city's no-permit wall is limited to 4 feet from the bottom of the footing to the top, with level backfill, on ground where the slope below is no steeper than 20 percent. A wall holding a sloped bank, a taller wall or a wall on a steep lot needs a permit and engineered plans. Stacked block systems also need a current city research report or an approved evaluation report.

**Can you pour concrete in Woodland Hills in the middle of summer?**
Yes, with the schedule moved up. Summer pours usually go in early in the morning, and we plan the base prep, the finishing and the curing around the heat expected that day.

**My street south of Ventura Boulevard is narrow. Can you still get concrete to the house?**
Usually, yes. Where a ready-mix truck cannot reach the forms, the concrete is pumped through a hose from the nearest spot the truck can park. Tell us about gates, steps and parking limits when you contact us, because access is one of the main things that moves the price on a hillside job.

**How wide can a driveway approach be in Woodland Hills?**
For a single-family lot the city's range is 10 to 18 feet, measured along the curb. A wider apron needs a deviation approved through the Bureau of Engineering. If your street is an Avenue or Boulevard on the city's mobility plan, the Department of Transportation has to sign off on the approach as well.

## Concrete contractor in Calabasas, CA

URL: [ikonconcrete.com/service-areas/calabasas](https://ikonconcrete.com/service-areas/calabasas)

We do concrete work in Calabasas, about 25 miles from our yard in Sylmar. The drive is the 118 to the 405 south and the 101 west, roughly 35 minutes when the freeways are moving. Calabasas became a city in 1991 and runs its own Building and Safety and Planning divisions out of City Hall at 100 Civic Center Way, so the rules here are not the Los Angeles rules that apply next door in Woodland Hills.

Ikon Concrete Design is family owned and has held California license 770901 since 1999, with a crew of eight. The work this city tends to need is driveways on sloped lots, retaining walls, yard drainage and stamped concrete around pools and patios, and we do all of it. Estimates are free.

- **County:** Los Angeles
- **Building department:** City of Calabasas Building and Safety Division, 100 Civic Center Way
- **Typical home age:** Median year built 1984; about a third from the 1980s
- **Terrain and soil:** Santa Monica Mountains foothills; the city lists expansive soil with high sulfates
- **Common concrete work:** Hillside driveways, terraced retaining walls, drainage, pool decks, stamped patios
- **Drive from our yard:** About 25 miles, roughly 35 minutes by the 118, 405 and 101
- **ZIP codes:** 91302, 91301
- **Neighborhoods:** Old Town Calabasas, Calabasas Park Estates, The Oaks, Calabasas Hills, Westridge, Mulholland Heights, Mulwood, Calabasas Highlands, Park Moderne, Saratoga Hills, Mont Calabasas, Mountain Park

### What needs a permit at Calabasas City Hall

Small flatwork usually does not need a building permit here, but walls often do. The city's Work Exempt from Permits handout, dated February 2026, exempts sidewalks and driveways that sit no more than 30 inches above the ground next to them. It also exempts retaining walls up to 4 feet, measured from the bottom of the footing to the top of the wall, unless the wall carries a surcharge such as a slope or a driveway above it. A masonry wall that holds back no soil needs a permit once it stands more than 3 feet above finished grade.

Planning is a separate counter. Its own guidance says almost any exterior change needs a planning permit, and it names garden walls over 42 inches. Work in the public right of way, which on a public street includes the driveway approach, needs an encroachment permit from Public Works. We will tell you at the estimate which of these your job touches.

### Hillside lots, wall heights and driveway grades

Calabasas treats any site with a natural slope over 10 percent as hillside, and its development code limits how much of that slope can be cut or walled off. A single retaining wall may not be taller than 6 feet without the director's approval. A wall facing outward in the front setback tops out at 4 feet. Tiered walls must sit at least 4 feet apart, and the code wants tall walls broken into landscaped terraces instead of one flat face.

Driveways on hillside lots have numbers too: at least 16 feet wide, or 20 feet where the grade is over 10 percent, with an average slope of no more than 17 percent and no stretch steeper than 20 percent. That is why grading and hillside work here starts with the slope numbers and, on anything tall, an engineer's plans. We build walls from those stamped drawings.

### Oak trees decide where a trench or a slab can go

If an oak stands near the work, the city's oak tree rules apply before any digging. The municipal code sets a protected zone around every oak. It starts 5 feet outside the drip line, which is the outer edge of the canopy, and runs in to the trunk. It is never less than 15 feet from the trunk, and 50 feet for a heritage oak. Excavating or paving inside that zone counts as altering the tree and needs an oak tree permit.

There is an exception that helps with replacement work. Replacing or repairing an existing improvement inside the protected zone, an old walk or driveway for example, is exempt as long as the tree is not affected. So we look at the oaks first on a Calabasas estimate. A drain line can often be routed around a protected zone, and a new patio can be shaped to stay outside it.

### Expansive soil, sulfates and 1980s concrete

Calabasas tells designers to plan for difficult ground. The Building and Safety design factors list the local soil as expansive with high sulfates, and say to check with a geotechnical engineer or the soils report. Expansive clay swells when it gets wet and shrinks as it dries. On flatwork here the compacted base, the steel and where the water goes are set for the site, and they matter as much as the finish. On engineered work the plans set the mix and we order what they call for.

Age is the other factor. Census estimates put the median Calabasas home at 1984, with about a third of the housing built in the 1980s and another third in the 1960s and 1970s. Original driveways, pool decks and block walls from those tracts are now 40 to 60 years old. When the slab is sound, resurfacing or staining is an option. When it has heaved, replacement is.

### Calabasas questions

**Do I need a permit for a retaining wall in Calabasas?**
It depends on the height. The city's handout exempts retaining walls up to 4 feet, measured from the bottom of the footing to the top of the wall, unless the wall supports a surcharge. Taller walls need a building permit and engineered plans, and the development code caps a single retaining wall at 6 feet unless the director approves more. We build retaining walls from your engineer's stamped drawings.

**My home is in a gated Calabasas community. Does the HOA have to approve concrete work?**
Usually yes, when the work changes what can be seen from the street or a neighbor's lot. The Oaks, Calabasas Park Estates and many other neighborhoods here are gated communities with their own associations. Where the governing documents require approval of a physical change, California Civil Code 4765 requires the association to follow a fair procedure and decide in writing. That approval is separate from the city's permits, so ask your committee what it wants to see before the finish and color are picked.

**What is the soil like in Calabasas, and why does it matter for a driveway?**
The city's Building and Safety division lists local soil as expansive with high sulfates. Expansive soil moves with the seasons, so a driveway needs a compacted base, steel and control joints, and water has to be kept from soaking in along its edges. For a foundation or a tall wall, the soils report sets the footing depth and the mix.

**Can you pour a new patio or driveway near an oak tree in Calabasas?**
Often yes, with limits. Calabasas protects the ground from 5 feet outside an oak's drip line in to the trunk, and never less than 15 feet from the trunk. New excavation or paving inside that zone needs an oak tree permit, while replacing an existing improvement is exempt if the tree is not affected. Check with the Planning Division before the layout is fixed, and we will work the slab around what it allows.

**How far is Calabasas from your yard, and when can you start?**
About 35 minutes from Sylmar without traffic, by the 118, the 405 and the 101. We work Monday to Saturday, 6 AM to 7 PM. Most jobs start about two weeks after the estimate is approved, and city or HOA review can add time before that. Send us a message or call (818) 464-5763 for a free estimate.

## Concrete contractor in Hidden Hills, CA

URL: [ikonconcrete.com/service-areas/hidden-hills](https://ikonconcrete.com/service-areas/hidden-hills)

We do concrete work in Hidden Hills, about 26 miles from our yard in Sylmar. We take the 118 to the 405, then the 101 west to the Long Valley Road gate, around 35 minutes without traffic. Hidden Hills is a gated city of about 1,700 people that incorporated in 1961, laid out in the 1950s by landscape architect A. E. Hanson with bridle trails, white three-rail fences and no sidewalks.

Two approvals stand behind every job inside the gates. The Hidden Hills Community Association's Architectural Committee reviews the design, and the city's Building and Safety department lists association approval among the documents it wants with a permit application. We build driveways, patios, pool decks and walls here, and we read the association's standards before we draw anything. Ikon is a family owned company with a crew of eight, and the estimate costs nothing.

- **County:** Los Angeles
- **Building department:** City of Hidden Hills Building and Safety, after Community Association approval
- **Typical home age:** Median year built 1970; half from the 1950s and 1960s
- **Terrain and soil:** Rolling Simi Hills lots with bridle trails and no curbs or sidewalks
- **Common concrete work:** Estate driveways, parkway aprons, patios, pool decks, retaining walls, drainage
- **Drive from our yard:** About 26 miles, roughly 35 minutes by the 118, 405 and 101
- **ZIP codes:** 91302
- **Neighborhoods:** Long Valley Road, Round Meadow Road, Jed Smith Road, Paradise Valley Road, Lasher Road, Ashley Ridge, Spring Valley Road

### What the Architectural Standards say about driveways

Every driveway material needs committee approval, including the replacement of an existing driveway. Under the association's Architectural Standards a new driveway has to be brick, concrete or pavers, and old asphalt may be replaced with asphalt only in the same location. So stamped, colored or stained concrete is a choice you make for the part of the drive on your own lot, with a sample in front of the committee.

The parkway is different. That is the strip between the paved road and the road easement line, and where a driveway crosses it the standards call for natural concrete with a heavy broom finish in a circular pattern. No color, glaze or waterproofing is allowed there. The crossing can be no wider than 20 feet, curbs are prohibited in the parkway, and the approach may not damage parkway trees.

### The 35 percent hardscape limit on an estate lot

Hidden Hills caps hardscape at 35 percent of the net lot area, and the definition is broad. It counts the footprint of the house and every accessory structure, the pool and spa, all paved surfaces and patios, and anything used for parking or vehicle access, whatever the finish. A decomposed granite parking spur counts. Decomposed granite walkways and access roads to horse facilities do not.

On a lot with a long private drive, a motor court and a pool, that number fills up quickly. Before we price a new patio or widen a driveway we ask for the lot's current hardscape total, because the committee will. Where the count is tight, concrete pads with planted joints, a narrower drive or a decomposed granite path to the barn can keep a project inside the limit. Our hardscape page shows that kind of layout.

### Walls, pads and grading limits

The association approves every wall, whether structural, retaining or decorative. Its standards hold a retaining wall that extends a building pad to 3 feet and do not allow walls stepped down a downhill slope. A wall that holds back an uphill slope can be up to 10 feet. Walls are generally kept 25 feet from the property lines, which rules out the property line block wall that is routine in the rest of the Valley.

Dirt is watched as closely. Import or export of soil is considered only when geological, soils and civil engineering reports call for it to fix drainage or another defect, and then no more than 1,000 cubic yards. Cut and fill quantities have to be on the plans. We build retaining walls and do grading from the engineer's stamped drawings once the committee and the city have signed off.

### Drainage on roads with no curbs

Without curbs and gutters, the driveway is part of the storm drain system here. The standards say a driveway should carry the bulk of the lot's water to the street, with proper drainage where it meets the road so that it does not dam or divert the flow along the road shoulder. Runoff may not escape along the edges of the parkway apron, and a parkway should cross slope no more than 2 percent.

Hidden Hills homes are older than the gates suggest. Census estimates put the median at 1970, with half built in the 1950s and 1960s, so many original drives and patios were poured before these rules were written. When one is replaced, the apron and the drainage usually have to be brought up to the current standard. Drain design is a specialty of ours, and the details are on our drainage systems page.

### Hidden Hills questions

**Do I need HOA approval to replace a driveway in Hidden Hills?**
Yes. The Hidden Hills Community Association's Architectural Standards say all driveway materials need committee approval, whether the driveway is new or a replacement. New driveways must be brick, concrete or pavers. Get that approval before you schedule the work.

**Can my driveway be stamped or colored where it meets the road?**
Not in the parkway. Where a driveway crosses the parkway easement, the standards require natural concrete with a heavy broom finish in a circular pattern, with no color, glaze or waterproofing. Decorative finishes belong on the part of the driveway inside your lot, subject to the committee.

**How much of a Hidden Hills lot can be paved?**
Hardscape is limited to 35 percent of the net lot area. That figure includes the house and accessory building footprints, the pool, patios and every surface used for parking or driving. Ask the association or your designer for your current total before planning a new patio or motor court.

**Can I build a block wall on my property line in Hidden Hills?**
Usually not. Perimeter fencing is the white three-rail fence, 48 inches high, and the standards keep walls 25 feet back from the property lines. The committee may allow block or chain link in place of three-rail where there is a severe slope or at the city boundary.

**Who issues building permits in Hidden Hills?**
The City of Hidden Hills Building and Safety department does, and its permit center lists homeowners association approval documents among the items to submit. We will tell you at the estimate whether your job needs a permit. To start, send us a message or call (818) 464-5763.

## Concrete contractor in Encino, CA

URL: [ikonconcrete.com/service-areas/encino](https://ikonconcrete.com/service-areas/encino)

We do concrete work in Encino, about 17 miles from our yard in Sylmar. The route is the 118 to the 405 south, off at the 101, and it takes around 25 minutes without traffic. Encino is a neighborhood of the City of Los Angeles on the north slope of the Santa Monica Mountains, running down to the Sepulveda Basin, so permits go through the city and not a local city hall.

The name comes from the Spanish for oak, and the trees are still the first thing we look at on a job here, because the city protects them. After that it is slope, soil and water. We pour driveways, pool decks and patios, build foundations for additions and ADUs, and put in the drainage that hillside and flat lots both need. Ikon is family owned, with a crew of eight, and estimates are free.

- **County:** Los Angeles
- **Building department:** City of Los Angeles LADBS; Urban Forestry Division for protected trees
- **Typical home age:** Median year built 1962 in 91436 and 1969 in 91316
- **Terrain and soil:** North slope of the Santa Monica Mountains down to the Sepulveda Basin; soil treated as expansive
- **Common concrete work:** Long driveways, pool decks, addition and ADU foundations, drainage, retaining walls
- **Drive from our yard:** About 17 miles, roughly 25 minutes by the 118 and the 405
- **ZIP codes:** 91316, 91436
- **Neighborhoods:** Amestoy Estates, Encino Village, Royal Oaks, Encino Hills, Lake Encino, Encino Woods, Clark Gable Estates

### Oaks come first on an Encino job

Encino is named for its oaks. The Tongva village here was Siutcanga, the place of the oaks, and Los Encinos State Historic Park keeps the name. Los Angeles protects native oaks, along with Southern California black walnut, western sycamore and California bay, once the trunk measures 4 inches in diameter at four and a half feet above the ground. Removing or relocating one takes a permit from the Board of Public Works through the Urban Forestry Division.

What matters for concrete is how the city defines removal. It includes any act that kills the tree by damaging its roots with equipment, or by changing the natural grade with excavation or fill inside the drip line. A new slab, footing or trench under an oak's canopy is a tree question before it is a concrete question. Root pruning a street tree, the usual cause of a lifted sidewalk or driveway apron, needs its own Urban Forestry permit.

### Grading limits on the hillside lots

South of Ventura Boulevard the lots climb toward Mulholland Drive, and digging is regulated closely. Under the Los Angeles Building Code a grading permit is needed unless the excavation is less than 2 feet deep, or does not leave a cut slope that is both over 5 feet high and steeper than 1 vertical in 2 horizontal. Either way the exemption ends once the cut passes 50 cubic yards or changes how the lot drains.

On top of that, the Baseline Hillside Ordinance caps the total amount of earth that can be moved on a lot. It leaves out up to 500 cubic yards of cut and fill for the driveway to the required parking, and remedial grading that an approved geotechnical report calls for. Streets near the ridge also fall under the Mulholland Scenic Parkway Specific Plan and its design review board. Our part is the grading, the walls and the concrete, built to the approved plans.

### Mid-century houses on soil the city treats as expansive

Most of Encino was built in the two decades after the war. Census estimates put the median home at 1962 in ZIP 91436 and 1969 in 91316, and more than a third of the homes in 91436 date from the 1950s. That is the age when original driveways, walks and patio slabs have broken up or settled, and when owners add a room or an ADU.

Los Angeles treats all soil in the city as expansive unless an approved soils report proves otherwise. Without a report, the city's standard for new footings is 24 inches deep at exterior walls and 18 inches inside, each with four half-inch bars. The same standard calls for a slab on grade at least 3 and a half inches thick with half-inch rebar every 16 inches each way, set over sand and a moisture barrier or over 4 inches of gravel. We form and pour the foundation your approved plans show.

### Pools, long driveways and where the rain goes

A lot of Encino backyards have a pool, and on the estate lots the driveway can be the biggest slab on the property. Both put a lot of hard surface on the ground, and the rain that lands on it has to go somewhere the city accepts. LADBS requires roof and site drainage from new work to reach the street, a natural watercourse or an approved drainage facility.

You also cannot reshape a lot so that more water runs onto the neighbor, or so that it arrives in a different way than it naturally did. Where a new wall or raised slab would block or pond runoff, the city wants an approved drain system to carry it off, and a sump pump needs department approval. We lay out area drains, channel drains and the pipe run before the forms go up. Our drainage systems page shows the parts.

### Encino questions

**Do I need a permit to build a retaining wall in Encino?**
Only the smallest walls are exempt. Los Angeles does not require a building permit for a retaining wall up to 4 feet tall, counted from the bottom of the footing, when the ground behind it is level and the slope below is 20 percent or flatter. Anything else needs a permit, and on a hillside lot usually an engineer. We build retaining walls from the stamped drawings.

**Can I pour a patio or driveway under an oak tree in Encino?**
Not without checking with the city first. Native oaks 4 inches or more in diameter are protected, and damaging the roots by excavating or filling inside the drip line counts as removal under the city's rules. Talk to the Urban Forestry Division before the layout is set. Keeping the slab and its base outside the canopy is the simple way through.

**How deep do footings have to be for an addition or ADU in Encino?**
Without a soils report, Los Angeles calls for footings at least 24 inches deep at exterior walls and 18 inches at interior ones, because the city assumes the soil is expansive. A soils report can change those numbers. We form and pour to whatever your approved plans show.

**How much does a concrete driveway cost in Encino?**
We do not publish prices, because the number depends on the site. In Encino what moves it most is length, slope, truck access, breaking out and hauling off the old slab, the base, the steel, drainage and the finish, along with a Bureau of Engineering permit when the apron is replaced. Our number comes from a free on-site estimate.

**How soon can you start a job in Encino?**
Most jobs start about two weeks after you approve the estimate. A permit, a tree review or a design review board hearing comes first where one applies, and those run on the city's schedule. We are about 25 minutes away and work Monday to Saturday, 6 AM to 7 PM. Send us a message or call (818) 464-5763.

## Concrete contractor in Burbank, CA

URL: [ikonconcrete.com/service-areas/burbank](https://ikonconcrete.com/service-areas/burbank)

We do concrete work in Burbank, 16 miles from our yard in Sylmar. We take the 118 for a couple of miles and then the 5 south, about 25 minutes without traffic. Burbank is its own city, not part of Los Angeles. Building and Safety and the Planning Division share the Community Services Building at 150 North Third Street, and Public Works handles the sidewalk and the street.

What sets Burbank apart for our trade is how much its zoning code says about the front yard: how much of it can be paved, how wide the driveway can be, how tall a wall can stand and how far a low retaining wall sits from the sidewalk. We build driveways, block walls, patios and commercial flatwork here with those numbers in hand. Ikon Concrete Design is family owned, and estimates are free.

- **County:** Los Angeles
- **Building department:** City of Burbank Building and Safety, 150 N. Third Street; Public Works for the street
- **Typical home age:** Median year built 1959; about a third built before 1950
- **Terrain and soil:** Flat valley floor near 500 feet, rising to the Verdugo Mountains
- **Common concrete work:** Driveway replacement, front walks, block walls, patios, commercial flatwork
- **Drive from our yard:** About 16 miles, roughly 25 minutes by the 118 and the 5
- **ZIP codes:** 91501, 91502, 91504, 91505, 91506
- **Neighborhoods:** Magnolia Park, Rancho Equestrian District, Media District, Downtown Burbank, Hillside Area, Airport District, Empire Center

### The 45 percent rule for Burbank front yards

In Burbank's single-family zones, no more than 45 percent of the required front yard can be hardscape. The code counts cement concrete, asphalt, brick and pavers, and allows another 5 percent for decorative paving inside a planted area. A driveway can be no wider at the curb than a quarter of the lot width, and never more than 15 feet. Where the garage sits behind the house, the driveway can widen to 20 feet inside the front setback if the 45 percent still holds.

The same section says a walkway cannot be poured against the driveway to make one continuous paved surface. A planted buffer has to separate the two, and the walk has to be a different surface material. That is a fair use for stamped or colored concrete beside a broom finished drive. At the estimate we sketch the driveway, the walk and the planting against that 45 percent before anything is formed.

### Walls and fences go to Planning before Building

Every new property wall or fence in Burbank is reviewed by the Planning Division first, on a wall and fence application with a site plan and an elevation drawing. In single-family zones the limit is 4 feet inside the front yard setback, and any part above 2 feet has to be at least half open. Along interior side and rear lines it is 8 feet. Inside a corner cutoff area nothing may stand over 3 feet.

Front yard retaining walls get their own line in the code: 30 inches at most, set 18 inches back from the sidewalk with a planting strip between, and no more than two. For the building permit, retaining walls are exempt up to 4 feet from the bottom of the footing, unless they carry a surcharge. There is a local reason we build with steel and grout. The 1971 San Fernando earthquake damaged poorly reinforced and unreinforced masonry fences in Burbank.

### Concrete from the 1920s through the 1950s

Burbank is an old city by Valley standards. Census estimates put the median home at 1959, with 22 percent of the housing built in the 1940s and another 13 percent before 1940. Magnolia Park was laid out in the early 1920s, and most of its houses went up in the 1940s for returning veterans, in the years when Lockheed built aircraft here. A driveway poured with one of those houses is 70 to 100 years old.

Slabs that age were poured to the practice of their day, often without rebar. Once one has broken into pieces that rock underfoot, a patch rarely holds, and demolition and a new pour is the usual fix. Where the old slab is worn but still solid and level, resurfacing can be enough. Heat is a factor on the valley floor too. Burbank Airport tied its all-time record of 114 degrees on September 5 and 6, 2020.

### The hillside area, and who handles the sidewalk

Burbank's zoning code draws its hillside area by street name. It is the ground between the Glendale and Los Angeles city lines and Sunset Canyon Drive, Walnut Avenue, Bel Aire Drive, Cambridge Drive, Kenneth Road and Scott Road. Houses inside it follow separate hillside standards, and some projects need a Hillside Development Permit. Those lots climb the Verdugo Mountains, so retaining walls, steps and drainage are most of the work.

Down at the street the split is simple. Public Works tells residents to call Building and Safety about a driveway on private property and Public Works about the sidewalk and the driveway approach. Its excavation permit requires sidewalk to be replaced to the nearest score line, in sections at least 5 feet by 5 feet, matching the existing finish. Parkway trees are the city's to trim, and a walk lifted by their roots is reported to Street and Sidewalk Maintenance.

### Burbank questions

**How much of my front yard can be concrete in Burbank?**
No more than 45 percent of the required front yard setback in a single-family zone, plus up to 5 percent for decorative paving within a landscaped area. The allowed paving is the driveway to the garage or required parking and pedestrian paths. If you want artificial turf in front, the code limits it to half of the landscaped area.

**Do I need a permit to replace my driveway in Burbank?**
For the part on your own lot, often not. The city's exemption list for single-family homes includes sidewalks and driveways that are not more than 30 inches above the adjacent grade, though the zoning limits on width and paving still apply. The approach between the street and your property line is public right of way and goes through Public Works. We will tell you at the estimate which applies.

**How tall can a block wall be in Burbank?**
Up to 8 feet along interior side and rear property lines in a single-family zone, and 4 feet in the front yard setback with the part above 2 feet at least half open. Planning reviews every new wall first. A wall over 7 feet, measured from the bottom of the footing, also needs a building permit.

**Do you do commercial concrete in Burbank?**
Yes. We pour walks, ramps, curbs and slabs for property owners and general contractors, and Burbank has a lot of that kind of property around its downtown and the Media District. Street work comes with city conditions. Under the Public Works excavation permit, lane closures are allowed only between 8:30 AM and 3:30 PM and one lane each way stays open. Our commercial concrete page has more.

**How quickly can you get to Burbank and start?**
Burbank is about 25 minutes from our Sylmar yard without traffic. We work Monday to Saturday, 6 AM to 7 PM, and most jobs start about two weeks after you approve the estimate. Planning review of a wall or fence happens before that and runs on the city's clock. Contact us or call (818) 464-5763 for a free estimate.

## Concrete contractor in Glendale, CA

URL: [ikonconcrete.com/service-areas/glendale](https://ikonconcrete.com/service-areas/glendale)

We do concrete work in Glendale, about 21 miles from our yard in Sylmar. The drive is a short stretch of the 118 and then the 5 south, a little under half an hour when the freeway is clear. Glendale has been its own city since 1906. Plans and permits go through the Permit Services counter in the Municipal Services Building at 633 East Broadway, and street work goes through the director of public works.

Much of the city sits in and around the Verdugo Mountains, and its zoning code is specific about walls on a slope: how tall, how many in a row and what they are faced with. That suits the work we do most, which is retaining walls, decorative block and stone, drainage and driveways. Ikon Concrete Design is family owned, has been licensed since 1999, and gives free estimates.

- **County:** Los Angeles
- **Building department:** City of Glendale Permit Services, 633 E. Broadway; Public Works for the street
- **Typical home age:** Median year built 1966; one in five homes built before 1940
- **Terrain and soil:** Verdugo Mountains slopes and canyons above a flat city center
- **Common concrete work:** Hillside retaining walls, decorative block and stone, drainage, driveway replacement
- **Drive from our yard:** About 21 miles, a little under 30 minutes by the 118 and the 5
- **ZIP codes:** 91201, 91202, 91203, 91204, 91205, 91206, 91207, 91208, 91210, 91214
- **Neighborhoods:** Rossmoyne, Adams Hill, Brockmont Park, Royal Boulevard, Ard Eevin Highlands, Cottage Grove, Montrose, Verdugo City

### Retaining walls in Glendale's hillside zones

In the ROS and R1R zones, which cover Glendale's hillside neighborhoods, the zoning code sets the height of a retaining wall by what can be seen of it. Most walls may show no more than 5 feet at any point, and only 3 feet when they stand within 5 feet of an interior property line. Up to three walls can step up a slope if they are at least 5 feet apart and the ground between them is no steeper than 2 to 1.

A wall near the street that runs parallel to it gets the same 5 feet, plus 2 more if it is faced in decorative masonry or stone and the director approves. Walls hidden behind the house can reach 15 feet. Tall or loaded walls are engineered, and we build retaining walls from the stamped drawings.

### What a visible wall has to be made of

Glendale also writes the finish into the code. Any exposed retaining wall in the hillside zones that can be seen from a street or a neighboring property has to be stone, textured poured concrete, or textured decorative colored block, with colored grout that blends with the natural hillside. Plain gray block does not meet that. This is work we like: split face and colored block, stone veneer, and board formed or textured concrete. Our block walls and hardscape pages show examples.

Garden walls are reviewed too. In the single-family zones a new fence or wall over 3 feet that can be seen from the street goes to design review, though staff can exempt one built of wood, masonry or decorative metal that suits the house. Chain link in view of the street is not allowed.

### Front setbacks stay mostly green

The street front setback in Glendale's residential zones is close to off limits for structures. The code allows retaining walls, planters and curbs there only up to 18 inches above the existing ground, and the city's fence handout says fences and walls are not allowed in the street setbacks outside the horse overlay zone. Plants have to cover more than half of the setback, not counting the permitted driveway, and at least 40 percent of the whole lot has to stay landscaped open space.

That shapes a front yard job. A wider driveway or a paved courtyard has to fit inside those percentages, and neither the street setback nor the side yards may be paved over completely. The code encourages permeable surfaces, so concrete pads with planted or gravel joints are often the answer. We will tell you at the estimate what looks likely to need city review.

### Old houses, the Verdugo Wash and the curb

Glendale's housing is older than most of the Valley's. Census estimates put the median home at 1966, and one in five was built before 1940. The city has five historic districts: Ard Eevin Highlands, Cottage Grove, Royal Boulevard, Brockmont Park and Rossmoyne. Concrete from those decades is at the end of its life, and on a district street the replacement should match the old scoring and finish. Between 1935 and 1937 the Works Progress Administration channelized the Verdugo Wash through the city, which is where hillside runoff still ends up.

At the street, the municipal code requires a permit to build, rebuild or remove any curb, gutter, sidewalk, driveway or drain in a public street. Where a street has no concrete curb, the city may permit only an asphalt driveway, and treats it as temporary under a revocable permit.

### Glendale questions

**How tall can a retaining wall be in Glendale's hills?**
In the ROS and R1R hillside zones, most retaining walls may show no more than 5 feet. The limit drops to 3 feet within 5 feet of an interior property line, and rises to 15 feet for walls hidden from the street behind a building. More height is handled by stepping two or three walls up the slope at least 5 feet apart.

**Can I build a block wall along the front of my Glendale house?**
Generally not in the street front setback. The zoning code allows only retaining walls, planters and curbs up to 18 inches there. Behind the setback, a wall over 3 feet that can be seen from the street goes through design review or a staff exemption, so check with Permit Services before you settle on a design.

**Does a retaining wall in Glendale have to be decorative?**
In the hillside zones, yes, if it can be seen from a street or a neighboring property. The code calls for stone, textured poured concrete or textured decorative colored block with colored grout. We build all three, and our decorative concrete page covers the finishes.

**Do I need a permit to replace my driveway approach or sidewalk in Glendale?**
Yes. Glendale's municipal code requires a permit from the director of public works to construct, reconstruct or remove any curb, gutter, sidewalk or driveway in a public street. The work is built to the city's standard plans and inspected. The part of the driveway on your own lot is a separate question, and we will tell you at the estimate whether it needs a permit.

**How far is Glendale from your yard, and what are your hours?**
About 21 miles, a little under 30 minutes without traffic. We work Monday to Saturday, 6 AM to 7 PM, and most jobs start about two weeks after the estimate is approved. Send us a message or call (818) 464-5763 to set up a free estimate.

## Concrete contractor in La Cañada Flintridge, CA

URL: [ikonconcrete.com/service-areas/la-canada-flintridge](https://ikonconcrete.com/service-areas/la-canada-flintridge)

We do concrete work in La Cañada Flintridge, 17 miles from our yard in Sylmar and one of the easiest drives we have. The 210 east runs from Sylmar straight to the Angeles Crest and Foothill Boulevard exits in a little over 20 minutes without traffic. The city was formed in 1976 from two communities, La Cañada and Flintridge, and it issues its own permits from City Hall at One Civic Center Drive.

The ground here tilts. The city climbs from about 970 feet near Devil's Gate Dam to about 2,400 feet at the top of Ocean View Boulevard, with the San Gabriel Mountains directly behind. So the jobs lean toward drainage systems, retaining walls, hillside grading and the long driveways that estate lots need. Ikon Concrete Design has been a family business since 1999, and we do not charge for estimates.

- **County:** Los Angeles
- **Building department:** City of La Cañada Flintridge Building and Safety, using Los Angeles County codes
- **Typical home age:** Median year built 1957; a third from the 1950s
- **Terrain and soil:** Foothill slopes from about 970 to 2,400 feet below the San Gabriel Mountains
- **Common concrete work:** Drainage, retaining walls, hillside grading, long driveways, patios
- **Drive from our yard:** About 17 miles, a little over 20 minutes on the 210
- **ZIP codes:** 91011
- **Neighborhoods:** Flintridge, La Cañada, Alta Canyada, Historic Deodar District, Paradise Canyon, Pickens Canyon

### The 15 percent rule for hillside lots

La Cañada Flintridge defines a hillside lot as any residential lot with an average slope of 15 percent or more. On one of those, the city's hillside chapter requires a Hillside Development Permit for any project that needs a building permit. A retaining wall, a raised pool deck or a new foundation on a sloped lot therefore goes through planning review as well as plan check.

The building code itself is borrowed. The city has adopted the Los Angeles County building and residential codes by reference, with its own exceptions, and it holds grading plan check on its own morning each week. Plan for that calendar. We will tell you at the estimate whether your job is likely to need a permit, and on a hillside lot we build walls and footings from the engineer's stamped plans.

### Water off the mountain

The Station Fire of August 2009 burned the slopes above the city, and the rains that followed in 2010 brought mudslides that damaged homes next to the arroyos on its northern edge. Burned slopes shed water fast and carry soil and rock with it. The National Weather Service warns that the flood risk below a burn area stays high for years.

Even in an ordinary winter, a foothill lot takes on water from the lot above and has to pass it on without sending it through the garage. That is the part of this trade we specialize in. We set area drains and channel drains in the flatwork, run solid pipe to the street, put gravel and perforated pipe behind retaining walls, and slope slabs away from the house. On a lot that backs onto a canyon, the drainage is laid out first and the patio is shaped to fit it.

### Fences, walls and the neighbors

In the R-1 zone every fence or wall over 42 inches needs a building permit, a lower trigger than most cities use. For a wall on the property line the city notifies the adjoining owners before it issues the permit, and the line has to be marked in the field from a licensed surveyor's survey. The survey can be waived if the neighbors sign their acceptance of the wall location on the site plan.

The practical advice is to talk to the neighbor and settle the line before you ask for a price. A block wall set a few inches onto the wrong lot is expensive to fix. On a sloped lot the wall may also be holding soil, which makes it a retaining wall with a footing, steel and drainage to match, and brings the hillside rules into play.

### Front yards, protected trees and 1950s slabs

At least half of a front yard here has to stay landscaped, so a wider driveway or a parking court needs to be checked against that first. The city protects oaks and California sycamores of 12 inches or more in diameter on R-1 lots, plus the deodar cedars near the street in the Historic Deodar District, on streets such as Alta Canyada Road and Fairmount Avenue. Keep trenches and new paving away from those trunks.

The houses are mostly postwar. Census estimates put the median home at 1957, and a third were built in the 1950s. A driveway from that decade has had about 70 years of roots, runoff and traffic. Our concrete demolition crew takes out the old slab, and we rebuild the base before the new one is poured.

### La Cañada Flintridge questions

**When does a project in La Cañada Flintridge need a Hillside Development Permit?**
When the lot has an average slope of 15 percent or more and the work needs a building permit. That covers most retaining walls and foundations on sloped lots. The permit is a planning approval that comes on top of the building permit, so allow time for it.

**Do I need a permit for a garden wall or fence in La Cañada Flintridge?**
Yes, if it is over 42 inches tall. The city requires a building permit for any fence or wall above that height in the R-1 zone, and it notifies the neighbors before permitting one on a property line. A survey or the neighbors' written acceptance of the location is part of the application.

**My lot is below a canyon. What should I do about drainage before the rainy season?**
Have the drains checked and cleared, and look at where water enters and leaves the lot. Homes next to the arroyos here were damaged by mudslides in 2010 after the Station Fire. We can add area drains, a channel drain across the driveway or a pipe to the street, but walls meant to stop mud and debris have to be designed by an engineer.

**What hours can concrete work be done in La Cañada Flintridge?**
The city allows construction from 7 AM to 6 PM on weekdays, until 7 PM during daylight saving time, and from 9 AM to 5 PM on Saturdays. No construction is allowed on Sundays or city holidays. We schedule pours and saw cutting inside those hours.

**How do I get an estimate for a job in La Cañada Flintridge?**
Send us a message or call or text (818) 464-5763. We are about 20 minutes away on the 210, the estimate is free, and most jobs start about two weeks after you approve it. If you have a survey, a soils report or plans, have them ready for the visit.

## Concrete contractor in Altadena, CA

URL: [ikonconcrete.com/service-areas/altadena](https://ikonconcrete.com/service-areas/altadena)

We do concrete work in Altadena, about 22 miles from our yard in Sylmar. The 210 east takes us to the Lincoln Avenue and Lake Avenue exits in roughly half an hour without traffic. Altadena is not a city. It is an unincorporated community of Los Angeles County, so permits and inspections come from County Public Works and County Planning.

The Eaton Fire started on January 7, 2025. CAL FIRE's count for the fire is 14,021 acres, 9,419 structures destroyed, 1,076 damaged and 19 civilian deaths. Most of the concrete work here now is part of putting homes back: foundations and slabs, retaining walls, driveways and drainage. We are a family owned concrete contractor, licensed since 1999, and we work from the plans your designer and the county have approved.

- **County:** Los Angeles (unincorporated)
- **Building department:** Los Angeles County Public Works Building and Safety, with County Planning
- **Typical home age:** Median year built 1946 before the Eaton Fire; many lots now rebuilding
- **Terrain and soil:** Sloping ground at the foot of the San Gabriel Mountains, above Pasadena
- **Common concrete work:** Rebuild foundations and slabs, retaining walls, driveways, drainage
- **Drive from our yard:** About 22 miles, roughly 30 minutes on the 210
- **ZIP codes:** 91001
- **Neighborhoods:** Altadena Meadows, Janes Village, Christmas Tree Lane, Farnsworth Park, Mariposa Street, Eaton Canyon

### What Los Angeles County says about the old foundation

The first question on a burned lot is whether the existing foundation can stay. The county's answer is that an engineer decides, not the owner or the contractor. Its fire rebuild guidance says you need an engineering consultant to evaluate the foundation, and that it may be reused only if a licensed civil engineer, structural engineer or architect finds minimal fire damage, based on testing and forensic analysis, and it meets the current building code.

That professional also has to confirm the drain, water and other lines under the slab are fit to keep using, and the old electrical conductors under the slab must be replaced. If the slab and footings come out instead, the county asks for a compaction report from a geotechnical or civil engineer wherever soil was disturbed deeper than 12 inches. We pour the new foundation after that report and the permit are in hand.

### Like-for-like rebuilds, soils reports and grading

County rules treat a rebuild as like-for-like when it is the same use in the same location and about the same size. In the Eaton Fire area it may grow by 10 percent or 200 square feet, whichever is greater. A like-for-like home is excused from current zoning standards but still has to meet today's building, fire and health codes.

A soils report is not always required. The county says a conventional raised or slab on grade foundation with continuous footings built to its minimum standards can go without one, while caissons, deep piles, basement walls and lots with a geologic hazard still need one. Whether a grading permit is needed depends on how much soil the debris removal took, whether below grade walls are backfilled, and the condition of the site. These answers come from the county's plan checker and your engineer, and we build to them.

### Walls, fences, driveways and water on a rebuild lot

The county allows fences and retaining walls on a lot before the house is rebuilt when they are needed to protect temporary housing, the replacement home, the lot or structures that survived. They have to meet county zoning, including the Altadena Community Standards District rules for fences, walls and landscaping. Work on a driveway approach, curb or sidewalk in the county road right of way needs a road permit from Public Works.

Drainage gets a close look as well. The county's guidance on cross-lot drainage gives two choices: handle any effect on the neighboring lot on your own site, or record a drainage acceptance covenant signed by that neighbor. For homes built before 2009, like-for-like rebuilds in the Eaton area are exempt from the county's low impact development review. We plan the drains, the slab slopes and the driveway together so the water has an approved place to go.

### An old community on sloping ground

Altadena sits above Pasadena at the foot of the San Gabriel Mountains, and the name itself means upper. Before the fire its housing was some of the oldest in the region. Census estimates for 2020 to 2024 put the median home at 1946, with 37 percent built before 1940. Between 1924 and 1926 alone, Elisha Paul Janes built 160 of the steep roofed cottages that were later designated a heritage area.

For the homes that are still standing, that age shows in the concrete: thin driveways, walks lifted by old trees and low walls built without much steel. Those are ordinary repairs, and we do them. For owners who are rebuilding, we know this is a hard and long process. We will give a clear written scope and a free estimate, and then follow the schedule your plans, your builder and the county set.

### Altadena questions

**Can I reuse my foundation after the Eaton Fire?**
Only if an engineer says so. Los Angeles County requires an engineering consultant to evaluate the foundation, and it can be reused only when a licensed civil or structural engineer or architect finds minimal fire damage through testing and it meets the current code. The same professional has to verify the utilities under the slab. We do not make that call, and we build from the result.

**Who issues permits for concrete work in Altadena?**
Los Angeles County does, because Altadena is unincorporated. Building permits come from County Public Works Building and Safety with review by County Planning, and the county runs a permit center in Altadena for fire rebuilds, with walk-in help and appointments. At the estimate we will say whether we think your job needs a permit.

**Do I need a soils report to pour a new foundation in Altadena?**
Not necessarily. The county says a conventional raised or slab on grade foundation with continuous footings designed to its minimum standards does not need one. Deep foundations, basement walls and lots with a geologic hazard still do. If the old slab was removed and soil was disturbed more than 12 inches deep, a compaction report is required.

**Can I put up a wall or fence before I rebuild the house?**
Yes, in many cases. The county permits fences and retaining walls that are needed to protect temporary housing, a like-for-like replacement, the lot or remaining structures, as long as they meet the Altadena Community Standards District rules. Taller retaining walls need engineered plans, which we build from.

**How do I get a concrete estimate for an Altadena rebuild?**
Call or text (818) 464-5763, or write to us here. Estimates are free, and it helps to have your approved or draft plans, the engineer's foundation letter and any soils or compaction report. Most jobs start about two weeks after the estimate is approved, once the permit allows the work.

## Concrete contractor in Los Angeles, CA

URL: [ikonconcrete.com/service-areas/los-angeles](https://ikonconcrete.com/service-areas/los-angeles)

We do concrete work in the City of Los Angeles north of downtown: Studio City and the Hollywood Hills, Los Feliz, Silver Lake, Eagle Rock and Highland Park, and west to Bel Air and Brentwood. From our yard in Sylmar it is about 25 minutes down the 5 and the 170 to Studio City before traffic, about half an hour to Hollywood or Eagle Rock, and a few minutes more on the 405 to Brentwood. We do not take jobs south of downtown.

Most of the work in these neighborhoods involves a slope: retaining walls, hillside drainage, foundations and driveways that climb. On the flatter streets it is new driveways and stained concrete. Ikon Concrete Design is family owned, in business since 1999, with a crew of eight. Estimates are free.

- **County:** Los Angeles
- **Building department:** LADBS on private property; Bureau of Engineering (A-Permit) in the public right-of-way
- **Typical home age:** Citywide median year built 1965; about 19% built before 1940 (Census)
- **Terrain and soil:** Santa Monica Mountains and Northeast Los Angeles hillsides above flat basin and Valley lots
- **Common concrete work:** Retaining walls, hillside drainage, foundations, driveways, stained concrete
- **Drive from our yard:** About 25 minutes to Studio City, 30 to Hollywood or Eagle Rock, 35 to Brentwood, before traffic
- **ZIP codes:** 90026, 90027, 90028, 90038, 90039, 90041, 90042, 90046, 90049, 90065, 90068, 90077, 91604
- **Neighborhoods:** Hollywood, Hollywood Hills, Laurel Canyon, Los Feliz, Silver Lake, Echo Park, Eagle Rock, Highland Park, Mount Washington, Studio City, Bel Air, Brentwood

### What LADBS allows for a retaining wall on a hillside lot

The Los Angeles Department of Building and Safety (LADBS) lets you build a retaining wall without a building permit only when it stands 4 feet or less from the bottom of the footing to the top, holds level ground with no extra load behind it, and sits where the slope below is no steeper than 1 in 5. Anything taller, loaded or on steeper ground needs a permit and engineered plans. We build from your engineer's stamped drawings.

Zoning adds limits in a designated Hillside Area. A lot gets one free-standing retaining wall up to 12 feet, or two walls of up to 10 feet each set at least 3 feet apart, with height measured from the top of the wall to the lower ground beside it. Walls 8 feet and taller have to be planted so they end up hidden. More walls or more height takes a Zoning Administrator approval. See our retaining walls and block walls pages.

### Grading and hauling limits under the Baseline Hillside Ordinance

The Baseline Hillside Ordinance took effect in 2011 and was amended in 2017. It covers single-family lots zoned R1, RS, RE or RA in a Hillside Area, and it caps how much dirt a project may cut and fill: 1,000 cubic yards plus 10 percent of the lot's square footage, but never more than the limit for the zone. That limit is 1,000 cubic yards in R1 and rises to 6,600 in RE40. On a substandard hillside street an R1 lot may truck only 750 cubic yards in or out.

Bel Air, Beverly Crest, Laurel Canyon, Kirkwood and the Bird Streets sit in Hillside Construction Regulation districts, where haul trucks are held to four trips an hour, exterior construction runs Monday to Friday, 8 AM to 6 PM, and moving 1,000 cubic yards or more needs a haul route approval from the Board of Building and Safety Commissioners. We plan grading and hillside work and demolition and hauling around those numbers.

### Driveway aprons, sidewalks and the Bureau of Engineering A-Permit

The strip of driveway between the curb and your property line is public right-of-way, and work on it takes a Class A-Permit from the Bureau of Engineering. The municipal code sets the apron at 10 feet wide at minimum in the single-family zones and 18 feet at most, measured along the curb. Wider than that needs a written deviation. The bureau says it aims to review A-Permit applications within two business days, and a permit expires six months after it is issued.

Broken sidewalk in front of the house is a separate question. The city's Safe Sidewalks LA rebate pays part of a voluntary repair, up to a cap for each residential lot, and the work is done under a no-fee A-Permit tied to the rebate offer. Apply through MyLA311 before any concrete comes out, because work finished ahead of the offer does not qualify. We pour city sidewalks and driveway aprons and will tell you at the estimate which permit applies.

### Drainage on a Los Angeles hillside has to end at the street

Water is behind most failed hillside concrete, and the city is specific about where it may go. LADBS requires that surface water gathered or turned by a retaining wall be carried to the public street in a pipe or lined channel that will not erode, and it does not allow drainage across a neighbor's lot. A pipe outlet through the curb is a curb drain, which falls under the A-Permit and has to sit at least 2 inches below the top of the curb.

That is the work we do under drainage systems: area drains, channel drains across a driveway, solid pipe out to the street. Flatter lots in Studio City, Los Feliz and Highland Park more often need a slab for an addition or an ADU, or an old patio the owner would sooner stain than tear out. Citywide, the Census puts the median home at 1965, with about one in five built before 1940.

### Los Angeles questions

**Do I need a permit to build a retaining wall in Los Angeles?**
Usually, yes. LADBS exempts only a wall 4 feet or less from the bottom of the footing to the top, with level ground and no extra load behind it, on a slope no steeper than 1 in 5. Every other retaining wall needs a building permit and engineered plans. We will tell you at the estimate which side of that line your wall falls on.

**Who issues the permit for a new driveway approach in Los Angeles?**
The Bureau of Engineering does, with a Class A-Permit, because the apron between the curb and your property line is public right-of-way. In single-family zones the apron runs 10 to 18 feet wide along the curb unless the bureau approves a deviation. The driveway on your own lot is a matter for LADBS. Our concrete driveways page explains how we build them.

**Will the City of Los Angeles help pay to fix the sidewalk in front of my house?**
It may. The Safe Sidewalks LA rebate program pays part of a voluntary sidewalk repair, with a limit per residential lot, when the walk no longer meets access rules, for example a lift of more than a quarter inch. You apply through MyLA311, the city inspects and sends an offer, and the repair is done under a no-fee A-Permit. Check that the program is still taking applications, since it depends on funding.

**Does Ikon Concrete Design work south of downtown Los Angeles?**
No. Our yard is in Sylmar and we keep to the part of the city north of downtown, along with Burbank, Glendale, Pasadena and Beverly Hills. If you are not sure whether your address is inside our area, send us a message with the cross streets and we will tell you.

**Why does concrete cost more in the Hollywood Hills than on a flat lot?**
Access and dirt drive the price. Narrow streets can mean a pump and smaller trucks, the hillside rules cap how much soil can be hauled and when trucks may run, and walls over the permit threshold need engineering and inspections. Our price comes from a free on-site estimate, where we can see the slope, the street and the drainage for ourselves.

## Concrete contractor in Pasadena, CA

URL: [ikonconcrete.com/service-areas/pasadena](https://ikonconcrete.com/service-areas/pasadena)

We do concrete work in Pasadena, a straight run east on the 210 from our yard in Sylmar: about 30 minutes and 23 miles before traffic. Pasadena is its own city, incorporated in 1886, and its Permit Center at 175 North Garfield Avenue issues the building permits. Nothing here goes through Los Angeles.

It is an old city by local standards. The Census puts the median home at 1961, and close to three in ten were built before 1940, so the job is often a new driveway, walk or garden wall beside a house that is a century old. The new work should not look out of place. We pour driveways and walkways, build block walls, and use colored and stained concrete where plain gray would be wrong for the house.

- **County:** Los Angeles
- **Building department:** City of Pasadena Building and Safety Division (Permit Center); Public Works for the right-of-way
- **Typical home age:** Median year built 1961; 29% built before 1940 (Census)
- **Terrain and soil:** Foothill city at about 860 feet, with hillside lots along the Arroyo Seco and the San Rafael Hills
- **Common concrete work:** Driveways, walkways, block and garden walls, colored and stained concrete
- **Drive from our yard:** About 30 minutes east on the 210 (23 miles), before traffic
- **ZIP codes:** 91101, 91103, 91104, 91105, 91106, 91107
- **Neighborhoods:** Bungalow Heaven, Old Pasadena, Madison Heights, Linda Vista, Hastings Ranch, Garfield Heights, Annandale, Oak Knoll, Lamanda Park, Banbury Oaks

### Landmark districts: what design review covers and what it leaves alone

Pasadena's City Council has designated 26 historic neighborhoods, and Bungalow Heaven was the first, in November 1989. Inside a landmark district, exterior alterations and new construction go through design review and need a Certificate of Appropriateness before a building permit is issued. The city's guidance for owners leaves two things outside that review: landscaping, and exterior changes that cannot be seen from the street.

So a rear patio is one conversation and a new front wall is another. The Bungalow Heaven association lists a driveway gate or a front side yard fence among the items that need the certificate. Whether a replacement driveway or front walk does is a question for the city's Design and Historic Preservation staff at (626) 744-6646, and it is worth asking before you settle on a finish. We can follow the old scoring pattern and work toward the existing integral color and finish texture. See decorative concrete.

### Block walls, the 48 inch line and two inspections

The Building and Safety Division draws the line for a concrete block wall at 48 inches of exposed height. Taller than that needs a building permit before work starts. At or under it, a zoning permit may still apply, and the city asks for a plot plan showing the wall's length and height, plus a survey unless you and your neighbor sign a Common Wall Agreement.

The city's standard wall sheet calls for footing concrete of at least 2,500 psi poured against undisturbed soil, and for two inspections: one when the trench is open and the steel is tied, and one when the first horizontal bar and all the vertical bars are in but before grout. Retaining walls are exempt from a building permit only up to 4 feet from the bottom of the footing to the top, with nothing bearing on the soil behind. We build block walls and retaining walls to the approved plans.

### Street trees, lifted sidewalks and who pays for the repair

The city maintains more than 60,000 public trees, and their roots are the usual reason a Pasadena sidewalk has a raised panel. Under the municipal code, permanent repair of the sidewalk along your frontage is the property owner's responsibility, including damage from street trees. The city's reimbursement program gives back half the cost, up to the limits the program sets, when the work is done under a Public Works permit by a contractor registered with the state Department of Industrial Relations and passes inspection.

The tree itself is off limits. Pruning, removing or injuring a public tree is a violation, and the city's protection zone is the dripline plus 4 feet, with hand tools in the root zone and root cuts avoided. Native trees over 8 inches in diameter and listed specimen trees are also protected in private front yards. We plan sidewalk and walkway work with that in mind.

### Hillside lots above the Arroyo Seco and in the San Rafael Hills

Pasadena's steeper ground sits in a Hillside Overlay District with standards on top of the base zoning. A new house or an addition over 500 square feet there needs a Hillside Development Permit, grading and drainage plans have to be prepared by a registered engineer, and the city's conditions limit the combined height of retaining walls on a lot.

Slope changes the flatwork rules too. An ordinary walk or driveway needs no building permit in Pasadena, but that exemption ends when the slab is more than 30 inches above the ground next to it or sits beside a slope steeper than 3 to 1. On these lots the first job is usually getting water off the hill in a controlled way, so we start with drainage, then the grading and hillside work, then walls and paving, all from your engineer's stamped drawings.

### Pasadena questions

**Do I need a permit to replace my driveway in Pasadena?**
Not a building permit, in most cases. The city's exempt list covers sidewalks and driveways that are no more than 30 inches above the adjacent grade and not next to a steep slope, though a zoning permit may still be required. The approach between the sidewalk and the street is in the public right-of-way and needs a Public Works permit. In a landmark district, check with historic preservation staff first.

**How tall can a block wall be in Pasadena without a building permit?**
Up to 48 inches of exposed height. Over that, the Building and Safety Division requires a building permit before construction starts. Zoning approval applies either way, and the city wants a survey unless you and your neighbor sign a Common Wall Agreement.

**Who pays to fix a Pasadena sidewalk lifted by a city tree?**
The property owner, at least to start. Pasadena's code makes permanent sidewalk repair the owner's job even when a street tree caused the damage. The city's reimbursement program then returns 50 percent of the cost, within caps per square foot and per property frontage, if you apply first and the work is permitted and inspected.

**My house is in Bungalow Heaven. Does new concrete need a Certificate of Appropriateness?**
It depends on what it is and where. Landscaping and changes that are not visible from the street are outside design review, while a driveway gate or a front side yard fence needs the certificate. For a front walk, driveway or street-facing wall, call Design and Historic Preservation at (626) 744-6646 before you choose materials. We will build to whatever the approval specifies.

**How long does it take Ikon Concrete Design to reach Pasadena?**
About half an hour. It is 23 miles on the 210 from Sylmar, and we work in neighboring Altadena and La Canada Flintridge as well. There is no charge for an estimate, and a job typically starts about two weeks after you approve the number. Send us a message to get on the schedule.

## Concrete contractor in Beverly Hills, CA

URL: [ikonconcrete.com/service-areas/beverly-hills](https://ikonconcrete.com/service-areas/beverly-hills)

We do concrete work in Beverly Hills, about 35 to 40 minutes from our Sylmar yard before traffic: down the 405, then east on Sunset or Wilshire, roughly 26 miles. Beverly Hills is its own city, and its Development Services Permit Center at 455 North Rexford Drive issues the permits. One caution on addresses: the 90210 ZIP also covers Beverly Crest, which belongs to the City of Los Angeles and answers to LADBS.

The zoning code splits the city three ways: the Hillside Area, generally north of Sunset Boulevard, Trousdale Estates, and the Central Area, which is everything else and what most people call the Flats. Each has its own limits on paving, walls and dirt. We build driveways, motor courts in stamped and decorative concrete, retaining walls and drainage.

- **County:** Los Angeles
- **Building department:** City of Beverly Hills Community Development, Development Services Permit Center
- **Typical home age:** Median year built 1958; 28% built before 1940 (Census)
- **Terrain and soil:** Flats that slope away from the hills south of Sunset; hillside and Trousdale lots on level pads above
- **Common concrete work:** Estate driveways and motor courts, retaining walls, drainage, decorative flatwork
- **Drive from our yard:** About 35 to 40 minutes by the 405 (26 miles), before traffic
- **ZIP codes:** 90210, 90211, 90212
- **Neighborhoods:** The Flats, Trousdale Estates, Hillside Area north of Sunset, Golden Triangle, West Gateway, Southeast Beverly Hills

### Front yard paving north of Sunset: the 33 percent cap

In the Hillside Area no more than 33 percent of a front yard may be paved. The code allows one walkway up to 5 feet wide, keeps paving at least 5 feet from a property line and holds a circular driveway to 12 feet wide. Asphalt is prohibited in the front yard, and no more than three paving materials may be used there. Trousdale Estates carries the same 33 percent cap.

That is why a motor court here gets laid out to the square foot before anyone orders forms. Concrete gives the designer range inside those limits: a stamped field, a sawcut grid, an integral color or a stained band. Bring us the landscape architect's layout and we will price it as drawn. Our stamped concrete and concrete staining pages show the finishes.

### Walls: 3 feet near the street, 12 feet cumulative on a slope

Hillside Area lots need a building permit for any wall or fence over 6 feet, and for any wall or fence in a front yard no matter how low. Nothing may be built within 3 feet of the front lot line. From there back to 10 feet the limit is 3 feet high, and elsewhere on the lot a wall may reach 7 feet.

Terraced walls have their own rule. Where a line cut straight through the terraces would cross 7 feet or more of wall, the segments have to be separated by at least 10 feet of planted ground, and the total may not pass 12 feet within any 50 foot section unless the city grants a Hillside R-1 permit. In Trousdale, the first fifth of the front setback is held to 3 feet, and new fences in a neighbor's line of sight to the basin are capped at 36 inches above the uphill pad. We build retaining walls from your engineer's stamped plans.

### Dirt limits in the hills and truck rules in Trousdale Estates

A Hillside Area site may import or export no more than 3,000 cubic yards of earth in any five years, and only 1,500 where the lot sits next to a street under 24 feet wide. Trousdale goes further: no permitted grading on ground steeper than 1 in 5, no raising the pad, and nothing built past the level pad or above 14 feet.

Trousdale also regulates the trucks. Under a 2015 ordinance, vehicles over 26,000 pounds must pass a secondary brake inspection and carry a city decal that is renewed yearly, nothing weighing 50,400 pounds or more may use the streets, hauling runs from 8:30 AM to 3:15 PM with 24 hours' notice to the city, and a site may park two construction vehicles on the street. Concrete weighs about 4,000 pounds a cubic yard, so ready-mix deliveries have to be planned as partial loads. Our grading and hillside and demolition crews plan around it.

### Weekday hours and what they do to a pour schedule

Beverly Hills bars permitted construction between 6 PM and 8 AM, all day Sunday and on a list of holidays that includes Yom Kippur. Saturday work in or within 500 feet of a residential zone needs an after hours permit, and the permit center states it does not issue those for residential projects. For a house, that leaves Monday to Friday, 8 AM to 6 PM.

Concrete has to be placed, finished and cut inside that window, so we size each pour to fit the day instead of starting at first light the way we would elsewhere. Work that reaches the sidewalk, parkway or street goes through the city's public right-of-way permit, with traffic plans due four business days ahead. Older estates bring their own work as well: the Census median here is 1958, and more than a quarter of homes predate 1940, so original walls and drains are often due for replacement.

### Beverly Hills questions

**What hours can a contractor pour concrete at a Beverly Hills home?**
Monday to Friday, 8 AM to 6 PM. The municipal code bars permitted work overnight, on Sundays and on listed holidays, and Saturday work near homes needs an after hours permit that the city says it does not issue for residential projects. We plan pours so the finishing can be done before 6.

**How much of my front yard can I pave in Beverly Hills?**
In the Hillside Area and Trousdale Estates the limit is 33 percent of the front yard, with asphalt prohibited in Hillside Area front yards. The Central Area has its own standards, so confirm the figure for your lot with the Planning staff before the design is final. We will build the driveway to the approved plan.

**My address is 90210. Is my permit from Beverly Hills or Los Angeles?**
It depends on which side of the city line you are on. The 90210 ZIP covers the City of Beverly Hills and also Beverly Crest, often called Beverly Hills Post Office, which is in the City of Los Angeles. Beverly Crest permits come from LADBS under the rules on our Los Angeles page.

**Can a concrete truck reach my house in Trousdale Estates?**
Yes, with planning. Heavy vehicles need a city brake inspection and decal, nothing at or over 50,400 pounds may use Trousdale streets, and hauling is limited to 8:30 AM to 3:15 PM with a day's notice to the city. That usually means partial loads and a pump. Tell us the address when you send a message and we will plan the access first.

**Do I need a permit for a garden wall in the Beverly Hills hills?**
For many walls, yes. In the Hillside Area a building permit is required for any wall or fence over 6 feet and for any wall or fence in the front yard at any height. Retaining walls also need engineering once they hold back real load, and we build those from stamped drawings.

## Concrete contractor in Simi Valley, CA

URL: [ikonconcrete.com/service-areas/simi-valley](https://ikonconcrete.com/service-areas/simi-valley)

We do concrete work in Simi Valley, about 30 minutes west of our Sylmar yard on the 118, roughly 24 miles to City Hall on Tapo Canyon Road before traffic. Simi Valley is its own city in Ventura County, so permits come from the city's Building and Safety Division and its Public Works counter, not from Los Angeles.

About two thirds of the homes here went up between 1960 and 1989, by Census estimates, which puts a lot of original driveways, patios and block walls at 40 to 60 years old. That is the work this city tends to need: driveway and patio replacement, block walls, retaining walls on the hillside lots, and drainage for clay soil. We are family owned, in business since 1999, and estimates are free.

- **County:** Ventura
- **Building department:** City of Simi Valley Building and Safety Division; Public Works for encroachment permits
- **Typical home age:** Median year built 1980; about two thirds built 1960 to 1989 (Census)
- **Terrain and soil:** Flat valley floor with hillside tracts on the edges; expansive clay; liquefaction zones at the east and west ends
- **Common concrete work:** Driveway and patio replacement, block walls, retaining walls, drainage
- **Drive from our yard:** About 30 minutes west on the 118 (24 miles), before traffic
- **ZIP codes:** 93063, 93065
- **Neighborhoods:** Wood Ranch, Big Sky, Indian Hills, Texas Tract, Bridle Path, Kadota Fig, Santa Susana

### 1960s to 1980s tracts and the concrete that came with them

The Census puts the median Simi Valley home at 1980. One in four was built in the 1960s, one in five in the 1970s and nearly another quarter in the 1980s, while only about 6 percent date from before 1960. Flatwork poured with those houses has carried two generations of cars. The usual signs are panels that have dropped or lifted, broken sections along the tire tracks, and a surface that scales.

Patching rarely holds on a slab that is moving. We break out the old concrete and haul it off, recompact the base, and pour a new driveway with its thickness and steel set for what will park on it, from a sedan to a motorhome. If the plan widens the driveway or adds parking in the front yard, check with the Planning Division first, because new front yard paving needs a Zoning Clearance.

### Retaining walls and the 20 percent slope rule

Simi Valley's Planning Division is plain about retaining walls: build one and you need both a Zoning Clearance and a Building Permit. Ordinary garden walls and fences mostly need neither, though one over 6 feet may. The hillside tracts have a second rule. Outside the Valley Floor, natural slopes of 20 percent or steeper may not be developed, with a narrow exception for a detached accessory dwelling of up to 800 square feet. Graded slopes that steep inside a homeowners association are the HOA's responsibility.

So before a wall goes in at the toe of a slope, find out whose slope it is. Once that is settled, we build retaining walls from your engineer's stamped plans, with the drain rock, pipe and weep holes (small openings that let water out from behind the wall) the plans call for. Our grading and hillside page covers the dirt work.

### Clay soil, liquefaction zones and keeping water off the slab

Ventura County's hazard guidelines say expansive soils, clay that swells when it takes on water and shrinks as it dries, are present through most of the county on low ground and hillsides alike. The same document notes that Simi Valley is affected by liquefaction at both its east and west ends. The city's Public Works engineers publish their own geotechnical guidelines, with sections on high groundwater areas and on soils that collapse when wetted.

For a homeowner that comes down to water control. Clay moves least when the moisture under a slab stays even, so runoff has to be collected and piped away instead of soaking in along the edge. We set area drains and channel drains, slope the flatwork to them and run solid pipe to an approved outlet. See drainage systems, and foundations for room additions and ADU slabs.

### Driveway approaches, parkway trees and the Public Works counter

The approach, the sloped piece of driveway that crosses the sidewalk to the curb, sits in the public right-of-way. The city's encroachment law covers placing or repairing curb, gutter, sidewalk and driveway there, and Public Works Development Services issues the encroachment permit through the city's online portal. Their number is (805) 583-6786. Street trees in the parkway may not be removed without Public Works approval, and mature native oaks and historic trees are protected on private lots, which matters when roots have lifted the concrete.

One more check: a Simi Valley mailing address does not always mean the City of Simi Valley. If the lot falls outside the city limits on the zoning map, Ventura County's Resource Management Agency is the permit office. We will sort out which office and which permit at the estimate. Send us a message to set one up, or read about our sidewalk and approach work.

### Simi Valley questions

**Do I need a permit for a retaining wall in Simi Valley?**
Yes. The city's Planning Division states that a retaining wall needs both a Zoning Clearance and a Building Permit. Most other residential walls and fences need neither unless they go over 6 feet. We will tell you at the estimate what your wall is likely to need, and we build from your engineer's stamped drawings.

**Who issues the permit to replace a driveway approach in Simi Valley?**
Public Works does. The approach and the sidewalk are in the public right-of-way, so the work needs an encroachment permit from Public Works Development Services, applied for through the city's Customer Self Service portal. The driveway on your own lot is a separate matter, and new front yard paving needs a Zoning Clearance from Planning.

**How far is Ikon Concrete Design from Simi Valley?**
About 24 miles. Our yard is in Sylmar and the drive is roughly 30 minutes on the 118 before traffic, which makes Simi Valley the closest Ventura County city to us. Estimates are free, and most jobs start about two weeks after the estimate is approved.

**Why do so many Simi Valley driveways break up and lift?**
Age and clay. Most of the city's homes were built between 1960 and 1989, and county hazard guidelines describe expansive clay soils across most of Ventura County. Clay swells when wet and shrinks when dry, and an old slab on a thin base moves with it. When we replace one, the base is recompacted, the joints are laid out with the new slab, and drainage is added to lead water away from the edges.

**Can I build a patio or wall on the slope behind my Simi Valley house?**
It depends on the slope and who owns it. Outside the Valley Floor the city does not allow development on natural slopes of 20 percent or more, apart from a small detached ADU, and graded slopes that steep inside an HOA are the association's responsibility. Call the Planning Division at (805) 583-6769 before you design anything, then call us for the hardscape itself.

## Concrete contractor in Thousand Oaks, CA

URL: [ikonconcrete.com/service-areas/thousand-oaks](https://ikonconcrete.com/service-areas/thousand-oaks)

We do concrete work in Thousand Oaks and Newbury Park. From our yard in Sylmar it is about 45 minutes and roughly 38 miles before traffic, west on the 118 and south on the 23 into the Conejo Valley, or out the 101 when that is moving better. Thousand Oaks has been its own city in Ventura County since 1964, with its own Building Division and Public Works engineers.

About a third of the city is set aside as open space, and the oaks it is named for are protected by ordinance, so a patio, driveway or wall here often starts with a tree question before a concrete one. We pour driveways, patios and pool decks, build block walls and install drainage. Ikon Concrete Design is family owned, and estimates are free.

- **County:** Ventura
- **Building department:** City of Thousand Oaks Building Division; Public Works for grading and encroachment permits
- **Typical home age:** Median year built 1978; one in three built in the 1970s (Census)
- **Terrain and soil:** Conejo Valley floor near 900 feet with hillside lots, clay soils and protected oaks
- **Common concrete work:** Driveways, patios, pool decks, block walls, drainage
- **Drive from our yard:** About 45 minutes (38 miles) by the 118 and the 23, before traffic
- **ZIP codes:** 91320, 91360, 91361, 91362
- **Neighborhoods:** Newbury Park, Dos Vientos, Westlake, North Ranch, Lang Ranch, Wildwood

### Oak trees: the 15 foot zone that moves patios and trenches

Thousand Oaks protects every species of oak with a trunk over 2 inches in diameter. Each tree has a protected zone that reaches 5 feet past the outer edge of its canopy or 15 feet from the trunk, whichever is greater, and the city requires a permit for any work that affects the tree or the soil inside that zone, apart from removing dead wood. Digging a footing, trenching a drain line and cutting grade for a slab all disturb that soil.

Larger California sycamores, black walnuts, bay laurels and toyons are protected as landmark trees too, except on single-family lots under two acres. If your project comes near a canopy, Planning staff at (805) 449-2323 can tell you whether an Oak/Landmark Tree Permit applies. We lay out forms, joints and pipe runs to stay outside the zone where the yard allows it, and we point out any tree that looks close when we walk the job at the estimate.

### Grading permits, the 25 percent slope rule and HOA sign-off

Public Works asks for a grading permit sooner than many owners expect. The city's brochure lists the triggers: moving more than 50 cubic yards of earth, importing or exporting more than 50, excavating deeper than 2 feet, raising a cut slope past 5 feet, placing fill more than a foot deep, or changing a drainage course. Digging for a pool or a retaining wall footing is handled under the building permit instead.

Natural slopes of 4 to 1 or steeper, which is 25 percent, cannot be graded without Planning Commission approval. The first item on the city's grading submittal list is written approval from your homeowners association, so if your home is in one, get that letter moving early. We do grading and hillside work and build retaining walls from your engineer's stamped plans.

### Conejo Valley clay, low-ground liquefaction and where runoff goes

Ventura County's hazard guidelines describe expansive clay soils across most of the county, on hillsides as well as flat ground, and they note that clay on a slope tends to creep downhill as it swells and shrinks. The same guidelines place some of the valleys in the Thousand Oaks area, and the Arroyo Santa Rosa below the Hill Canyon treatment plant, in the liquefaction hazard area. A soils engineer's report settles what is under a given lot.

The city's grading plan checklist asks for slopes that fall away from the building pad and for every drainage pattern and structure to be drawn. That is sound practice on any lot here, permit or not. We pitch flatwork away from the house, set area drains at the low spots and pipe the water to an approved outlet. See drainage systems and, for additions and ADU slabs, foundations.

### A 1970s city: original driveways, pool decks and the street edge

One home in three here was built in the 1970s, and about seven in ten between 1960 and 1989, with a Census median of 1978. Driveways and pool decks from those years are near or past 50. When panels have settled, broken up or lost their surface, we remove them, recompact the base and pour new, with the thickness set for the cars and trucks that will use it. A worn pool surround is a good place for a textured pool deck or stamped concrete.

Where the driveway meets the street the rules change. Building or repairing a sidewalk, curb, gutter or driveway in the public right-of-way needs an encroachment permit from the City Engineer, and the city's road standards set the residential driveway design. We will tell you at the estimate whether your job reaches into the right-of-way.

### Thousand Oaks questions

**Can I pour a patio or driveway near an oak tree in Thousand Oaks?**
Often yes, but not without checking first. The protected zone runs 5 feet beyond the canopy or 15 feet from the trunk, whichever is greater, and the city requires a permit for work that affects the tree or the soil inside it. Call the Planning staff at (805) 449-2323 before the design is final. We can usually shift an edge or a joint line to keep the concrete outside the zone.

**Do I need a grading permit for a new patio or driveway in Thousand Oaks?**
It depends on how much dirt moves. The city requires a grading permit when a job moves, imports or exports more than 50 cubic yards, digs deeper than 2 feet, places more than a foot of fill or changes a drainage course. Replacing a slab at the same grade may stay under those lines, while a new terrace cut into a slope may not. We will tell you at the estimate which way your job falls.

**Does my HOA have to approve concrete work in Thousand Oaks?**
If the job needs a grading permit, yes: the city asks for written approval from your homeowners association before it takes in the plans. For smaller work, read your association's rules on driveways, walls and finishes, since they are separate from the city's. Ask us to put the scope in writing so the board can see what is proposed.

**How far do you travel to reach Thousand Oaks and Newbury Park?**
About 38 miles and 45 minutes from our Sylmar yard before traffic, with Newbury Park a few minutes farther west. We do not charge for the estimate, and work usually starts about two weeks after you approve it. Send us a message with your address and a short description of the job.

**Who issues the permit for a sidewalk or driveway approach in Thousand Oaks?**
The City Engineer does. The municipal code makes it unlawful to build or place a sidewalk, curb, gutter or driveway in the public right-of-way without an encroachment permit. Work that stays on your own lot goes through the Building Division, or needs no permit at all for ordinary flatwork. Our concrete sidewalks page covers the work itself.

## Concrete contractor in Moorpark, CA

URL: [ikonconcrete.com/service-areas/moorpark](https://ikonconcrete.com/service-areas/moorpark)

We do concrete work in Moorpark, which sits where the 118 freeway ends and meets the 23. From our yard in Sylmar that is about 40 minutes and 33 miles before traffic, all of it on the 118. Moorpark became a city on July 1, 1983, and City Hall at 323 Science Drive handles building permits and Public Works permits alike.

Most of the housing is younger than the city. The Census puts the median home at 1987, and about four in ten were built in the 1980s alone. Yards that age usually have sound driveways and thin builder patios, so the calls lean toward bigger patios, pool decks, stamped concrete and walls that make a sloped yard usable. Ikon Concrete Design is family owned and has been in business since 1999.

- **County:** Ventura
- **Building department:** City of Moorpark Building and Safety; Public Works for encroachment permits
- **Typical home age:** Median year built 1987; about 42% built in the 1980s (Census)
- **Terrain and soil:** Arroyo Simi valley floor with flatlands and mesas below the hills; expansive clay
- **Common concrete work:** Patios, pool decks, stamped concrete, retaining and block walls, drainage
- **Drive from our yard:** About 40 minutes west on the 118 (33 miles), before traffic
- **ZIP codes:** 93021
- **Neighborhoods:** Downtown and High Street, Peach Hill, Mountain Meadows, Campus Park, Moorpark College area, Moorpark Country Club area

### Moorpark's 3 foot rule for retaining walls

Many cities let you build a retaining wall up to 4 feet without a building permit. Moorpark's list of exempt work stops at 3 feet, measured from the bottom of the footing to the top of the wall, and only when the wall carries no surcharge. The city spells that word out: the wall may not be holding up a slope, a driveway or a structure. A footing takes up part of those 3 feet, so the exposed face of an exempt wall is lower still.

In a town built on mesas and cut pads, most walls worth building are holding up a slope. Plan on a permit and on engineered drawings, and we will build the retaining wall from them, with the drain rock and pipe behind it that the plans call for. Property line fences and garden walls up to 6 feet tall are on the exempt list. See block walls for how we build those.

### Tracts built after 1980: thin patios, good bones

More than three quarters of Moorpark's homes were built after 1980, as Peach Hill, Mountain Meadows and the neighborhoods near Moorpark College filled in. The population went from just over 4,000 in 1980 to more than 25,000 by 1990. Concrete from those years is often fine structurally and simply too small or too plain for how the yard is used now.

That shapes the work. We add onto patios, or take out a builder slab and pour one that fits a cover, a kitchen island or a fire pit. A new slab can be broom finished, colored, or stamped and sealed. The city exempts driveways and walkways from a building permit as long as they sit no more than 30 inches above grade and do not cross a basement, though zoning rules still apply. Our decorative concrete page shows the finishes.

### Mesas, the Arroyo Simi and fire zone rules

Central Moorpark lies in the valley of the Arroyo Simi, with neighborhoods on flatlands and mesas at the foot of the hills. Ventura County's hazard guidelines describe expansive clay through most of the county, note that clay on a slope tends to creep downhill, and place landslide and debris flow risk on hillsides and on the ground just below them, with brush fires listed as a cause.

Two things follow for a yard here. Water has to be collected and piped to an approved outlet instead of running over the top of a slope, which is the job of our drainage systems. And the city reminds owners that work exempt from a building permit still has to meet its High Fire Zone restrictions. Concrete and block do not burn, which is one reason they suit the edge of a lot that faces open hillside. Our hardscape page covers seat walls, steps and fire features.

### Driveway approaches and work in the street

Los Angeles Avenue, the main road through town, is State Route 118, and Old Town sits just north of it around High Street. Wherever your street is, the driveway approach, curb and sidewalk belong to the public right-of-way. Moorpark's Public Works Department issues encroachment permits for work there under Chapter 12.04 of the municipal code, which has its own section on driveway requirements.

On your side of the property line, the driveway's base, thickness and steel are set for the lot and for what will sit on it, whether that is a pickup or a loaded horse trailer. We will tell you at the estimate whether the job touches the right-of-way. Read more on our concrete driveways page, or send us a message with your address to set up a visit.

### Moorpark questions

**How tall can a retaining wall be in Moorpark without a permit?**
Three feet, measured from the bottom of the footing to the top of the wall, and only if it carries no surcharge. Moorpark defines that as not holding up a slope, a driveway or a structure. Most useful walls on a sloped lot fail that test, so expect a building permit and engineered plans.

**Do I need a permit to pour a patio or driveway in Moorpark?**
Usually not a building permit. The city exempts driveways and walkways that are no more than 30 inches above grade and do not cross over a basement. Zoning rules and High Fire Zone restrictions still apply, and work on the approach in the public right-of-way needs an encroachment permit from Public Works.

**Who do I call at the city about a concrete project in Moorpark?**
Building and Safety is at (805) 517-6272, and City Hall's main line is (805) 517-6200. Both are at 323 Science Drive. We will tell you at the estimate which office your job is likely to involve.

**How far is Moorpark from your yard?**
About 33 miles. The drive from Sylmar is roughly 40 minutes on the 118 before traffic, a little past Simi Valley. The estimate costs nothing, and jobs generally start about two weeks after approval.

**What concrete work makes sense on a sloped Moorpark backyard?**
Start with the water, then the walls, then the flat surfaces. A drain line and a properly engineered retaining wall create level ground, and the patio or pool deck goes on that. Building them in the other order can mean tearing up new concrete later to get the drain and the wall in.

## Concrete contractor in Camarillo, CA

URL: [ikonconcrete.com/service-areas/camarillo](https://ikonconcrete.com/service-areas/camarillo)

We do concrete work in Camarillo, and we want to be straight about the distance. It is close to an hour from our Sylmar yard before traffic, 45 to 50 miles depending on whether the 118 and the 23 or the 101 is moving. For that reason we take Ventura County projects selectively by size: a full driveway, a patio and walkway package, a pool deck or a run of wall, more than a single small repair.

Camarillo has been its own city since 1964 and sits in Pleasant Valley at the eastern end of the Oxnard Plain, about 177 feet above sea level. The ground is flat and the weather is easy on fresh concrete. What the plain lacks is firm, dry soil, and that is where the planning goes. Start with our driveways, patios and drainage pages, or tell us about the job.

- **County:** Ventura
- **Building department:** City of Camarillo Building and Safety; Public Works for encroachment permits
- **Typical home age:** Median year built 1982; 27% built in the 1970s (Census)
- **Terrain and soil:** Flat Pleasant Valley floor on the Oxnard Plain; liquefaction hazard area; expansive clay
- **Common concrete work:** Driveways, patios, stamped and stained concrete, drainage
- **Drive from our yard:** About 55 minutes (45 to 50 miles), before traffic; select projects
- **ZIP codes:** 93010, 93012
- **Neighborhoods:** Old Town, Mission Oaks, Leisure Village, Springville, Spanish Hills, Village at the Park

### Soil on the plain: liquefaction zones, clay and slow settling

Ventura County's hazard guidelines say the liquefaction hazard exists generally throughout the Oxnard Plain and Pleasant Valley, which is to say under most of Camarillo. The same document names the plain as one of the places where ground shaking is amplified most, lists it among the areas where groundwater pumping has contributed to subsidence, and describes expansive clay through most of the county.

None of that stops anyone from pouring a driveway. It does mean the base matters more than the finish. Where a site calls for it, we dig out soft or organic material, bring in base rock, compact it in lifts and add steel to the slab, with the base and steel set for that lot. An addition or an ADU needs an engineered foundation on ground like this, and we form and pour the foundation to your engineer's stamped plans.

### A mild climate that is kind to a pour

Camarillo's climate records show no month with an average temperature above 72 degrees. Compare that with a July afternoon in the San Fernando Valley, where the heat sets the pace of the finishing. Out here the concrete usually sets at a steadier pace, which gives the finishers time to work a stamp pattern or a hard trowel finish.

It is a good setting for decorative work that needs unhurried finishing: stamped concrete, colored concrete and stained patios. Morning dew and overcast slow the drying of sealers and stains, so the wait between coats follows the product maker's directions for that weather, which here is often longer than inland.

### From Leisure Village to newer tracts: what the housing asks for

The Census puts the median Camarillo home at 1982. About 27 percent of the housing went up in the 1970s, the decade Leisure Village opened as a retirement community in 1973, and another 20 percent in the 1980s. More than a fifth has been built since 2000 in neighborhoods such as Springville.

Older homes here tend to need replacement: driveways and walks that have settled unevenly on soft ground, and trip edges that matter more in a community of retirees. If you live in an association, get its approval for the finish and layout before we schedule. Newer homes more often want additions to what the builder left: a wider patio, a side yard walk, pads with turf joints. Our concrete sidewalks and resurfacing pages cover the smaller end of that, which we take on as part of a larger job.

### Permits in Camarillo: two city counters, and the county outside the limits

Inside the city limits, the Building and Safety Division issues building permits, and the city's own grading checklist says retaining walls are permitted there. Work that reaches the sidewalk, curb or street falls to Public Works, which issues encroachment permits with a standard set of conditions. If a yard drain would discharge through the curb, ask Public Works first.

Not every Camarillo address is in the city. Lots on unincorporated land answer to Ventura County's Resource Management Agency instead, so check which one you are in before you call for a permit. We will tell you at the estimate whether your job is likely to need one. Flat lots still need a plan for water, and on ground this level the slab has to be pitched on purpose, usually toward an area drain. See drainage systems.

### Camarillo questions

**Does Ikon Concrete Design take jobs in Camarillo?**
Yes, selectively. Camarillo is close to an hour from our Sylmar yard, so we take projects there that are large enough to justify moving a crew and equipment for several days. Send the scope and a few photos and we will tell you honestly whether it is a fit.

**Is the soil in Camarillo a problem for concrete?**
It needs respect more than worry. County hazard guidelines place the Oxnard Plain and Pleasant Valley in the liquefaction hazard area and describe expansive clay across most of the county. For flatwork that means a well compacted base, steel in the slab and good drainage. For a structure it means an engineered foundation.

**Who issues permits for concrete work in Camarillo?**
The City of Camarillo's Building and Safety Division handles building permits, including retaining walls, and Public Works handles encroachment permits for work in the street or sidewalk area. Addresses outside the city limits go through Ventura County. We will tell you at the estimate what your job is likely to need.

**How long is the drive from your yard to Camarillo?**
About 55 minutes without traffic, and 45 to 50 miles depending on the route. We go out the 118 and down the 23 to the 101, or stay on the 101 through the Conejo Valley and down the grade. The estimate is free either way.

**Is Camarillo's weather good for stamped or stained concrete?**
Yes. With no month averaging above 72 degrees, the surface usually stays workable longer than it does inland, which helps with stamping and hand finishing. Damp mornings slow sealers and stains, and we space those coats by the maker's timing for the weather on the day.

## Concrete contractor in Ventura, CA

URL: [ikonconcrete.com/service-areas/ventura](https://ikonconcrete.com/service-areas/ventura)

We do concrete work in Ventura, the longest drive in our service area. From our yard in Sylmar it is about 60 miles and 70 to 75 minutes before traffic, north on the 5 and west on the 126 through Santa Paula, or out the 118 and the 101. Because of that we take Ventura projects selectively: foundations, wall and drainage packages, full driveways and larger decorative jobs that keep a crew busy for days.

The city's legal name is San Buenaventura, and it has been incorporated since 1866. Its own Building and Safety Division issues the permits. The work divides by terrain: steep lots in the foothills above downtown, flat lots on the coastal plain to the east, and beach neighborhoods such as Pierpont where salt is part of the weather. See foundations, retaining walls and decorative concrete.

- **County:** Ventura
- **Building department:** City of San Buenaventura (Ventura) Building and Safety Division
- **Typical home age:** Median year built 1973; about half built in the 1950s to 1970s (Census)
- **Terrain and soil:** Foothills above downtown, flat coastal plain to the east, river alluvium; salt air near the beach
- **Common concrete work:** Foundations, retaining walls, hillside drainage, driveways, decorative flatwork
- **Drive from our yard:** About 70 to 75 minutes (60 miles), before traffic; select projects
- **ZIP codes:** 93001, 93003, 93004
- **Neighborhoods:** Downtown, Midtown, Westside, Pierpont, Hobson Heights, Hillsides, College, Montalvo, Juanamaria, Saticoy

### After the Thomas Fire: rebuilds on the hillsides

The Thomas Fire started near Santa Paula in December 2017 and was driven by Santa Ana winds into Ventura's hillside neighborhoods and the area above downtown. It destroyed 504 residences inside the city. By November 2025 the city counted 404 of those homes rebuilt and approved for occupancy, 31 under construction and 18 still in plan review. The rebuild overlay zone that had eased fees and standards expired at the end of 2025, so applications now follow the regular zoning rules.

For the lots that remain, and for neighbors improving what survived, the concrete scope is usually the same list: a new or repaired foundation, retaining walls that hold the pad, and drainage that carries water off the slope. We build all three from the engineer's stamped plans and coordinate with your general contractor. Our foundations page explains the sequence from forms to pour.

### Foothill lots: slides, debris flow and walls that drain

Ventura County's hazard guidelines say landslide and debris flow hazards potentially exist on all hillside areas and the ground just downslope of them, and they list brush fires, erosion, groundwater and earthquake shaking as contributing causes. They also note that expansive clay on a slope tends to work its way downhill as it swells and shrinks. A burned hillside above a house brings several of those together.

That is why a retaining wall here is a drainage structure as much as a wall. Behind it go drain rock and a perforated pipe that daylights or ties into solid pipe, and at the surface a concrete swale or drains collect runoff headed for the top of the wall. We build retaining walls and drainage systems to the engineer's details, and we do the grading and hillside work that goes with them.

### Salt air near the beach and what it does to steel

Sea breezes off the Pacific keep Ventura mild, with average highs near 71 degrees and lows near 51. They also carry salt. Chlorides that soak into concrete attack the reinforcing steel, and rusting steel swells and damages the concrete around it. Close to the water, in Pierpont and along the harbor side of town, that process moves faster than it does a few miles inland.

Near the beach the mix, the cover over the steel, the curing and the sealer are all chosen with that exposure in mind, and a penetrating sealer needs renewing on the timing its maker recommends. On a wall or a structural slab the engineer specifies the mix and the cover. On flatwork, tell us how close you are to the beach and we will plan and price the job with that in mind. Our driveways page covers the basics.

### The coastal plain and the rivers: flat lots, soft ground

East of downtown the city spreads across a flat coastal plain, with the Ventura River on the west side and the Santa Clara River along the southern boundary. County guidelines extend the liquefaction hazard area up both rivers through the alluvial ground, and the Census puts the median home at 1973, with about half the housing built in the 1950s, 1960s and 1970s in Midtown, Montalvo and the east end.

Flatwork of that age on alluvial soil has usually settled unevenly. Replacement starts with removing the old slab, cutting out soft spots and compacting new base before any forms go down. Many owners use the chance to upgrade to stamped concrete or a colored finish. For a job of that size in Ventura, send us a message with photos and rough dimensions so we can tell you quickly whether it is one we can take.

### Ventura questions

**Does Ikon Concrete Design work in Ventura?**
Yes, on select projects. Ventura is about 60 miles from our Sylmar yard, so we take jobs there that are big enough to keep a crew on site for several days, such as foundations, retaining walls with drainage, or a full driveway. Send us the scope and we will tell you plainly whether it fits.

**Can you pour the foundation for a Thomas Fire rebuild?**
Yes. We form and pour foundations and retaining walls from the engineer's stamped plans and work under your general contractor or directly for an owner-builder. The city's rebuild overlay zone expired on December 31, 2025, so plans submitted now are reviewed under the standard rules. Ask the city's Building and Safety Division where your permit stands before you schedule concrete.

**Does salt air really damage concrete in Ventura?**
It can, mainly through the steel inside it. Chlorides from salt spray work into the concrete, and the rebar corrodes and expands. The mix, the cover over the steel and a sealer kept up on its maker's schedule all count for more within a few blocks of the beach, and on structural work the engineer sets them.

**Who issues building permits in Ventura?**
The City of San Buenaventura, through its Building and Safety Division, for addresses inside the city limits. Unincorporated areas nearby go through Ventura County's Resource Management Agency. We will tell you at the estimate whether your job is likely to need a permit.

**How long does it take you to get to Ventura?**
About 70 to 75 minutes without traffic. The usual route is the 5 north to the 126 and in through Santa Paula, the same road that passes Santa Clarita. It is the longest drive we make, which is why job size matters here.

## Concrete contractor in Acton, CA

URL: [ikonconcrete.com/service-areas/acton](https://ikonconcrete.com/service-areas/acton)

We do concrete work in Acton, about 31 miles from our yard in Sylmar. The route is the 14 north through Santa Clarita to Crown Valley Road, close to 40 minutes without traffic.

Acton is unincorporated ranch country between the Sierra Pelona and the San Gabriel Mountains, at about 2,710 feet. Homes are spread thin: roughly 2,850 of them over 39 square miles, nine in ten detached houses, many with stables and arenas. Los Angeles County issues the permits, and its Acton Community Standards District protects the rural and equestrian character of the place. The concrete that fits is driveways and parking courts, slabs for barns and equipment, retaining walls and drainage. Ikon Concrete Design is a family owned crew of eight, and we have been at this since 1999.

- **County:** Los Angeles (unincorporated)
- **Building department:** Los Angeles County Public Works, Building and Safety, with zoning by Regional Planning
- **Typical home age:** Median year built 1986. Nine in ten homes are detached houses
- **Terrain and soil:** High desert valley and foothills at about 2,710 feet, on lots of an acre and up
- **Common concrete work:** Driveway sections and aprons, barn and equipment slabs, retaining walls, drainage
- **Drive from our yard:** About 31 miles, close to 40 minutes up the 14
- **ZIP codes:** 93510
- **Neighborhoods:** Crown Valley Road, Soledad Canyon Road, Escondido Canyon Road, Vincent, Parker Mountain, Acton town center

### The county caps how much of an Acton lot can be paved

Acton has a rule most places do not: a limit on impervious surface. Under the Acton Community Standards District, residential lots of three net acres or more may have no more than 10 percent of their area covered by hard surfaces. Lots between one and a quarter and three net acres are held to 21 percent or 13,000 square feet, whichever is smaller, and smaller lots to 42 percent or 11,000 square feet. Roofs count along with concrete.

So a new driveway, a parking court or an arena apron starts with arithmetic. We measure what is already covered before we lay out more. The standards give credit for partly pervious paving, such as blocks that let plants grow through, on private patios and driveways, and they want roof gutters emptied onto ground that soaks water up, not onto pavement. The Department of Regional Planning decides how the limits apply to a given project, so ask before the design is fixed.

### Open fences on the perimeter, block where it holds something up

A solid block wall around the property line is generally not allowed on an Acton lot of 10,000 square feet or more. The standards call for split rail, open wood, wire, wrought iron or a similar open style on the perimeter, with at least 70 percent of the fence area left see-through. Solid sections are meant to be structural or a minor design feature, which is where masonry comes in: pilasters at a gate, a short entry wall, a base course under rail.

Inside the lot, block walls and retaining walls do the heavy work of holding a pad, a corral or a driveway cut. The county's permit line for a retaining wall is 4 feet from the bottom of the footing, and lower than that if the wall carries a surcharge such as a slope, a vehicle or livestock pens above it. Engineered walls are built from the engineer's stamped plans.

### Long driveways and roads with no curb

Acton's streets are built without sidewalks, curbs or gutters by design. The standards say they will generally not be required on local streets and call for inverted shoulders, a paved edge that carries runoff, in new land divisions. New residential lots have to be at least an acre gross. Put together, that means long private driveways meeting a road edge with no curb.

Few owners pave the whole run in concrete, and the paving limit often would not allow it. Concrete earns its cost on the steep pitches where gravel washes out, at the apron where the drive meets the road, and at the court in front of the garage where trucks and trailers turn. Thickness and steel in those sections are set for the loads on that property, and a grade usually gets a rough broom finish to give tires and hooves more grip. Where the drive ties into a county road, the work in the right of way needs a road permit.

### Barn slabs, frost and homes from the 1980s

Most Acton homes went up in the 1980s. Census estimates put the median year built at 1986, with 38 percent of homes from that decade and another fifth from 2000 to 2009. Original flatwork around those houses is 20 to 45 years old. Horse property adds work a tract lot never has: slabs for barns, tack rooms and hay storage, wash areas that drain, and aprons at gates. The county exempts a noncombustible livestock shelter of up to 300 square feet, open on three sides, from a building permit.

The climate is high desert. The nearest long-term NOAA station, Palmdale Airport about 8 miles north, averages roughly 54 nights a year at or below freezing and 36 days at 100 or hotter. So pour days are planned around the weather in both seasons, and we slope a slab to shed water instead of holding it.

### Acton questions

**Is there a limit on how much concrete I can pour on my Acton property?**
Yes. The Acton Community Standards District caps impervious surface at 10 percent of a residential lot of three net acres or more, with higher percentages and square foot caps for smaller lots. Buildings count toward the total. Check your numbers with the county's Department of Regional Planning before sizing a driveway or pad.

**Can I build a block wall around my Acton lot?**
Usually not as a solid perimeter wall. On lots of 10,000 square feet or more the standards require open-style perimeter fencing that is at least 70 percent see-through. Block still has a place in pilasters, entry features and retaining walls inside the lot. We will go over what the rules allow when we walk the property.

**Who issues permits in Acton?**
Los Angeles County. Acton is unincorporated, so building permits come from the Building and Safety Division of Public Works, and the community standards are administered by Regional Planning. A driveway connection in a county road right of way takes a road permit from Public Works.

**How long does it take you to get to Acton?**
Close to 40 minutes. It is about 31 miles from 13430 Dyer Street in Sylmar, almost all of it on the 14, with Crown Valley Road as the usual exit. Estimates are free, and you can message us with the address and what you have in mind.

**Should a long rural driveway be all concrete?**
Not necessarily. Concrete matters most on steep sections, at the road apron and where vehicles turn and park. The flatter runs between can stay gravel or another surface, which also helps with the county's paving limit. Our driveways page covers thickness, base and joints.

## Concrete contractor in Agua Dulce, CA

URL: [ikonconcrete.com/service-areas/agua-dulce](https://ikonconcrete.com/service-areas/agua-dulce)

We do concrete work in Agua Dulce, halfway between Santa Clarita and Palmdale. From our Sylmar yard we run up the 14 and come in by Agua Dulce Canyon Road, about 24 miles and 30 to 35 minutes without traffic.

Agua Dulce is unincorporated and means to stay rural. Los Angeles County's standards for the community set out to limit paved local streets, concrete sidewalks and concrete flood channels, and to protect Vasquez Rocks, the hillsides and the trails, the Pacific Crest Trail among them. About 1,165 homes sit on nearly 23 square miles. On lots like that we pour driveway approaches and steep sections, slabs for garages, barns and shops, retaining walls and the drainage that helps keep a dirt road from washing out. Ikon Concrete Design is family owned, and Gilbert Rico looks at every site before pricing it.

- **County:** Los Angeles (unincorporated)
- **Building department:** Los Angeles County Public Works, with the Agua Dulce Community Standards District on top
- **Typical home age:** Median year built 1982. 96 percent of homes are detached houses
- **Terrain and soil:** Rock outcrops, hillsides and washes at about 2,500 feet
- **Common concrete work:** Driveway approaches and steep sections, shop and barn slabs, retaining walls, drainage
- **Drive from our yard:** About 24 miles, 30 to 35 minutes by the 14
- **ZIP codes:** 91390
- **Neighborhoods:** Vasquez Rocks, Agua Dulce Canyon Road, Darling Road, Davenport Road, Escondido Canyon Road, Agua Dulce Airpark

### Driveway approaches: an encroachment permit and a rough broom finish

Agua Dulce is the one place we work where the zoning code names the finish. Under the Agua Dulce Community Standards District, a driveway that crosses the highway or street right of way to reach the pavement needs an encroachment permit from Public Works, and it has to be built with a non-slip surface. The code's own example is rough-broomed concrete.

That suits the place. A heavy broom texture gives tires grip on a grade and gives a shod horse better footing than a smooth trowel finish. Public Works also looks at whether an approach blocks people and horses moving along the road edge, because the right of way here doubles as a path. We form the approach to the county's permit, set its thickness for the trucks and trailers that will use it, and pull the broom across the slope.

### No new curbs, gutters or sidewalks, so the water needs a plan

County-maintained local streets in Agua Dulce use an inverted shoulder and 28 feet of pavement, and new curbs, gutters and sidewalks are prohibited unless Public Works finds them necessary for safety. With no curb to steer it, runoff follows the shoulder and whatever low ground it finds, including a driveway cut.

On a rural lot most of our drainage work is about protecting the driveway and the building pad. A swale or a concrete cross gutter can turn water off the drive before it gains speed, a culvert can carry the roadside flow under the approach, and area drains catch water at a garage apron. The county's grading rules add one caution: even a small fill loses its permit exemption if it obstructs a drainage course. See how we build drainage systems before the dirt and the slab cover the pipe.

### About 1,165 homes on 23 square miles, many from the 1980s

Agua Dulce is thinly built and almost all single-family. Census estimates count about 1,165 housing units, 96 percent of them detached houses and close to nine in ten owner occupied. The median year built is 1982. About 36 percent of homes date from the 1980s, and a sixth go back to the 1950s.

On a ranch property that old, concrete has often been added in stages: a patio one decade, a shop slab the next, a driveway that stops short of the road. The job can be tying those pieces together or replacing the ones that failed, starting with demolition where a slab has broken up. New work tends to be larger than in town: a pad for a shop or a horse barn, a parking area for trailers, a long walk between buildings. Each one is sized for what will park or stand on it.

### County permits for walls, pads and grading near the rocks

There is no city building department here. Permits come from Los Angeles County Public Works, and its exemptions are short: a retaining wall up to 4 feet from the bottom of its footing with no surcharge, a walk or driveway within 30 inches of grade, and a cut of 50 cubic yards or less that stays shallow. A pad benched into a hillside for a barn or a shop usually goes past all three, so it starts with a grading plan.

The community standards name what the county wants left alone: floodplains, hillsides, ridgelines, rock outcroppings and the land around Vasquez Rocks Natural Area Park. If your site has any of those, expect questions from Regional Planning before Building and Safety. We do the grading and hillside work and the walls from the approved plans, and we will tell you at the estimate which approvals your project is likely to need.

### Agua Dulce questions

**Do I need a permit for a driveway approach in Agua Dulce?**
Yes, for the part that crosses the road right of way. The Agua Dulce Community Standards District requires an encroachment permit from Los Angeles County Public Works for a driveway from the property line to the paved road. It also requires a non-slip surface such as rough-broomed concrete.

**Why are there no sidewalks or curbs in Agua Dulce?**
Because the county's standards for the community prohibit new ones on local streets unless Public Works decides they are needed for safety. The stated aim is to keep urban infrastructure, concrete sidewalks included, from changing the rural character. For a homeowner it means roadside runoff has to be handled at the driveway.

**How far is Agua Dulce from your yard in Sylmar?**
About 24 miles, which is 30 to 35 minutes when the 14 is clear. Lots off Davenport Road or Escondido Canyon Road can add ten minutes on local roads. Long dirt driveways are fine for an estimate visit, and we check truck and pump access while we are there.

**Can a concrete truck get up a long dirt driveway?**
Often, but not always. It depends on the width, the grade, the turns and whether the surface will carry a loaded truck. Where a truck cannot reach, the concrete is pumped through a hose line or moved in smaller loads, which adds cost. We look at access first on every rural job, so tell us about the site.

**Do I need a permit to grade a pad for a barn or shop in Agua Dulce?**
In most cases, yes. The county exempts only small grading, such as a cut of 50 cubic yards or less that is under 2 feet deep, and a fill may not block a drainage course. A benched pad on a slope is almost always more than that. We build from the approved grading plan.

## Concrete contractor in Palmdale, CA

URL: [ikonconcrete.com/service-areas/palmdale](https://ikonconcrete.com/service-areas/palmdale)

We do concrete work in Palmdale, about 42 miles up the 14 from our yard in Sylmar. With no traffic the drive to the civic center takes roughly 50 minutes, and Rancho Vista and the west side run closer to an hour. In summer we usually leave early, so the pour can start before the heat builds.

Palmdale sits on the high desert floor at about 2,650 feet, on the far side of the San Gabriel Mountains from Los Angeles. Summer afternoons average close to 98 degrees, and December nights average just below freezing. Most of the housing is tract homes built since 1980. Our work here follows from that: driveways and patios planned around desert weather, property line block walls, and foundations for additions and ADUs. Ikon Concrete Design is family owned, and this is our 27th year in the trade.

- **County:** Los Angeles
- **Building department:** City of Palmdale Building & Safety Division
- **Typical home age:** Median year built 1989. About a third of homes date from the 1980s
- **Terrain and soil:** High desert floor at about 2,650 feet, with foothills and the San Andreas Fault to the south
- **Common concrete work:** Driveway replacement, patio slabs, property line block walls, foundations
- **Drive from our yard:** About 42 miles, roughly 50 minutes up the 14
- **ZIP codes:** 93550, 93551, 93552, 93591
- **Neighborhoods:** Rancho Vista, Anaverde, Ritter Ranch, Joshua Ranch, West Palmdale, East Palmdale, Central Palmdale

### About 36 days over 100 degrees and more than 50 freezing nights

Palmdale's weather is a big part of planning any pour. NOAA's 1991 to 2020 normals for Palmdale Airport show average highs of 97.6 degrees in July and 97.7 in August, about 36 days a year at 100 or hotter, and only 5.9 inches of rain. In summer we usually schedule pours for early in the day, and how a slab is cured is worked out for the heat and the site.

Winter is the other half. The same normals show an average December low of 31.6 degrees and roughly 54 nights a year at or below freezing. The City's residential code sets the frost line at 12 inches. From late fall on, we watch the overnight forecast and pick pour days around it.

### Block walls up to 6 feet without a building permit, and the desert wind

Palmdale is more generous with walls than most cities we work in. Its building code exempts block walls and pilasters up to 6 feet from a building permit, where the Planning Division allows the wall and the lot is outside a flood hazard area. Santa Clarita, for comparison, draws that line at 42 inches. The Planning Division still decides where a wall is allowed, so check the zoning before the layout is final.

No permit does not mean no engineering. The same code sets a design wind speed of 95 miles an hour for houses here, and a solid 6 foot wall on an open desert lot takes the wind broadside. The footing, the vertical steel and the grout carry that load, and that is where the time goes on a block wall. Retaining walls are stricter. The exemption stops at 4 feet from the bottom of the footing, and it does not apply when the wall holds a slope or a surcharge.

### A city that grew more than fivefold in the 1980s

Most Palmdale concrete dates from one long building boom. The census counted 12,277 residents in 1980, 68,842 in 1990 and 116,670 in 2000. Current estimates put the median year built at 1989. About a third of all homes went up in the 1980s and another four in ten between 1990 and 2009, and nearly eight in ten are detached houses.

A driveway poured with a 1986 tract house is 40 years old. Four decades of desert sun, cold nights and parked trucks can leave broken panels, a sunken strip at the garage and chipped edges where tires leave the slab. Patching rarely lasts on concrete that has moved, so the job is usually demolition, fresh compacted base and a new pour. Platforms, walks and driveways no more than 30 inches above grade need no building permit in Palmdale. Newer tracts such as Anaverde are more likely to want a first patio or a wider driveway.

### The San Andreas Fault on the south edge of town

The San Andreas Fault runs along the south side of Palmdale. It crosses the 14 just north of the Avenue S off-ramp and follows Elizabeth Lake Road west toward Leona Valley. The City's building code does not allow a building on the trace of a known active fault. Within 50 feet of the mapped line, the city engineer or a geologist has to show the trace is not under the building, and the City can require a trench at least 5 feet deep to prove it.

Near the fault, the order of work on an addition or an ADU is geology first, plans second, concrete third. Grading has rules of its own. A grading permit comes from the City Engineer and requires a geotechnical report, and the permit holder may not let dust stay visible in the air past the property line. On foothill lots toward Ritter Ranch that usually means watering the dirt while the grading is under way.

### Palmdale questions

**Do I need a permit to build a block wall in Palmdale?**
Not for a wall up to 6 feet, in most cases. Palmdale's building code exempts block walls and pilasters that are not over 6 feet where the Planning Division allows them and the lot is not in a flood hazard area. Taller walls need a permit, and a retaining wall needs one above 4 feet or whenever it holds a slope. We will tell you at the estimate which rule applies to yours.

**Will freezing weather damage a concrete driveway in Palmdale?**
Cold is hardest on a slab that holds water. Palmdale averages about 54 nights a year at or below freezing, and water left sitting on concrete freezes there. So the fall of a driveway is planned when the forms are set, with the aim of sending water toward the street instead of leaving it in low spots.

**Do you really come up to Palmdale from Sylmar?**
Yes. The Antelope Valley is part of our service area, and Palmdale is about 42 miles and roughly 50 minutes from our yard by the 14. We open at 6 AM, which suits the early summer starts we usually plan up here. Estimates are free, and you can send us the details to get one scheduled.

**Can I build an ADU near the San Andreas Fault in Palmdale?**
Not on the fault trace itself. The City's code bars buildings over a known active fault, and within 50 feet of the mapped line it requires the city engineer or a geologist to confirm the trace is absent, sometimes by trenching. Once the City approves the plans, we form and pour the foundation from them.

**What time of year is best for pouring concrete in Palmdale?**
Spring and fall are the easiest. Average highs run in the upper 90s in July and August and average lows drop below freezing in December, so summer and winter pours need more planning. Summer work usually goes in early in the day, and winter work is scheduled around the overnight forecast. We pour all year, and every job gets its own schedule.

## Concrete contractor in Lancaster, CA

URL: [ikonconcrete.com/service-areas/lancaster](https://ikonconcrete.com/service-areas/lancaster)

We do concrete work in Lancaster, the far end of our Antelope Valley runs. From our yard in Sylmar it is about 51 miles, nearly all of it on the 14, and a little over an hour when the freeway is clear.

Lancaster is flat, high and dry. The valley floor sits at about 2,360 feet, winter nights freeze more often here than in Palmdale, and summer afternoons average in the upper 90s. The housing runs from 1950s streets near downtown to tracts built since 2000. For homeowners that means driveway replacement and widening, patio slabs, block walls on the property line, and sidewalk and walkway work. We are a family owned concrete company with a crew of eight, and the estimate is free.

- **County:** Los Angeles
- **Building department:** City of Lancaster Building and Safety, with permits through the City's Accela portal
- **Typical home age:** Median year built 1986, with 1950s and 1960s homes near downtown
- **Terrain and soil:** Flat high desert valley floor at about 2,360 feet
- **Common concrete work:** Driveway replacement and widening, patio slabs, block walls, RV pads
- **Drive from our yard:** About 51 miles, a little over an hour up the 14
- **ZIP codes:** 93534, 93535, 93536
- **Neighborhoods:** Downtown Lancaster, The BLVD, Old Town, West Lancaster, East Lancaster, Fox Field

### Fences under 7 feet need no building permit, but Planning sets the height

Lancaster splits wall rules between two counters. Building and Safety says it does not require permits for residential fences less than 7 feet tall. The zoning code sets how tall a fence or wall may be: 4 feet inside the front yard setback and 6 feet along the side and rear yards, with up to 25 percent more possible through a director's review. A fence or wall also has to sit behind the property line and any utilities, or at least 12 feet back from the face of the curb.

Block is the usual material here for a reason. The zoning code requires new production homes, meaning subdivisions of three lots or more, to be fenced with a masonry wall up to 6 feet along the side and rear yards. A damaged section is normally rebuilt in block to match. We lay block walls on a poured footing with vertical steel and grouted cells. Retaining walls are a separate matter: over 4 feet from the bottom of the footing, or with a surcharge behind them, they need a building permit.

### About 68 freezing nights a year on a lot with almost no fall

Lancaster is the coldest place we pour. NOAA's 1991 to 2020 normals for Fox Field show an average low of 29.7 degrees in December and 31.3 in January, and about 68 nights a year at or below freezing. That is roughly two weeks more frost than Palmdale Airport records to the south. Rain is scarce, under 7 inches in a normal year, and most of it falls from December through March, the same months as the frost.

On a flat lot that combination is the problem: water that cannot run off sits in low spots and can freeze there overnight. So the drainage is worked out before the pour. Forms are set so the slab falls away from the house and toward the street, and the control joints are laid out as part of the same plan. Where a backyard has no outlet, we can add a drain and carry the water to the front in pipe.

### 1950s streets near the BLVD, 1980s tracts on either side

Lancaster is older at the center than its neighbor to the south. The railroad came through in 1876, the city incorporated in 1977, and the census counted 48,027 people in 1980 and 97,291 in 1990. About 17 percent of the housing dates from the 1950s and 1960s, and the median home from 1986. Downtown, Lancaster Boulevard between 10th Street West and Sierra Highway is now the BLVD district.

Concrete from the 1950s is past patching. A front walk or single car driveway that age has often broken up and lifted, and the answer is demolition and a new pour. The 1980s tracts, about a quarter of the city, are reaching the same point with their driveways now. Homes built since 2000 make up another quarter, and there the usual needs are patios, side yard slabs and walks the builder never poured.

### Widening a driveway or adding an RV pad: the 50 percent rule

Before you pave more of the front yard, know Lancaster's limit. The City's residential design standards say flat, paved surfaces, driveways included, may not cover more than 50 percent of a single-family front yard. They also say permanent parking for RVs, boats and similar large items belongs behind the front plane of the house. Ask the Planning Division how those standards apply to your lot before a wider driveway is drawn.

That usually points an RV or boat pad to the side yard. A pad for a heavy vehicle is built heavier than a patio, with more base, more thickness and more steel, sized to the weight that will sit on it. Driveways and walks no more than 30 inches above grade do not need a building permit under the state code Lancaster has adopted. The approach at the curb is public right of way, so changing it needs the City's approval first.

### Lancaster questions

**Do I need a permit for a fence or block wall in Lancaster?**
Building and Safety does not require a permit for a residential fence less than 7 feet tall. The zoning code still limits height to 4 feet in the front yard setback and 6 feet along the side and rear yards, and it sets where the wall can stand. Retaining walls follow different rules. We will tell you at the estimate what your wall is likely to need.

**How often does it freeze in Lancaster, and does that hurt concrete?**
About 68 nights a year reach freezing or below at Fox Field, by NOAA's 30 year normals. Standing water is what the cold works on, so on Lancaster's flat lots we plan the fall of the slab and the drainage around it before the pour.

**How far is Lancaster from Ikon Concrete Design?**
About 51 miles. Our yard is in Sylmar near the bottom of the 14, and the drive to downtown Lancaster takes a little over an hour without traffic. We group Antelope Valley estimates and pours so the crew makes the trip with a full day planned.

**Can I pave my whole front yard for parking in Lancaster?**
No. Lancaster's residential design standards cap flat, paved surfaces, driveways included, at 50 percent of a single-family front yard. Permanent RV and boat parking is supposed to go behind the front plane of the house. A wider driveway is usually possible inside that limit, and we measure it out at the estimate.

**How long does a Lancaster permit take when a job needs one?**
The City says a first plan review usually takes two to three weeks and each later review one to two weeks. Applications, fees and inspections run through its Accela portal. Most of our jobs start about two weeks after the estimate is approved, and permitted work starts when the permit is issued. To get the process going, send us a message.

# Service pages by city

## Retaining Walls in Los Angeles, CA

URL: [ikonconcrete.com/services/retaining-walls/los-angeles](https://ikonconcrete.com/services/retaining-walls/los-angeles)

We build retaining walls in the City of Los Angeles north of downtown: the Hollywood Hills, Los Feliz, Silver Lake, Eagle Rock, Highland Park, Studio City, Bel Air, Brentwood and the San Fernando Valley. What sets the city apart is that two rulebooks cover one wall. The Department of Building and Safety, LADBS for short, decides whether the wall needs a permit and engineering. The zoning code decides how many walls a hillside lot may have and how tall each one can be.

Ikon Concrete Design has been family owned since 1999, and our crew of eight drives in from Sylmar. Send the address and the wall height through the contact page or call (818) 464-5763. Gilbert Rico looks at the slope at a free estimate and tells you which rules your wall falls under. How we build the wall itself is covered on our retaining walls page.

**How tall can a retaining wall be in Los Angeles?**
Without a permit, 4 feet from the bottom of the footing to the top, and only with level ground behind it. With a permit and engineered plans, a hillside lot in the A or R zones is limited by the zoning code to one wall of 12 feet or two walls of 10 feet each. Anything taller needs a Zoning Administrator's approval.

**How many retaining walls can I build on a hillside lot in Los Angeles?**
One, or two if they are at least 3 feet apart horizontally and neither is over 10 feet tall. That is the limit in Municipal Code section 12.21 C.8 for residential lots in the mapped Hillside Area. A wall that LADBS orders built to repair an unsafe condition is exempt from the count.

**Does a 4 foot retaining wall need drainage?**
Yes. Even the no-permit wall in the LADBS bulletin shows an 8 by 8 inch band of gravel behind the block, with alternate head joints left open at the base or 3 inch weep holes every 6 feet. On a wet slope we add pipe behind the wall and run it into the yard's drainage system.

**Who draws the plans for a retaining wall in Los Angeles?**
A licensed civil or structural engineer hired by the owner, with a geotechnical report where the wall holds sloping ground. We will tell you at the estimate whether your wall needs a permit, and we build from the stamped drawings once the city approves them. Most jobs start about two weeks after you approve our estimate, or when the permit is issued if that comes later.

**What does a retaining wall cost in Los Angeles?**
It depends on height, access and engineering more than on length, so we do not quote walls by phone. A 4 foot garden wall on a flat Valley lot and a 10 foot wall on a Hollywood Hills slope have little in common. See our Los Angeles page for where we work, and ask about the grading if the slope has to be cut back first.

## Drainage Systems in Los Angeles, CA

URL: [ikonconcrete.com/services/drainage-systems/los-angeles](https://ikonconcrete.com/services/drainage-systems/los-angeles)

We install drainage systems in Los Angeles north of downtown, and a large share of that work is on hillside lots in the Hollywood Hills, Studio City, Bel Air, Brentwood, Eagle Rock and the Valley foothills. Drainage is the work we specialize in. In this city the hard question is rarely which pipe to use. It is where the water is allowed to end up, because the building code gives a hillside owner three legal places to send it, and the lot next door is not one of them.

The parts of a system, from French drains to channel drains, are explained on our drainage systems page. This page covers the Los Angeles rules. For a free estimate, send photos and the address through the contact page or call (818) 464-5763, Monday to Saturday, 6 AM to 7 PM.

**Where does hillside drainage have to go in Los Angeles?**
To a public street, a natural watercourse or a drainage facility LADBS has approved, such as an infiltration system or a pumped sump. It cannot be turned loose on a slope, and it cannot be piped onto the lot below without a recorded easement. On most lots we see, that means solid pipe to the curb.

**Can I drain water onto my neighbor's property in Los Angeles?**
Only the way it has always flowed naturally. LADBS does not allow grading, walls or pipes that increase the water reaching a neighbor or change how it gets there, and a pipe across the line takes a drainage easement signed by every owner and recorded with the county. The same rule protects you if the lot above yours changes its drainage.

**Do I need a permit to put a drain through the curb in Los Angeles?**
Yes. The curb and sidewalk are public right of way, so the Bureau of Engineering has to issue a permit before the curb is cored or cut. The drainpipe must clear the top of the curb by at least 2 inches. We will tell you at the estimate what your street is likely to need.

**What are the downsides of a French drain?**
It only collects water that is already in the ground, it needs somewhere legal to empty, and it stops working once soil gets into the gravel. On a slope the perforated pipe belongs only where water has to be collected, with solid pipe from there to the outlet, so the drain does not feed water back into the hillside. Runoff crossing a patio or coming off a roof is a job for area drains.

**How much does a drainage contractor cost in Los Angeles?**
There is no flat rate, because the fall of the lot and the route to the street decide the design. Hillside jobs usually take more than flat yards: more hand digging, deeper trenches and often a curb permit. Our price comes from a free on-site estimate, and work usually starts about two weeks after you approve it. If the slope also needs holding back, see retaining walls and grading.

## Concrete Staining in Los Angeles, CA

URL: [ikonconcrete.com/services/concrete-staining/los-angeles](https://ikonconcrete.com/services/concrete-staining/los-angeles)

We stain concrete in Los Angeles north of downtown, indoors and out: porches and patios in Highland Park and Eagle Rock, driveways in Los Feliz and Studio City, pool decks in the hills, and living room slabs in Valley ranch houses once the carpet comes up. Two things shape the work here. Most of the concrete is old, and the sun works on it for most of the year.

Staining and coloring are among the services Ikon Concrete Design puts first, and Gilbert Rico, the owner, looks at every slab before we price it. How acid and water-based stains work is explained on our concrete staining page. This page covers how a Los Angeles slab's age and exposure change the plan. For a free estimate, text photos of the slab to (818) 464-5763 or use the contact page.

**Can you stain 20 year old concrete?**
Yes. Twenty years is young for Los Angeles, where more than four homes in ten went up before 1960. What matters is the surface: it has to be sound, bare and able to absorb water. We stain a test spot before you commit to a color.

**Is staining concrete a good idea in Los Angeles?**
For a sound slab, yes. The summers are dry, and staining puts color on concrete you already have instead of tearing it out. It is a poor idea on a slab that is flaking, heavily patched or lifting, and we will tell you so.

**Which sealer holds up best outdoors in Los Angeles?**
An acrylic made for exterior concrete, applied thin. Epoxy sealers can yellow in sunlight and belong indoors. No film sealer is permanent in this much sun, so plan on a cleaning and a fresh coat when the surface starts to look dry and dull.

**Can I stain the sidewalk or the driveway apron in front of my Los Angeles house?**
Not as part of an ordinary staining job. Both sit in the public right of way and are built to the city's standard plans, and a finish outside those plans may need a revocable permit from the Bureau of Engineering. We stop the stain at your property line and can cut a clean border there on a driveway.

**How much does concrete staining cost in Los Angeles?**
It depends mostly on prep and on how many colors and saw cuts the design has, so we price each slab after seeing it. Stripping paint or repairing an old slab first adds to the work, and no two slabs need the same prep. Estimates are free anywhere in our Los Angeles service area.

## Foundations & Structural Concrete in Los Angeles, CA

URL: [ikonconcrete.com/services/concrete-foundations/los-angeles](https://ikonconcrete.com/services/concrete-foundations/los-angeles)

Ikon Concrete Design pours new foundations and structural concrete in Los Angeles north of downtown: slabs and footings for ADUs and additions in the Valley, Highland Park and Eagle Rock, and grade beams and pier foundations on hillside lots from Studio City to Bel Air. We build what your engineer drew and the Department of Building and Safety (LADBS) approved. We are a new construction crew. Foundation repair, earthquake retrofit and house bolting are a different specialty, and we do not offer them.

Send the plans, or the address if the plans are not finished, through the contact page or text them to (818) 464-5763. The estimate is free. Slab and footing basics are on our foundations page. This page covers what Los Angeles adds to the job: plan rules for ADUs, setbacks from slopes and deputy inspectors.

**When is a deputy inspector required for a foundation in Los Angeles?**
When the concrete is structural and falls outside the code's exceptions. Footings for houses and ADUs of three stories or less are exempt if they were designed at 2,500 psi or lower, and so are nonstructural slabs on the ground. Caissons, their grade beams and higher strength designs get a deputy, and your engineer will tell you which inspections your plans carry.

**Does the city's pre-approved ADU plan cover the foundation in Los Angeles?**
Not for your particular lot. LADBS pre-approves the building design, and the applicant still submits site-specific information for review, including foundation requirements. Have your designer or engineer confirm the footing design for your soil before anyone forms a trench.

**How close to a slope can a foundation be built in Los Angeles?**
It depends on how tall and how steep the slope is. Where it is steeper than 3 to 1, the building code sets a setback, and an LADBS bulletin shows the standard ways of meeting it. Your engineer and the soils report set the distance for your lot.

**Who hires the engineer and the inspectors for a new foundation?**
The owner does. The structural engineer, the soils firm and any deputy inspector work for you, and the city inspector comes with the permit. We build from their approved drawings and schedule each pour around their inspections.

**How much does a new foundation cost in Los Angeles?**
The plans set it, not the floor area, so there is no honest price per square foot. An ADU slab on a flat lot and a hillside foundation on grade beams are different jobs even at the same size. Send the drawings and we will price the concrete at a free estimate anywhere in our Los Angeles service area.

## Concrete Driveways in Los Angeles, CA

URL: [ikonconcrete.com/services/concrete-driveways/los-angeles](https://ikonconcrete.com/services/concrete-driveways/los-angeles)

We pour and replace concrete driveways in Los Angeles north of downtown, from flat Valley lots to steep drives in the Hollywood Hills, Silver Lake and Bel Air. A Los Angeles driveway is really two jobs. The slab on your lot follows the zoning code. The approach, the piece that crosses the parkway and sidewalk to reach the street, sits in the public right of way and needs an A-Permit from the Bureau of Engineering.

This page explains both sets of rules. Thickness, steel and joints are chosen for each site and any plans it has, and the general build is on our concrete driveways page. Ikon Concrete Design is family owned and has poured driveways since 1999. For a free estimate, send the address and a photo of the existing driveway through the contact page or call (818) 464-5763.

**What is an A-Permit, and when does a Los Angeles driveway need one?**
It is the Bureau of Engineering's permit for small construction in the public right of way, including driveway approaches, sidewalks and curbs. Any time the apron between your property line and the street is built, widened or replaced, it needs one. Concrete that stays entirely on your lot is outside the A-Permit.

**How steep can a driveway be in Los Angeles?**
Twenty percent is the maximum under section 12.21 A.5(g) of the Municipal Code. The only exception in that section is an existing driveway that has to be modified because of a public improvement project, with the City Engineer's approval. The changes in grade at the top and bottom have their own transition standards.

**How wide can a driveway be in Los Angeles?**
The driveway on the lot must be at least 9 feet wide, and the apron at the curb for a house runs from 10 to 18 feet. On R1 lots outside the Hillside Area, the driveway at the front property line is capped at 25 percent of the lot width or its existing width. A wider apron takes a written deviation request to the Bureau of Engineering.

**Can I get a concrete driveway approach on a Los Angeles street with no curb?**
Not where the street is paved and has no curb. The city's permit manual calls for an asphalt approach there, with a recorded waiver from the owner and a revocable permit. We can still pour the driveway on your side of the property line in concrete.

**How much does a concrete driveway cost in Los Angeles?**
It depends on size, slope, demolition and what the approach needs, so a flat Valley driveway and a hillside drive are priced very differently. We measure and price every job on site at no charge. If the public walk in front is broken too, see concrete sidewalks, and our Los Angeles page lists the neighborhoods we cover.

## Decorative Concrete in Los Angeles, CA

URL: [ikonconcrete.com/services/decorative-concrete/los-angeles](https://ikonconcrete.com/services/decorative-concrete/los-angeles)

We design and pour decorative concrete for homes in Los Angeles north of downtown: motor courts and driveways in Bel Air and Brentwood, patios and pool surrounds in the Hollywood Hills and Studio City, walks and porches in Los Feliz, Eagle Rock and Highland Park. Here a finish is rarely picked from a catalog. It is picked to sit next to a particular house, whether that is a 1920s Mediterranean, a Craftsman bungalow or a glass walled mid-century, and on many lots the zoning code or a historic district has a say in the front yard.

Decorative concrete has been a core part of our work since Ikon Concrete Design started in 1999. The finishes themselves are compared on our decorative concrete page, and our gallery shows jobs by our own crew. For a free estimate, use the contact page or call (818) 464-5763.

**What decorative concrete finish suits a Spanish or Mediterranean house in Los Angeles?**
Warm, quiet finishes. Integral color or an acid stain in tan, sand or terra cotta tones, a hand troweled or light stone texture, and darker bands or tile insets look right next to stucco and clay tile. Heavy plank or cobble stamps usually look out of place on those houses. See concrete staining for the earth tone options.

**Can I pave my whole front yard as a motor court in Los Angeles?**
Not the required front yard. The zoning code allows no parking spaces there, limits access driveways to 50 percent of it, and requires the rest of it to be planted in the R zones. A court set behind the required front yard is not under that 50 percent limit, so the first step is finding where the setback line falls on your lot.

**Do I need approval for decorative concrete in a Los Angeles historic district?**
Yes. In a Historic Preservation Overlay Zone, all exterior work is reviewed against the district's Preservation Plan, and City Planning counts landscaping as exterior work. Some projects are handled by staff and others go to the district's board, so ask the planner assigned to your district before you set a start date.

**What is the downside of stamped concrete?**
Upkeep and repairs. The sealer that gives stamped concrete its color depth wears in the Los Angeles sun and has to be renewed, and a damaged section is hard to patch so it matches. Dark colors also run hot under bare feet in summer. Our stamped concrete page covers how we limit each of those.

**How much does decorative concrete cost in Los Angeles?**
It depends more on the site than on the finish. Access, demolition, the number of separate pours and the hand detail usually outweigh the cost of the color or the stamp. We price each job on site at no charge, anywhere in our Los Angeles service area.

## Grading & Hillside Construction in Los Angeles, CA

URL: [ikonconcrete.com/services/grading-hillside/los-angeles](https://ikonconcrete.com/services/grading-hillside/los-angeles)

We do grading and hillside construction in Los Angeles north of downtown: cut and fill for pads, driveways and walls in the Hollywood Hills, Studio City, Bel Air, Brentwood, Eagle Rock and the Valley foothills. On a Los Angeles hillside, how much dirt you may move is settled on paper first. The zoning code caps the cubic yards. The building code sets when a permit, a soils report, a bond and a haul route hearing are needed. The calendar restricts work in the rainy season.

The grading plan and the soils report come from your civil engineer and your geotechnical firm. We are the contractor who builds to them, with the crew that pours the footings and walls afterward. Our approach to the work itself is on the grading and hillside page. To talk through a lot, use the contact page or call (818) 464-5763 for a free estimate.

**How much grading is allowed on a hillside lot in Los Angeles?**
On an R1, RS, RE or RA lot in the Hillside Area, cut and fill combined are limited to 1,000 cubic yards plus 10 percent of the lot area in square feet, and never more than the cap for the zone. That cap is 1,000 cubic yards in R1 and rises to 6,600 in RE40. Your civil engineer calculates the quantities and what is exempt.

**When does a grading job in Los Angeles need a haul route hearing?**
When more than 1,000 cubic yards of earth will be imported or exported in a hillside area. The haul route goes to a public hearing before the Board of Building and Safety Commissioners, after review by Public Works and the Department of Transportation. Smaller jobs still have to follow the hauling hours and any route conditions LADBS writes into the permit.

**Can you grade during the rainy season in Los Angeles?**
Yes, with conditions. From October 1 to April 15, permitted grading over 200 cubic yards cannot begin until LADBS approves an erosion control system for the site. On a job that will still be open in October, we plan the erosion control with your engineer before the first storm.

**Do I need a soils report to grade my lot in Los Angeles?**
Always above 5,000 cubic yards, and often well below that on a hillside. LADBS says geotechnical reports are required for many projects, especially hillside ones with basements, deep foundations or retaining walls, or sites in seismic hazard zones. The report comes from a geotechnical firm hired by the owner, and we build to its recommendations.

**What type of contractor does grading?**
A licensed contractor working from a civil engineer's grading plan, with a soils firm testing the compaction. Ikon holds California license 770901 in the B General Building and C-8 Concrete classifications, and we grade as part of the foundations, walls, driveways and drainage we build. See our Los Angeles page for the areas we cover.

## Stamped Concrete in Santa Clarita, CA

URL: [ikonconcrete.com/services/stamped-concrete/santa-clarita](https://ikonconcrete.com/services/stamped-concrete/santa-clarita)

We pour and stamp concrete driveways, patios, walks and pool decks in Santa Clarita, from the late 1960s tracts of south Valencia to the hill streets of Saugus and Canyon Country. Our crew comes up from Sylmar over the Newhall Pass. Three things make stamped work different in this city: a homeowners association may have to approve the pattern and color before any concrete is ordered, the Planning Division limits how much of a front yard can be hard surface, and summer heat decides what time of day the work gets done.

The slab itself and the color methods are on our main stamped concrete page. This one is about doing the job in Santa Clarita. Estimates are free. Call or text (818) 464-5763, or send a message with a few photos of the area.

**Do I need HOA approval for stamped concrete in Santa Clarita?**
Yes, if your governing documents require approval for exterior changes, and you need it before work starts. Color gets the closest look. The Valencia Northbridge association's published paint palette, for one, says every color selection needs the architectural committee's approval before it is applied. We give you the pattern and color names to put on the application.

**Does a stamped concrete driveway need a permit in Santa Clarita?**
The slab on your lot does not need a building permit when it is within 30 inches of the surrounding grade. Any work on the apron, curb or sidewalk needs an encroachment permit from the city's Engineering Services Division, and a wider driveway has to fit the Planning Division's front yard landscaping limit. We will tell you at the estimate whether your job needs a permit.

**How much does a 20x20 stamped concrete patio cost?**
We do not price stamped work from a size alone. On a 20 by 20 patio the number moves with how the crew reaches the backyard, whether old concrete has to be broken out and hauled off, the base and grading, the steel, borders or a second color, and the pattern you pick. We see all of that at a free estimate at your house and give you a price for your lot.

**What is the downside of stamped concrete?**
Upkeep and repairs. The sealer wears under sun and tires and has to be renewed, and if a section is ever cut out to reach a pipe, the patch will not match the old color and pattern exactly. If you want the least upkeep, a broom finish with integral color is the simpler choice.

**What is the best time of year to pour stamped concrete in Santa Clarita?**
Any month works when the pour is timed to the weather. Spring and fall are the easy seasons. In winter we watch the forecast, because about 14 of the roughly 17 inches of rain the Newhall station records in a normal year fall from December through March, and rain on a freshly colored slab leaves marks.

## Concrete Driveways in Santa Clarita, CA

URL: [ikonconcrete.com/services/concrete-driveways/santa-clarita](https://ikonconcrete.com/services/concrete-driveways/santa-clarita)

We tear out and pour concrete driveways in Santa Clarita, in Valencia, Saugus, Newhall and Canyon Country. A driveway in this city is two pieces under two sets of rules. The slab on your lot is yours, and the Unified Development Code decides how wide it can grow and how steep it can run. The apron between the sidewalk and the street sits in the public right of way, and work there goes by a city encroachment permit and a city inspector's clock.

Thickness, steel and joints are set for each driveway and its site, and our main concrete driveways page walks through the build. This one gives homeowners in Santa Clarita the local rules before they plan. Ikon Concrete Design is family owned and has been in the concrete trade since 1999. Estimates are free. Call or text (818) 464-5763.

**Do I need a permit to replace a driveway in Santa Clarita?**
Only for the part in the public right of way. The apron, curb and sidewalk take an encroachment permit from Engineering Services. The slab on your own lot is exempt from a building permit under the city's code as long as it is not more than 30 inches above the adjacent grade.

**How wide can I make my driveway in Santa Clarita?**
Up to 10 feet past the width of your garage, on the side away from the front door. A wider request is reviewed by the Community Development Director, and half of the required front yard has to remain landscaped. Your HOA can be stricter than the city.

**How steep can a driveway be in Santa Clarita?**
Twenty percent is the limit in the Unified Development Code. Steeper driveways need the City Engineer and the Fire Department to sign off, which the code allows for oak trees, topography or similar conditions.

**How much would a 20x40 concrete driveway cost?**
Size is only the start. On a driveway that big the price turns on tearing out and hauling off the old slab, the base and grading, the steel, the finish, any drain across it, and whether the apron needs its own encroachment permit. We do not publish prices. Your number comes from a free estimate at the house.

**Which is cheaper for a driveway, blacktop or concrete?**
Blacktop usually costs less to put in. Concrete Network's guide notes that concrete asks for less upkeep than asphalt over the years, so the choice comes down to what you spend now against upkeep later. Santa Clarita accepts either one: the code requires a solid surface driveway on any parcel under one acre.

## Retaining Walls in Santa Clarita, CA

URL: [ikonconcrete.com/services/retaining-walls/santa-clarita](https://ikonconcrete.com/services/retaining-walls/santa-clarita)

We build reinforced block retaining walls in Santa Clarita, most of them at the toe or the top of the slopes that separate one tract pad from the next in Saugus, Canyon Country, Valencia and Newhall. Three things get settled before any block is ordered here: whether the wall needs a permit and an engineer, whose slope it is, and where the water behind the wall will go when the winter rain comes all at once.

How a block wall goes together, footing to cap, is on our main retaining walls page. This page covers the rules and the ground in Santa Clarita. Ikon Concrete Design is family owned, in business since 1999, with a crew of eight. Estimates are free: call or text (818) 464-5763 or send a message.

**Do I need a permit to build a retaining wall in Santa Clarita?**
Yes, once the wall is over 4 feet from the bottom of the footing, or over 30 inches when it supports a slope or another load. Any retaining wall drawn on a grading plan needs its own building permit. We will tell you at the estimate whether your wall needs a permit.

**Does a 4 ft retaining wall need drainage?**
Yes. Every retaining wall needs a way to let water out, whatever its height, because wet soil pushes much harder than dry soil. Santa Clarita's standard plan shows waterproofing on the back of the block, free draining backfill and a perforated pipe run to daylight at an approved location.

**Who is responsible for a retaining wall between two lots in Santa Clarita?**
Start with whose land it stands on, which the recorded tract map or a survey will show. If the slope is HOA common area or sits in a Landscape Maintenance District zone, the association or the city's Special Districts office is the one to call. Settle it before you build, because a wall on ground you do not own needs the owner's permission.

**How much is a 100 ft retaining wall?**
Length is only one part of it. Height decides whether the wall needs an engineer and a permit, and on a Santa Clarita slope the price also moves with access through the side yard, digging the footing, hauling soil out, the drain behind the wall and plan check. We price each wall after a free estimate on site.

**Are railroad tie or wood retaining walls allowed in Santa Clarita?**
Not under the city's building code. It states that retaining walls assigned to Seismic Design Category D, E or F shall not be constructed of wood, and Santa Clarita's design criteria list those categories for the city. We build in reinforced concrete block on a concrete footing.

## Drainage Systems in Santa Clarita, CA

URL: [ikonconcrete.com/services/drainage-systems/santa-clarita](https://ikonconcrete.com/services/drainage-systems/santa-clarita)

Drainage is the work Ikon Concrete Design specializes in, and Santa Clarita gives us a lot of it. Tract after tract in Saugus, Canyon Country and the hills of Valencia was graded as flat pads stepped up the terrain, with a slope between yards and a swale or a pipe meant to carry rain out to the street. Years later the swale is often filled in, the builder's drains are packed with roots and silt, and the water goes where it wants. We find where it was supposed to go and rebuild that path.

French drains, area drains and channel drains are explained on our main drainage systems page. This page is about the rules and the ground in Santa Clarita. We are family owned and have been in business since 1999. Estimates are free: call or text (818) 464-5763 or send a message.

**Where can my yard drains discharge in Santa Clarita?**
Into the street, or into the drainage outlet your lot was graded for. City grading rules keep piped water off graded slopes, and you need a recorded agreement before any of it crosses onto a neighbor's lot. An outlet through the curb needs an encroachment permit, since the curb belongs to the public right of way.

**Who maintains the concrete ditch on the slope behind my Santa Clarita house?**
The lot owner, the HOA or a public agency, and the recorded documents for your tract say which. Santa Clarita's grading standards require a plan to state who is responsible for slope maintenance, drainage devices included. Whoever it is has to keep the ditch clear, because a blocked one spills down the face of the slope.

**Do plumbers do outdoor drainage?**
Plumbers clear and repair pipes, and that includes a blocked yard drain line. Fixing the reason a yard floods is grading and concrete work: setting the fall of the ground, placing inlets, cutting and repouring slabs, and building the outlet at the curb. That is a concrete contractor's job, and it is the work we specialize in.

**Can I dig a hole and fill it with gravel for drainage?**
Only where the ground will take the water. A gravel pit can dry out a small low spot in the sandy loam of the valley floor. In hill soil like Castaic silty clay loam, which the USDA rates as moderately slow to let water through, the hole fills and stays full. On those lots a grated inlet piped to the street is the better fix.

**How much does a drainage contractor cost in Santa Clarita?**
It depends on the feet of pipe, how deep the trench must go to keep its fall, how much concrete has to be cut and repoured, and whether the outlet goes through the curb. We do not publish prices, and nobody can price drainage honestly without seeing the lot. The estimate is free and done on site, and most jobs start about two weeks after you approve it.

**My Santa Clarita home is below a burn area. Who do I call before a storm?**
Start with the city's Ready for Rain page, which covers sandbags, alerts and evacuation orders. For a clogged storm drain in the street, the city lists its storm water line at (661) 222-7222. In unincorporated areas such as Castaic and Stevenson Ranch the agency is Los Angeles County Public Works, at (800) 675-4357.

## Block Walls & Stone Walls in Santa Clarita, CA

URL: [ikonconcrete.com/services/block-walls/santa-clarita](https://ikonconcrete.com/services/block-walls/santa-clarita)

We build block walls in Santa Clarita: property line walls between tract lots, front garden walls with pilasters, and replacements for wood fences and older walls that have started to lean. Block wall construction is one of the main lines of work at Ikon Concrete Design, a family owned company in business since 1999. In this city the job is shaped by three things: the height limits in the Unified Development Code, the city's own standard detail for a block fence wall, and the fact that a new wall usually has to sit next to a neighbor's or an HOA's older one.

Footings, block types and finishes are covered on our main block walls page. This page is the local rulebook for Santa Clarita. Estimates are free. Call or text (818) 464-5763 or send us a message.

**How tall can a block wall be in Santa Clarita?**
Six feet on interior side and rear property lines and 42 inches in required yards that face a street, under Unified Development Code section 17.57.070. Corner lots get the 42 inch limit on the street side as well as the front. Your HOA may set a lower number or a required style.

**Do I need a permit for a block wall in Santa Clarita?**
Yes, when the wall or a pilaster is over 42 inches tall. Shorter walls are exempt from the building permit if Planning allows them at that spot and they are not in a flood hazard area or part of a pool barrier. A permitted wall built to the city's standard detail gets four inspections.

**Who pays for a block wall between neighbors in Santa Clarita?**
State law presumes the two owners split the reasonable cost equally unless they agree otherwise in writing. Civil Code section 841 also lets a court weigh whether the cost comes from one owner's personal taste, which is worth knowing if you want stone or stucco and your neighbor is content with plain block. The presumption does not apply to a city or other public agency that owns the land next door.

**Can I put a block wall on top of a retaining wall in Santa Clarita?**
It depends on what the lower wall holds. Where it protects a cut and your lot is the lower one, the code allows the usual fence or wall height on top. Where it holds fill inside a required yard, the code provides for an open safety fence up to 3 1/2 feet at the top, and a solid wall beside it must be set back 1 foot for each foot of its height. Those rules cover land averaging under a 10 percent slope, and steeper sites fall under the hillside section.

**How much does a block wall cost?**
Length and height set most of it, because they decide the footing, the block, the steel and the grout. In Santa Clarita the other drivers are hand digging beside an existing fence or wall, removing what is there, pilasters and gates, split face or slump block over plain block, and the permit with its inspections for anything over 42 inches. We do not publish prices, and our number comes from a free estimate on site.

# Articles

## What Sets the Cost of a Concrete Driveway in Los Angeles?

URL: [ikonconcrete.com/blog/concrete-driveway-cost-los-angeles](https://ikonconcrete.com/blog/concrete-driveway-cost-los-angeles)

The price of a concrete driveway in Los Angeles comes from the lot, not a chart. Size, how the trucks and crew reach the work, tearing out and hauling off the old slab, base and grading, steel, the finish you pick, drainage, and any plans, permits or HOA approval all change the number. That is why we price every driveway at a free on-site estimate.

## Do You Need a Retaining Wall Permit in Los Angeles or Santa Clarita?

URL: [ikonconcrete.com/blog/retaining-wall-permit-los-angeles-santa-clarita](https://ikonconcrete.com/blog/retaining-wall-permit-los-angeles-santa-clarita)

In the City of Los Angeles, the City of Santa Clarita and unincorporated Los Angeles County, a retaining wall needs a building permit once it is over 4 feet tall, measured from the bottom of the footing to the top of the wall. A slope or other load behind the wall cancels that exemption in Los Angeles and the county, and Santa Clarita cuts it to 30 inches.

## Stamped Concrete vs Pavers: Which Fits Your Driveway or Patio?

URL: [ikonconcrete.com/blog/stamped-concrete-vs-pavers](https://ikonconcrete.com/blog/stamped-concrete-vs-pavers)

Stamped concrete is one poured slab with the pattern pressed in, so there are no sand joints to weed and no loose units to shift. Pavers are separate units on sand that lift out and go back without a patch, which makes them the better pick when something under the surface may need digging up. The choice comes down to the look you want, the upkeep you will do and what the ground is likely to do.

## How Tall Can a Block Wall Be in Los Angeles and Santa Clarita?

URL: [ikonconcrete.com/blog/block-wall-height-limits-los-angeles](https://ikonconcrete.com/blog/block-wall-height-limits-los-angeles)

In the City of Los Angeles, a wall in a residential (R) zone can be 3 1/2 feet tall in the front yard and 6 or 8 feet in side and rear yards, depending on lot width and hillside status. Santa Clarita allows 42 inches beside a street and 6 feet on interior side and rear lot lines. Both cities require a building permit for masonry over 3 1/2 feet.

## Acid Stain vs Water Based Stain for Concrete

URL: [ikonconcrete.com/blog/acid-stain-vs-water-based-concrete-stain](https://ikonconcrete.com/blog/acid-stain-vs-water-based-concrete-stain)

Acid stain is a solution of metallic salts that reacts with the lime in concrete and leaves mottled earth tones in the surface itself. Water-based stain carries fine pigment into the pores with no reaction, so it comes in more colors and works on old slabs that acid will not color. Outdoors, acid stain handles sun and tires better. Both have to be sealed.

## French Drain vs Channel Drain: Which One Fixes Your Yard?

URL: [ikonconcrete.com/blog/french-drain-vs-channel-drain](https://ikonconcrete.com/blog/french-drain-vs-channel-drain)

A French drain is a gravel trench with a perforated pipe that collects water soaking through the soil along its whole length. A channel drain is a grated trough set in concrete that catches water running across a hard surface. Soggy ground that stays wet calls for a French drain. Water sheeting toward a garage or door calls for a channel drain.

## How Often Should Stamped Concrete Be Resealed?

URL: [ikonconcrete.com/blog/how-often-to-reseal-stamped-concrete](https://ikonconcrete.com/blog/how-often-to-reseal-stamped-concrete)

Reseal stamped concrete when it needs it, which published guides put at every 2 to 5 years for most slabs. The Decorative Concrete Council says to go by condition and not the calendar: reseal when water stops beading and the color loses its depth. Resealing every year builds up a thick film that can trap moisture, turn white and peel.

## How Thick Should a Concrete Driveway Be?

URL: [ikonconcrete.com/blog/how-thick-should-a-concrete-driveway-be](https://ikonconcrete.com/blog/how-thick-should-a-concrete-driveway-be)

Concrete Network's general guidance is at least 4 inches of concrete for passenger cars and SUVs, and 5 to 6 inches with rebar for a heavy truck or a large RV. Citing the Tennessee Concrete Association, it says the step from 4 to 5 inches raises load capacity by nearly 50 percent. On a real driveway, thickness and steel are set for that site and its plans: the soil, what will drive on it and what the city requires.

## How Long Does Concrete Take to Cure in Southern California?

URL: [ikonconcrete.com/blog/how-long-does-concrete-take-to-cure](https://ikonconcrete.com/blog/how-long-does-concrete-take-to-cure)

Concrete Network publishes waits of about 24 hours before walking on new concrete, 7 days before parking a car on it and 28 days before an RV or loaded truck. Twenty-eight days is also the age at which concrete strength is normally measured. The mix and the weather on your job can lengthen those waits, and Southern California heat, which makes concrete set faster, does not shorten them.

## What Goes Into an ADU Foundation in Los Angeles?

URL: [ikonconcrete.com/blog/adu-foundation-los-angeles](https://ikonconcrete.com/blog/adu-foundation-los-angeles)

Most backyard ADUs in Los Angeles sit on a slab on grade. The city's prescriptive minimums call for footings at least 24 inches deep at the exterior walls, a slab at least 3 1/2 inches thick with 1/2 inch rebar at 16 inches each way, a vapor barrier under it, and anchor bolts cast into the edges. Your engineer's stamped plans govern the real job.